Albion River Trail
Greenway in Michigan · OpenStreetMap relation
Runs through Albion · Calhoun County
Conditions now
Loading the weather near Albion…
Forecast by the National Weather Service for Albion · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Cass Street mile 0 directions to trailhead 1
- Parking at West Cass Street mile 0.9 directions to trailhead 2
- Parking at East Erie Street mile 1.1 directions to trailhead 3
- Parking at East Ash Street mile 1.1 directions to trailhead 4
- Parking at Veterans Way mile 1.6 directions to trailhead 5
Plan your visit
- By trainAmtrak: Albion, MI (ALI) 0.2 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Albion River Trail is a 10- to 14-foot-wide paved path running 1.6 miles along the Kalamazoo River through Albion, Michigan. The City of Albion says it is open to walking, running, biking, rollerblading and skateboarding, with no motorized vehicles except motorized wheelchairs. A ribbon-cutting was held October 5, 2007, at Victory Park.
The trail begins on the west side of town, passes the Ludington Center downtown and follows the river to Victory Park. A 1.2-mile College-Community Trail, a 10-foot paved extension built by the city and Albion College with more than $400,000 in grants, starts at the Victory Park bandshell and runs south through the college's Nancy G. Held Equestrian Center to M-99 south of downtown.
According to the college, Albion is the convergence point of three regional routes, the Iron Belle Trail, the Michigan Great Lake-to-Lake Trail and the North Country National Scenic Trail.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Jackson Reynolds Field, 23.9 km from the trail's middle, 17 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 45 58 70 79 82 80 74 61 48 36 Low °F 18 19 27 37 48 57 61 59 52 41 32 24 Precipitation, in 1.7 1.5 1.9 2.9 3.4 3.6 3.4 3.8 3 2.9 2.3 1.8 - On the National Register
- Superior Street Commercial Historic District, Albion · historic district, listed 1997 · nomination file for Superior Street Commercial Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1948 Homer sheet (1:62,500); the 1949 Homer sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesCity of Albion: Albion River Trail
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2283270, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Albion River Trail - City of Albion, Michigan · government source · checked Oct 18, 2026 Supports: 1.6 miles, width, Kalamazoo River, permitted uses, October 5, 2007 ribbon-cutting
- Albion River Trail Extension to Be Unveiled Sept. 16 - Albion College · organization · checked Oct 18, 2026 Supports: route past Ludington Center to Victory Park, 1.2-mile extension, grants, equestrian center, M-99, three regional trails
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.