Allenstown Rail Trail
Rail-trail in New Hampshire
Runs through Suncook and Allenstown · Merrimack County
Conditions now
Loading the weather near Suncook…
Forecast by the National Weather Service for Suncook · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Allenstown Rail Trail is a gravel path in Allenstown, New Hampshire, on a former rail bed of the Suncook Valley Railroad, running from Ferry Street near the village of Suncook to a connection with Hooksett's rail trail. The record maps about 0.7 mile; the Concord Monitor described it as about a mile long. The town's Highway Department built it over about a year and a half, and the town celebrated its completion in October 2024.
The Suncook Valley Railroad ran its first round trip between Suncook and Pittsfield on December 6, 1869, and was later extended to Center Barnstead. It was leased to the Concord Railroad and its successors, including the Boston and Maine from 1895, before operating independently from 1924. Its stub from Suncook to Hooksett was abandoned during the Second World War, and the last trip to Concord ran on December 20, 1952.
Building the trail involved clearing the overgrown bed, leveling it, laying stone and geotextile fabric topped with stone dust, and rebuilding three wooden bridges over drainage ditches with timber from former telephone poles given by an anonymous donor; Allenstown Aggregate donated the gravel and stone dust. The trailhead, with a parking lot, is at the corner of Ferry Street and Canal Street, within walking distance of downtown Suncook. The trail is used for walking, running and cycling, and the foundation of an old steam-engine water tower lies along it. The Central New Hampshire Regional Planning Commission includes the trail in its Suncook Valley Trails network, and town officials hope Pembroke will build its section so the route can continue toward Concord.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Concord - Montreal and Abandoned. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Concord Municipal Airport, 8.8 km from the trail's middle, 42 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 35 44 58 69 78 83 82 74 61 48 37 Low °F 13 15 23 33 44 54 59 57 49 38 29 20 Precipitation, in 2.8 2.8 3.3 3.4 3.5 3.8 3.6 3.6 3.6 4.4 3.4 3.7 Snow, in 17.1 16.9 13.6 2.5 0 0 0 0 0 0.8 2.5 14.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1921 Suncook sheet (1:62,500); the 1968 Manchester North sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Heads Pond Trail 0.7 mi away · 1.2 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Suncook Valley Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: first Suncook–Pittsfield round trip December 6, 1869, extension to Center Barnstead, leases to the Concord Railroad and the Boston and Maine (1895), independent operation from 1924, Suncook–Hooksett stub abandoned during World War II, last trip to Concord December 20, 1952
- A place to stroll: Allenstown celebrates completion of rail trail to Hooksett — Concord Monitor (October 22, 2024) · press · checked Oct 13, 2026 Supports: about one mile, Suncook Valley Railroad bed, connection to Hooksett's rail trail, Highway Department project of about a year and a half, clearing, leveling, stone, geotextile and stone dust, three rebuilt bridges with donated telephone-pole timber, Allenstown Aggregate donation, Ferry and Canal Street trailhead and parking, uses including biking, water-tower foundation, Suncook Valley Trails network, Pembroke hopes
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.