States › California

Alameda Creek Trail

Greenway in California · OpenStreetMap relation

Runs through Hayward and Fremont · Alameda County

Conditions now

Loading the weather near Fremont…

Forecast by the National Weather Service for Fremont · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
11.3 mi 18.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Niles Canyon Road mile 11 directions to trailhead 1
Existence. (opens in a new tab)
Existence. · Photo: Nina Stawski · CC BY · Flickr

About this trail

The Alameda Creek Regional Trail follows the banks of Alameda Creek in southern Alameda County for about 12 miles, from the mouth of Niles Canyon in Fremont's Niles District west to San Francisco Bay, passing through Fremont, Union City and Newark. The East Bay Regional Park District manages it. The trail opened in January 1973, funded by the U.S. Army Corps of Engineers, the Alameda County Flood Control and Water Conservation District and the park district. It is a creek-side path, not a rail-trail, though the Central Pacific railroad came through Niles Canyon in 1869.

The trail runs on both banks. The paved south-side trail, 12.0 miles long and the route mapped here, is the one recommended for bicyclists, walkers and runners; the unpaved north-side trail, 12.4 miles, is designed for horseback riding. Staging areas include Niles (Niles Creek), Isherwood at 2250 Isherwood Way in Fremont, Beard, and Alameda Creek Stables. The south-side trail reaches Coyote Hills Regional Park, which has no direct access from the north side, and Quarry Lakes Regional Recreation Area lies alongside the creek.

The trail is open from 5 a.m. to 10 p.m. unless otherwise posted. Motor vehicles are not allowed; Class 1 and Class 2 e-bikes may use the paved sections, and dogs are allowed. The Alameda County Flood Control District scheduled a sediment removal project between the Isherwood Staging Area and the I Street entrance in Niles from July through November 2026, with a temporary closure of the Isherwood parking lot and portions of the trail.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Newark, 7.4 km from the trail's middle, 7 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F586164677175777777736558
Low °F434648505356585858544743
Precipitation, in2.82.82.21.10.50.2000.10.71.42.8
Snow, in000000000000
Wildlife refuges

Passes beside Don Edwards San Francisco Bay National Wildlife Refuge.

Old maps

USGS topographic maps of the trail's middle go back to the 1899 Haywards sheet (1:62,500); the 1959 Newark sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2025 described the paved side as bumpy with patched seams and favored tires wider than typical road tires; one rider reported covering the gravel side on 23 mm tires without trouble. r/BAbike, May 2025 · r/BAbike, Aug 2025
  • Riders in 2024 reported a headwind when riding toward the bay, with wind building near the bay end; one rider found it mild. r/BAbike, Aug 2024 · r/BAbike, Oct 2024 · r/bayarea, Nov 2024
  • Riders in 2025 and 2026 said the dirt stretch from the bay end toward the Dumbarton Bridge turned muddy when wet; they suggested routing through Coyote Hills or along the hillside path. r/BAbike, Feb 2025 · r/BAbike, Jan 2026
  • In January 2026, riders linking the trail with the Bay Trail said few cafes or restaurants sit along the route, with food clustered near the Union City and Fremont BART stations. r/BAbike, Jan 2026
23 Reddit threads about this trail, Jan 2024 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9710844, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Alameda Creek Regional Trail — East Bay Regional Park District · organization · checked Oct 15, 2026
    Supports: route along Alameda Creek from Niles Canyon to the bay; Fremont, Union City, Newark; about 12 miles; south side paved 12.0 mi, north side unpaved 12.4 mi for horses; opened January 1973 and funders; Central Pacific through Niles Canyon 1869; staging areas; Coyote Hills and Quarry Lakes connections; hours; motor vehicles and e-bike rules; dogs; 2026 sediment removal project and closures
  3. Alameda Creek Trail (relation 9710844) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped line is the paved route

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.