Albany Waterfront Trail
Greenway in California
Runs through Albany and Berkeley · Alameda County
Conditions now
Loading the weather near Albany…
Forecast by the National Weather Service for Albany · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Buchanan Street mile 0.4 · restrooms directions to trailhead 1
- Parking at Buchanan Street mile 0.4 · restrooms directions to trailhead 2
- Parking mile 0.5 directions to trailhead 3
- Parking mile 0.8 directions to trailhead 4
- Parking at Gilman Street mile 0.9 directions to trailhead 5
Plan your visit
- By trainAmtrak: Berkeley, CA (BKY) 0.9 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Albany Waterfront Trail is a paved shoreline path in Albany, California, on the east side of San Francisco Bay, and carries part of the San Francisco Bay Trail through McLaughlin Eastshore State Park. The name comes from OpenStreetMap; the East Bay Regional Park District, which built the shoreline trail, describes it as part of the Bay Trail. The waterfront sits on bay fill: the Albany Bulb peninsula was built up from construction debris starting in 1963 until lawsuits stopped dumping in 1983, and the Albany Plateau and lower Albany Neck became part of the state park in 2002.
The park district built the trail in its Albany Beach Habitat Restoration and Public Access Project, between Buchanan Street and Gilman Street. Phase One, finished in 2015, rebuilt about 1,800 feet of the southern Albany Neck shoreline. Phase Two added about 800 feet of Bay Trail at Albany Beach along with a restroom, parking and a launch for non-motorized boats, and Phase Three added 4,200 feet of Bay Trail on the shoreline between Albany Beach and Gilman Street. The park district held a virtual celebration of the project's completion on July 18, 2020. Alameda County Transportation Commission Measure B funds paid $1 million of the cost.
The record on this page covers about 1.3 miles. From the foot of the Buchanan Street extension it runs east along Buchanan Street, west a short way onto the Albany Neck on a dirt section, and south past Albany Beach to Gilman Street. OpenStreetMap maps the rest as asphalt or paved, with a bridge on the shoreline section; the record shows parking and restrooms off Buchanan Street.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Oakland Museum, 10.6 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 60 62 65 67 69 72 72 73 75 73 66 60 Low °F 45 47 49 50 53 55 57 58 57 55 49 45 Precipitation, in 4.3 4.3 3.2 1.4 0.8 0.2 0 0.1 0.1 1.1 2.4 4.7 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1895 San Francisco sheet (1:62,500); the 1959 Richmond sheet (1:24,000) shows the area at mid-century. Browse all 19 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- San Francisco Bay Trail within 0.2 mi · 174 mi, paved
- Bay Trail within 0.2 mi · 23.1 mi, paved
- Cesar Chavez Park Perimeter Trail 0.5 mi away · 1.4 mi, paved
- Ohlone Greenway 0.9 mi away · 5.3 mi, paved
- Richmond Greenway 2.8 mi away · 3.0 mi, paved
- Kaiser Shipyard 3 Trail 2.8 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Albany Beach Habitat Restoration and Public Access Project — East Bay Regional Park District · organization · checked Oct 17, 2026 Supports: McLaughlin Eastshore State Park; project between Buchanan and Gilman streets; Phase One completed 2015, about 1,800 feet of Albany Neck shoreline; Phase Two about 800 feet of Bay Trail at Albany Beach, restroom, parking, non-motorized watercraft launch; Phase Three 4,200 feet of Bay Trail from Albany Beach to Gilman Street; completion celebration July 18, 2020; $1 million Measure B funding
- Albany Bulb — Wikipedia · organization · checked Oct 17, 2026 Supports: Bulb built from construction debris from 1963; dumping halted by lawsuits in 1983; Plateau and lower Neck added to Eastshore State Park in 2002; access via Buchanan Street or the Bay Trail
- Albany Waterfront Trail — OpenStreetMap way 987275091 · web · checked Oct 17, 2026 Supports: name; asphalt cycleway designated for bicycles, open to pedestrians, on the shoreline south of Buchanan Street
- Albany Waterfront Trail (bridge) — OpenStreetMap way 987275092 · web · checked Oct 17, 2026 Supports: bridge on the shoreline section
- Albany Waterfront Trail — OpenStreetMap way 804758699 · web · checked Oct 17, 2026 Supports: short dirt (ground) section west toward the Albany Neck
- Albany Waterfront Trail — OpenStreetMap way 28271852 · web · checked Oct 17, 2026 Supports: asphalt section east along the Buchanan Street extension
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.