Apple Creek Trail
Greenway in Wisconsin · OpenStreetMap relation
Runs through Appleton and Vandenbroek · Outagamie County
Conditions now
Loading the weather near Appleton…
Forecast by the National Weather Service for Appleton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at French Road mile 1.4 directions to trailhead 1
- Parking mile 1.7 directions to trailhead 2
- Parking at Lightning Drive mile 2.3 directions to trailhead 3
- Parking at East Evergreen Drive mile 2.5 directions to trailhead 4
- Parking at East Evergreen Drive mile 2.7 directions to trailhead 5
- Parking at North Meade Street mile 3.9 directions to trailhead 6
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Apple Creek Trail is a paved city trail of about 3.9 miles in Appleton, Wisconsin, following Apple Creek. Appleton Parks and Recreation lists it among the city's trails: it begins on Meade Street north of Highway 41 and continues past the USA Youth Sports Complex to County Road JJ. TrailLink gives the endpoints as Edgewood Drive and Meade Street. It is a greenway, not a rail-trail.
TrailLink describes an asphalt path beside a reedy stream, open to cycling, jogging and dog-walking. Holding ponds on Holland Road, near the east end, and at Ballard Road draw ducks, geese and herons. About halfway along, the trail skirts the soccer fields of the USA Youth Sports Complex; between the fields and Ballard Road the creek is screened by trees and shrubs, and Ballard is the only lighted street crossing on the route. Beyond Ballard the trail curves around the south edge of the second pond to Meade Street.
Benches and trash receptacles stand at intervals, gates mark the ends, and portable restrooms are on the trail. Parking is at the USA Youth Sports Complex, 3300 East Evergreen Drive, where lot A is closest. OpenStreetMap maps the trail as a mix of asphalt and concrete sections. The city's Trails Master Plan covers new trails and improvements to existing ones across Appleton.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Appleton, 6.7 km from the trail's middle, 15 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 29 41 54 67 77 82 79 72 58 43 31 Low °F 10 12 22 34 46 57 61 60 51 39 28 17 Precipitation, in 1.4 1.1 1.9 3.2 3.6 4.7 3.8 3.6 3.2 2.8 2.1 1.8 Snow, in 12.6 11.2 7.2 4 0.1 0 0 0 0 0.3 2.4 11.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1955 Appleton sheet (1:62,500); the 1955 Green Bay sheet (1:250,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Fox Cities Paper Trail within 0.2 mi · 10.7 mi, paved
- Meade Street Trail within 0.2 mi · 1.5 mi, paved
- Evergreen Drive Trail 1.0 mi away · 1.4 mi, paved
- Railroad Street Trail 2.2 mi away · 1.0 mi, paved
- Newberry Trail 2.5 mi away · 2.3 mi, paved
- CTH A Trail 2.5 mi away · 3.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 8448305, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails — Appleton Parks and Recreation · government source · checked Oct 15, 2026 Supports: paved city trail, begins on Meade Street north of Highway 41, continues past the USA Youth Sports Complex to County Road JJ, Trails Master Plan
- Apple Creek Trail — TrailLink · web · checked Oct 15, 2026 Supports: 3.9 miles, asphalt, Edgewood Drive and Meade Street endpoints, uses, holding ponds on Holland and Ballard roads, waterfowl, sports complex at midpoint, lighted Ballard Road crossing, benches, gates, portable restrooms, parking at 3300 E Evergreen Dr lot A
- Apple Creek Trail, relation 8448305 — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped asphalt and concrete sections
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.