Alamo Canal Trail
Canal towpath in California
Runs through Dublin · Alameda County
Conditions now
Loading the weather near Dublin…
Forecast by the National Weather Service for Dublin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Johnson Drive mile 0 directions to trailhead 1
- Parking at Civic Plaza mile 0.2 directions to trailhead 2
- Parking at Civic Plaza mile 0.2 directions to trailhead 3
- Parking at Dublin Boulevard mile 0.3 directions to trailhead 4
- Parking at Dublin Boulevard mile 0.4 directions to trailhead 5
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Alamo Canal Trail, which the East Bay Regional Park District lists as the Alamo Canal Regional Trail, is a paved path in Dublin, Alameda County, California, that links Dublin and Pleasanton beneath Interstate 580. The park district describes it as less than 1 mile long, running from the Iron Horse Trail just south of Amador Valley Road to I-580 near the Dublin Civic Center and Library. It takes its name from the Alamo Canal.
Until 2012 the Dublin path ended at the freeway behind the Dublin Library, and on the Pleasanton side a north-south stretch of the Centennial Trail, partly along the Arroyo de la Laguna, also stopped at I-580. Ground was broken in April 2012 on a 794-foot connection formed by cutting into the bank of the waterway that passes under the freeway. The $2.4 million project, the park district's first Green Transportation Initiative project, was built with the cities of Dublin and Pleasanton, the Alameda County Transportation Commission, Zone 7 Water Agency and Caltrans, and paid for with federal TIGER funds, Alameda County Measure B, the park district's Measure WW and the two cities. It opened on October 27, 2012; Bike East Bay called it the first non-motorized trail crossing under I-580 in the Tri-Valley.
This record maps about 1 mile, from Johnson Drive north under the freeway, past Civic Plaza and across Dublin Boulevard toward the Iron Horse Trail. The opening ceremony was held at a trail entrance at the northwest corner of the Dublin City Hall parking lot, 100 Civic Plaza. At its north end the trail joins the Iron Horse Regional Trail, which connects Pleasanton, Dublin, San Ramon, Danville, Walnut Creek, Pleasant Hill and Concord; at its south end it meets Pleasanton's Centennial Trail. The Alameda County Transportation Commission said the link created nearly 22 miles of continuous paved regional trails from Pleasanton through Dublin.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Livermore, 9.2 km from the trail's middle, 18 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 57 61 66 71 77 84 89 89 86 77 65 57 Low °F 39 41 43 46 50 54 57 57 55 50 43 39 Precipitation, in 2.8 2.7 2.2 1.1 0.5 0.1 0 0 0.1 0.8 1.5 2.7 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1906 Pleasanton sheet (1:62,500); the 1953 Dublin sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Iron Horse Regional Trail within 0.2 mi · 32.0 mi, paved
- Alamo Creek Trail within 0.2 mi · 2.4 mi, paved
- Arroyo Mocho Trail 1.7 mi away · 5.8 mi, paved
- Centennial Trail 2.0 mi away · 1.8 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Paved Regional Trails — East Bay Regional Park District · organization · checked Oct 16, 2026 Supports: name Alamo Canal Regional Trail, paved, less than 1 mile, from the Iron Horse Trail just south of Amador Valley Road to I-580 near the Civic Center and Library; Iron Horse Trail cities
- Alamo Canal Trail Undercrossing Opens in Dublin! — Alameda CTC (October 29, 2012) · organization · checked Oct 16, 2026 Supports: I-580 undercrossing linking Dublin and Pleasanton to the Iron Horse and Centennial trails, official opening October 27, 2012, entrance at the northwest corner of the Dublin City Hall lot at 100 Civic Plaza, nearly 22 miles of continuous paved regional trails, Measure B grant
- Alamo Canal Trail Opening Celebration and Ride — Hacienda (October 19, 2012) · organization · checked Oct 16, 2026 Supports: East Bay Regional Park District as lead agency, partners Alameda CTC, Dublin, Pleasanton, Zone 7 Water Agency and Caltrans
- New trail link clears the way for Tri-Valley bike and foot travel — Bike East Bay (October 25, 2012) · organization · checked Oct 16, 2026 Supports: first non-motorized trail crossing under I-580 in the Tri-Valley, $2.4 million
- Project begins to connect two trails under freeway — DanvilleSanRamon.com (April 10, 2012) · web · checked Oct 16, 2026 Supports: trail ended at I-580 behind the Dublin Library, Centennial Trail partly along the Arroyo de la Laguna ending at the freeway, April 2012 groundbreaking, 794 feet, cut into the bank of the waterway under the freeway, $2.4 million, TIGER, Measure B and Measure WW funding, partner agencies including Zone 7 and Caltrans, first Green Transportation Initiative project
- OpenStreetMap ways named Alamo Canal Trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: mapped length about 1 mile, access points at Johnson Drive, Civic Plaza and Dublin Boulevard
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.