Aroostook Valley Trail
Rail-trail in Maine · OpenStreetMap relation
Runs through New Sweden, Town of Woodland, Caribou, Washburn, Mapleton and Presque Isle · Aroostook County
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Station Road mile 10.8 directions to trailhead 1
- Parking mile 21.6 directions to trailhead 2
- Parking mile 21.6 directions to trailhead 3
- Parking mile 21.8 directions to trailhead 4
- Parking at Maysville Street mile 22.1 directions to trailhead 5
- Parking at Sincock Street mile 36.3 directions to trailhead 6
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Aroostook Valley Trail is a 28-mile multi-use rail trail in Aroostook County, Maine, connecting Presque Isle, Caribou, Washburn, Woodland and New Sweden. It is managed by the Off-road Vehicle Division of the Maine Bureau of Parks and Lands, and its corridor was acquired in part with Land for Maine's Future funds. The trail follows the Aroostook Valley Railroad, founded in 1902. Construction began in 1909, and the line opened on July 1, 1910, with 10.8 miles of track between Presque Isle and Washburn; it reached New Sweden in 1911 and Caribou in 1912. Canadian Pacific held a controlling interest from 1932 to 1980. Electric operation ended in July 1945 and passenger service in August 1945. The line north of Washburn was abandoned in 1983, and the railroad closed in 1996.
The trail covers the railroad's former main line between Presque Isle and Washburn and its branches toward Caribou and New Sweden. In Presque Isle it starts at a parking lot on Route 1/Main Street beside the Aroostook River, and Washburn has parking at the Washburn Clubhouse off Route 164. The route passes open fields and deep woods and follows streams and the Aroostook River. Volunteers, including an AmeriCorps trail coordinator and the Youth Community Action Project, which contributed $400,000 in labor hours, helped renovate the corridor.
The surface is gravel, groomed for snow in winter. The trail is open year-round to walking, mountain biking, horseback riding, skiing, snowshoeing and dog sledding, and to registered ATVs and snowmobiles, which must yield to non-motorized users. It closes during mud season, there is no fee, and most of it is remote enough that the state advises preparing for a backcountry trip. A state notice set the 2026 ATV opening for May 22.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 37% of this route as a trail on former railroad right-of-way.
- Shade
58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Presque Isle, 12.5 km from the trail's middle, 43 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 22 26 36 50 65 74 78 77 69 54 40 28 Low °F 3 5 16 29 41 50 56 54 47 36 26 12 Precipitation, in 2.5 1.9 2.4 2.8 3.3 3.8 3.7 3.8 3.5 4.2 3.1 3.2 Snow, in 21.1 21.7 19 6.3 0.2 0 0 0 0.2 1.2 6.1 21.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1929 Caribou sheet (1:48,000); the 1953 Caribou sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesMaine ATV News & Trail Notices (Bureau of Parks and Lands)
- RedditSearch Reddit: r/Maine
Nearby trails
- Aroostook Valley Trail Eastern Branch within 0.2 mi · 6.4 mi, dirt
- Bangor & Aroostook Trail Western Branch within 0.2 mi · 28.6 mi, surface unknown
- Bangor & Aroostook Trail 0.6 mi away · 69.9 mi, gravel
- Presque Isle Bike Path 0.7 mi away · 1.8 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10286933, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Aroostook Valley Trail — State Parks and Public Lands, Maine Department of Agriculture, Conservation and Forestry · government source · checked Oct 13, 2026 Supports: 28 miles connecting Presque Isle, Caribou, Washburn, Woodland and New Sweden; parking on Route 1/Main Street in Presque Isle by the Aroostook River and at the Washburn Clubhouse off Route 164; closed in mud season; gravel surface; year-round multi-use; fields, woods, streams and the Aroostook River; remote, backcountry; motorized users yield; Land for Maine's Future funds; construction began 1909 from Washburn to Presque Isle; branch lines to New Sweden, Carson and Caribou; closed 1996
- Maine ATV Trails — Bureau of Parks and Lands, Maine DACF · government source · checked Oct 13, 2026 Supports: state-owned or leased abandoned rail beds open to multiple use; permitted non-motorized uses including bicycling; motorized vehicles must be registered ATVs or snowmobiles
- Maine ATV News & Trail Notices — Bureau of Parks and Lands, Maine DACF · government source · checked Oct 13, 2026 Supports: May 12, 2026 notice: Aroostook Valley Trail opening to ATVs May 22
- Aroostook Valley Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: founded 1902, opened July 1, 1910 with 10.8 miles Presque Isle–Washburn, New Sweden 1911, Caribou 1912, Canadian Pacific control 1932–1980, electrification ended July 1945, passenger service ended August 7, 1945, line north of Washburn abandoned 1983, operations ended 1996
- Aroostook Valley Trail — Natural Resources Council of Maine · organization · checked Oct 13, 2026 Supports: Land for Maine's Future grant for the Aroostook Valley line, AmeriCorps trail coordinator, Youth Community Action Project $400,000 in volunteer labor hours
- Aroostook Valley Trail — Maine Trail Finder · web · checked Oct 13, 2026 Supports: gravel/crushed stone surface with groomed snow in winter, mountain biking among uses, no fee
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.