States › Michigan

Applewood Trail

Greenway in Michigan

Runs through Flint · Genesee County

Conditions now

Loading the weather near Flint…

Forecast by the National Weather Service for Flint · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Benson Avenue mile 0.1 directions to trailhead 1
  2. Parking at Robert T Longway Boulevard mile 0.7 directions to trailhead 2
  3. Parking at Albert R. Horrigan Drive mile 1 directions to trailhead 3
  4. Parking at Albert R. Horrigan Drive mile 1.2 · restrooms directions to trailhead 4
  5. Parking at Albert R. Horrigan Drive mile 1.3 directions to trailhead 5
  6. Parking at Albert R. Horrigan Drive mile 1.4 directions to trailhead 6

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Applewood Trail (opens in a new tab)
Photo: COFlintGIS · CC BY-SA 4.0 · Mapillary

About this trail

The Applewood Trail is a path of about 1.8 miles in Flint, Genesee County, Michigan, between East Boulevard Drive at the Flint River Trail and East Court Street. TrailLink says it connects Mott Community College and several city parks with the Flint River Trail, the backbone of the Flint area's trail network.

It runs along the roadway through the Mott campus, giving off-road access to the college and civic sites such as the Flint Public Library and the Flint Institute of Arts, then follows Gilkey Creek toward the river through open space in Kearsley and Dayton Parks. TrailLink lists the surface as asphalt and concrete.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Flint 7w, 8 km from the trail's middle, 16 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303343566878827973604735
Low °F161624354656605951403022
Precipitation, in2.11.71.93.43.73.13.43.32.932.42.1
Snow, in13.110.44.31.2000000.11.79.6
Old maps

USGS topographic maps of the trail's middle go back to the 1920 Flint sheet (1:62,500); the 1969 Flint North sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Applewood Trail - TrailLink · web · checked Oct 18, 2026
    Supports: 1.8 miles, endpoints, Mott Community College, Flint River Trail, Gilkey Creek, Kearsley and Dayton Parks, surfaces

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.