A Canal Trail
Canal towpath in Oregon
Runs through Klamath Falls and Altamont · Klamath County
Conditions now
Loading the weather near Altamont…
Forecast by the National Weather Service for Altamont · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Merryman Drive mile 1.5 directions to trailhead 1
Plan your visit
- By trainAmtrak: Klamath Falls, OR (KFS) 0.5 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
A Canal Trail is a multi-use path in Klamath Falls, Oregon, that follows the A Canal, part of the Klamath Reclamation Project. Construction of the canal began in 1906, and the first water was delivered in summer 1907, according to the Herald and News. The BikeTheRail record, from OpenStreetMap, measures about 6 miles; published figures for the path vary, and the exact length was not confirmed from a manager's page.
One of the main bike paths in Klamath Falls follows the canal from Esplanade Avenue to Homedale Road. Wikipedia's article on the OC&E Woods Line State Trail says the A Canal trail intersects the OC&E trail near Summers Lane and Boardman Avenue, where the OC&E trail crosses the canal on an 1898 steel railroad bridge with an interpretive sign. The A Canal trail's northwest end connects to the Kit Carson trail, which leads to Oregon Institute of Technology and Sky Lakes Medical Center.
The OC&E Woods Line State Trail, managed by Oregon Parks and Recreation Department, follows the former Oregon, California and Eastern Railroad grade and is paved from Klamath Falls to Olene, about 8 miles. A Canal Trail itself is a canal-side path rather than a rail conversion.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and August to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Klamath Falls International Airport, 6.3 km from the trail's middle, 15 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 42 46 52 58 67 76 86 85 78 64 49 40 Low °F 22 24 26 29 36 41 48 46 39 31 25 21 Precipitation, in 1.5 1.1 1 1.1 1 0.7 0.2 0.3 0.3 0.7 1.4 1.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Klamath sheet (1:250,000); the 1957 Merrill sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/oregon
Nearby trails
- OC&E Woods Line State Trail within 0.2 mi · 65.4 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- OC&E Woods Line State Trail - Wikipedia · organization · checked Oct 17, 2026 Supports: intersection with OC&E near Summers Lane and Boardman Avenue, 1898 bridge, Kit Carson trail connection, OC&E paved to Olene, Oregon Parks and Recreation Department
- Fun facts about Klamath: When did the A Canal first deliver water to irrigators? - Herald and News · press · checked Oct 17, 2026 Supports: canal construction 1906, first water 1907, Klamath Reclamation Project, bike path from Esplanade Avenue to Homedale Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.