States › Colorado

56th Avenue Trail

Greenway in Colorado

Runs through Denver · Adams and Denver counties

Conditions now

Loading the weather near Denver…

Forecast by the National Weather Service for Denver · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
6.3 mi 10.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. First Creek at DEN Open Space mile 0.1 directions to First Creek at DEN Open Space
  2. Parking at East 56th Avenue mile 2.6 directions to trailhead 2
RMA PerimeterRd (opens in a new tab)
RMA PerimeterRd · Photo: Nolabob · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The 56th Avenue Trail is a concrete shared-use path beside East 56th Avenue in northeast Denver, Colorado, running about 3 miles between Peoria Street and Peña Boulevard along the Montbello neighborhood. The name comes from OpenStreetMap. The path was planned as part of the City of Denver's project to widen 56th Avenue between Peoria Street and Peña Boulevard into a four-lane, divided roadway for people walking, biking and driving. In 2019 the city planned for the project to complete a multi-use bike and pedestrian trail on that stretch, with connections to neighborhood bike paths and the trail system of the Rocky Mountain Arsenal, paid for with $27 million from the voter-approved Elevate Denver bond program; preliminary design was to start in spring 2020 and construction in 2021. It is a roadside path, not a rail-trail.

At its eastern end, near Peña Boulevard, the path reaches the First Creek at DEN Open Space trailhead. From there the First Creek Trail, which Colorado's state trail database lists at 5.9 miles, has 4.4 miles of City and County of Denver concrete trail open to bikes and 1.4 miles of dirt trail in the Rocky Mountain Arsenal National Wildlife Refuge, where bikes are not allowed.

OpenStreetMap maps the 56th Avenue path as concrete throughout and draws path segments along both sides of the avenue, so the record's mapped length of about 6.3 miles counts much of the roughly 3-mile corridor twice.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: June and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Denver-Stapleton, 5.9 km from the trail's middle, 7 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F464856627284908880675546
Low °F181927344353595748362618
Precipitation, in0.50.51.11.72.31.72.11.81.510.70.5
Snow, in6.47.68.86.21.40000.83.97.36.6
Wildlife refuges

Passes through Rocky Mountain Arsenal National Wildlife Refuge.

Old maps

USGS topographic maps of the trail's middle go back to the 1890 East Denver sheet (1:125,000); the 1957 Sable sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. First Creek Trail — COTREX (Colorado Parks and Wildlife) · government source · checked Oct 17, 2026
    Supports: 5.9 miles; City and County of Denver 4.4 miles, Rocky Mountain Arsenal National Wildlife Refuge 1.4 miles; bikes allowed on 4.5 miles, not on 1.4 miles; concrete 4.4 miles, dirt 1.4 miles
  3. When will Denver ever fix 56th Ave near Montbello? — Denver7 (September 11, 2019) · web · checked Oct 17, 2026
    Supports: City of Denver plan to widen 56th Avenue between Peoria Street and Peña Boulevard into a four-lane, divided, multimodal roadway; project to complete the multiuse bike and pedestrian trail between Peoria and Peña with connections to neighborhood bike paths and the Arsenal trail system; $27 million from the Elevate Denver Bond Program; preliminary design spring 2020, construction anticipated 2021; Montbello
  4. 56th Avenue Trail ways — OpenStreetMap · web · checked Oct 17, 2026
    Supports: name; concrete surface; segments on both sides of 56th Avenue; First Creek at DEN Open Space trailhead at the east end

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.