300 West Bikeway

Greenway in Utah · OpenStreetMap relation

Runs through Salt Lake City · Salt Lake County

Conditions now

Loading the weather near Salt Lake City…

Forecast by the National Weather Service for Salt Lake City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 300 West mile 0.1 directions to trailhead 1
  2. Parking at 500 South mile 0.1 directions to trailhead 2
  3. Parking at 600 South mile 0.3 directions to trailhead 3
  4. Parking at 300 West mile 0.4 directions to trailhead 4
  5. Parking at 700 South mile 0.5 directions to trailhead 5
  6. Parking at Wasatch Place mile 0.5 directions to trailhead 6
  7. Parking at Wasatch Place mile 0.5 directions to trailhead 7
  8. Parking at 300 West mile 0.8 directions to trailhead 8
  9. Parking at 300 West mile 0.8 directions to trailhead 9
  10. Parking at American Avenue mile 0.9 directions to trailhead 10
  11. Parking at Brooklyn Avenue mile 1 directions to trailhead 11
  12. Parking at 300 West mile 1.1 directions to trailhead 12
  13. Parking at 300 West mile 1.1 directions to trailhead 13
  14. Parking at 300 West mile 1.1 directions to trailhead 14
  15. Parking at Paxton Avenue mile 1.2 directions to trailhead 15
  16. Parking at Lucy Avenue mile 1.2 directions to trailhead 16
  17. Parking at Paxton Avenue mile 1.2 directions to trailhead 17
  18. Parking at 300 West mile 1.4 directions to trailhead 18
  19. Parking at 1400 South mile 1.5 directions to trailhead 19
  20. Parking at 300 West mile 1.5 directions to trailhead 20
  21. Parking at Hope Avenue mile 1.5 directions to trailhead 21
  22. Parking at Hope Avenue mile 1.5 directions to trailhead 22
  23. Parking at 300 West mile 1.5 directions to trailhead 23
  24. Parking at 300 West mile 1.5 directions to trailhead 24
  25. Vacuums mile 1.6 directions to Vacuums
  26. Parking at Whitney Avenue mile 1.6 directions to trailhead 26
  27. Parking at Harris Avenue mile 1.7 directions to trailhead 27
  28. Parking at Harris Avenue mile 1.8 directions to trailhead 28
  29. Parking at 300 West mile 2 directions to trailhead 29
  30. Parking at 300 West mile 2.1 directions to trailhead 30
  31. Parking at 300 West mile 2.1 directions to trailhead 31
  32. Parking at 1830 South mile 2.1 directions to trailhead 32

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

300 West Bikeway (opens in a new tab)
Photo: troysalt · CC BY-SA 4.0 · Mapillary

About this trail

The 300 West Bikeway is a two-way bikeway on 300 West in Salt Lake City, Utah, built by the city's Transportation Division. The OpenStreetMap route behind this page follows it for about 1.9 miles, from 400 South south to Hartwell Avenue. It combines two city projects: a protected bikeway north of 900 South, and the bicycle facilities of the 300 West street reconstruction south of it.

The southern part came with the reconstruction of 300 West from 2100 South to 900 South, which began in 2021, was delayed by post-pandemic material and labor shortages and utility work, and was announced complete in July 2023. The city says the project, funded by the voter-approved 2018 Funding Our Future bond, added pedestrian and bicycle facilities for all ages and abilities; the city now calls this section the 300 West shared-use path. North of 900 South, the city designed a protected two-way bikeway to 400 South between spring 2024 and the winter of 2024–25, built it in summer 2025, and reports it complete. It was built within the existing roadway, without reconstructing curbs or sidewalks. The block from 400 South to 300 South, owned by the Utah Department of Transportation, was dropped from the original plan at that agency's request.

The bikeway links the 300 West and 9-Line shared-use paths with the 400 South Viaduct Trail and the protected bike lanes on 300 South. OpenStreetMap maps the section from 900 South to 400 South as asphalt separated from traffic by a curb, and the section to the south as a concrete path about 10 feet (3 meters) wide, with signalized crossings at the major streets.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Salt Lake Triad Ctr, 3 km from the trail's middle, 15 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404656627283919080665240
Low °F283139445260706858473728
Precipitation, in1.51.422.52.11.10.60.61.31.41.61.6
Snow, in10.79.86.43.20.200000.47.311
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1885 Salt Lake sheet (1:250,000); the 1951 Salt Lake City South sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14451424, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. 300 West Bikeway (900 South to 400 South) — Salt Lake City Transportation · government source · checked Oct 17, 2026
    Supports: protected two-way bikeway 900 South to 400 South, built within existing roadway, design and construction timeline, completion, UDOT scope change, connections
  3. Salt Lake City announces completion of 300 West and 900 South Phase 1 Construction Projects — SLC.gov · government source · checked Oct 17, 2026
    Supports: 300 West reconstruction 2100 South to 900 South, 2021 start, delays, July 2023 completion, Funding Our Future bond, bicycle facilities
  4. 300 West Bikeway — OpenStreetMap relation 14451424 · web · checked Oct 17, 2026
    Supports: mapped extent 400 South to Hartwell Avenue, curb separation north of 900 South, surfaces, width, signalized crossings