States › North Carolina

American Tobacco Trail

Rail-trail in North Carolina

Runs through Durham, Cary and Apex · Durham, Chatham and Wake counties

Conditions now

Loading the weather near Cary…

Forecast by the National Weather Service for Cary · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The American Tobacco Trail (ATT) is a 22.6-mile (36.4 km) long Rails-to-Trails project located in the Research Triangle region of North Carolina, running along an abandoned railroad bed originally built for the American Tobacco Company in the 1970s. The route crosses through portions of Durham County, Chatham County, and Wake County. The ATT is part of the East Coast Greenway and is open to pedestrians, cyclists, equestrians and other non-motorized users.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
22.1 mi 35.5 km1
On former railbed
19.7 mi 89%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Manor Way mile 0.2 directions to trailhead 1
  2. Parking at West Enterprise Street mile 0.5 directions to trailhead 2
  3. Parking at Overhill Terrace mile 0.5 directions to trailhead 3
  4. Parking at Fayetteville Road mile 2 directions to trailhead 4
  5. Parking at Larchwood Drive mile 3.3 directions to trailhead 5
  6. Parking at Fayetteville Road mile 4.3 · restrooms · water directions to trailhead 6
  7. Parking at Fayetteville Road mile 4.8 directions to trailhead 7
  8. Parking at Cook Road mile 5 directions to trailhead 8
  9. Parking at Fayetteville Road mile 6.4 directions to trailhead 9
  10. Parking mile 7.3 directions to trailhead 10
  11. Parking mile 7.3 directions to trailhead 11
  12. Parking mile 7.4 directions to trailhead 12
  13. Parking at Renaissance Parkway mile 7.7 directions to trailhead 13
  14. Parking at Fayetteville Road mile 9.2 directions to trailhead 14
  15. Parking at Fayetteville Road mile 9.2 directions to trailhead 15
  16. Parking at Scott King Road mile 10.4 directions to trailhead 16
  17. Parking at Pittard Sears Road mile 13.2 · water directions to trailhead 17
  18. American Tobacco Trail Parking mile 14.5 · restrooms · water directions to American Tobacco Trail Parking
  19. American Tobacco Trail White Oak Access mile 16.7 · restrooms · water directions to American Tobacco Trail White Oak Access
  20. Parking at White Oak Church Road mile 16.7 · restrooms · water directions to trailhead 20
  21. Parking mile 22.1 directions to trailhead 21
  22. American Tobacco Trail New Hill Access mile 22.2 · restrooms directions to American Tobacco Trail New Hill Access

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

2008-07-23 Cyclist on the American Tobacco Trail at the terminus in Durham.jpg (opens in a new tab)
2008-07-23 Cyclist on the American Tobacco Trail at the terminus in Durham.jpg · Photo: Ildar Sagdejev (Specious) · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The American Tobacco Trail is a rail-trail of about 22 miles in North Carolina's Research Triangle, running from rural New Hill in western Wake County through northeast Chatham County to downtown Durham near the Durham Bulls Athletic Park. Wake County manages 6.5 miles, Chatham County has 4.5 miles and Durham County an 11-mile section; the Chatham section was built and is managed by the Town of Cary. The trail is part of the East Coast Greenway and is open to walkers, runners, cyclists and, outside the city of Durham, horseback riders.

The railroad was built in 1905 to serve the American Tobacco Company's plants and warehouses in Durham. Its line south toward Bonsal, the New Hope Valley Railway, later became part of the Norfolk Southern system. When the U.S. Army Corps of Engineers built Jordan Lake in the 1970s, much of the track was relocated to higher ground, and about ten years later the rails were removed. The Triangle Rails-to-Trails Conservancy, founded in 1989, secured funding for the trail. The trail opened in phases starting in Durham in 2000, the Chatham section was completed by 2010, and a pedestrian bridge over Interstate 40, erected in April 2013, opened in February 2014 to close the last Durham gap.

In Durham the trail is a 10-foot asphalt greenway with gravel shoulders. In Chatham County it has a paved lane beside a stone-screenings lane for horses, and the Wake County section is crushed granite screenings, with a tunnel under U.S. 64. Wake County's section, with parking at New Hill-Olive Chapel, Wimberly and White Oak Church, is open from 8 a.m. to 30 minutes before sunset. In fall 2026 the county scheduled a closure between the Wimberly parking area and the White Oak Creek Greenway entrance to repair a landslide caused by Hurricane Helene in 2024; by mid-October its notices conflicted on whether the closure was in effect or postponed.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 69% of this route as a trail on former railroad right-of-way.

Shade

75% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Raleigh Durham International Airport, 13.5 km from the trail's middle, 49 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525663738087918982736355
Low °F323440495866706963504034
Precipitation, in3.42.84.13.53.43.954.75.23.43.33.4
Snow, in2.61.40.300000000.10.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Durham South sheet (1:62,500); the 1951 Durham South sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 said the unpaved southern miles were firm enough for road bikes on 25 to 28 mm tires, though they reported loose sand in dry spells and ruts after rain. r/bicycling, Jul 2024 · r/raleigh, Jul 2024
  • Riders in 2025 described water and restrooms every couple of miles around New Hope, White Oak and Herndon; one said the Wimberly fountain was broken, and another wished for one between Herndon and Solite. r/bullcity, May 2025
  • Riders in 2024 and 2026 suggested starting at Herndon Park, Solite Park or south of Southpoint for few road crossings, and said the Durham stretch toward the ballpark involves frequent stops. r/bullcity, Sep 2024 · r/bullcity, Jan 2026 · r/NorthCarolina, Apr 2026
  • Riders in January 2025 said the trail is not salted and that shady spots and footbridges stay icy; in February 2026 one rider found it muddy south of New Hope Church Road. r/triangle, Jan 2025 · r/bullcity, Feb 2026
38 Reddit threads about this trail, Jan 2024 to Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “American Tobacco Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q4745255, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. American Tobacco Trail Visitor Information — Wake County Government · government source · checked Oct 16, 2026
    Supports: 22 miles from New Hill through northeast Chatham County to downtown Durham near the Durham Bulls Athletic Park; Wake 6.5 miles, Chatham 4.5, Durham 11; open to walkers, runners, dog walkers, bicyclists and horseback riders; parking at New Hill-Olive Chapel, Wimberly and White Oak Church; hours 8 a.m. to 30 minutes before sunset; Helene landslide repair closure from the Wimberly parking area to the White Oak Creek Greenway entrance, and notice that the planned closure was postponed
  5. American Tobacco Trail — Wake County Government · government source · checked Oct 16, 2026
    Supports: 6.5-mile Wake County section; closure for Hurricane Helene landslide repairs through the end of October
  6. American Tobacco Trail — Wikipedia · organization · checked Oct 16, 2026
    Supports: Chatham section built and managed by the Town of Cary; East Coast Greenway; no equestrians in the city of Durham; 1905 rail lines for the American Tobacco Company; New Hope Valley Railway, Durham & South Carolina, Norfolk Southern; Jordan Lake relocation in the 1970s and removal about ten years later; Triangle Rails-to-Trails Conservancy founded 1989; phased opening from 2000 in Durham; Chatham completed by 2010; I-40 bridge erected April 2013, opened February 2014; Durham 10-foot asphalt with gravel shoulders; Chatham dual asphalt and screenings lanes; Wake granite screenings; tunnel under US 64

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.