States › Massachusetts

Ashuwillticook Rail Trail

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Adams, Cheshire, Lanesborough and Pittsfield · Berkshire County

Conditions now

Loading the weather near Cheshire…

Forecast by the National Weather Service for Cheshire · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Ashuwillticook Rail Trail is a 14.05-mile (22.61 km) rail trail that runs north-south through the towns of Cheshire, Lanesborough and Adams, and into the city of Pittsfield, Massachusetts. It is a multi-use trail for biking, walking, roller-blading, and jogging. The trail is managed by the Massachusetts Department of Conservation and Recreation (DCR). It was built on the former Pittsfield and North Adams Railroad.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
14.0 mi 22.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Crane Avenue mile 0.4 · restrooms directions to trailhead 1
  2. Parking at US 7/Route 8 Connector Road mile 2 · restrooms directions to trailhead 2
  3. Parking at US 7/Route 8 Connector Road mile 2.1 · restrooms directions to trailhead 3
  4. Parking at Farnams Road mile 5.7 · restrooms directions to trailhead 4
  5. Trailhead at Hoosac Drive mile 7.2 directions to trailhead 5
  6. Parking at Railroad Street mile 7.9 directions to trailhead 6
  7. Parking at Railroad Street mile 8 directions to trailhead 7
Cheshire Reservoir, Ashuwillticook Rail Trail, Cheshire MA.jpg (opens in a new tab)
Cheshire Reservoir, Ashuwillticook Rail Trail, Cheshire MA.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Ashuwillticook Rail Trail is a paved rail trail in Berkshire County, Massachusetts, running through Pittsfield, Lanesborough, Cheshire and Adams. The Department of Conservation and Recreation (DCR) manages it. Its name comes from the Native American name for the south branch of the Hoosic River, translated as "the pleasant river in between the hills." The corridor was developed from 1845 by the Pittsfield and North Adams Railroad, which the Western Railroad acquired during construction and which became the Boston and Albany's North Adams Branch. The New York Central took over the Boston and Albany in 1900, and the Boston and Maine bought the line in 1981 and operated it until 1990.

DCR describes a 10-foot-wide paved trail of 12.7 miles through Cheshire, Lanesborough and Adams, past Cheshire Reservoir and along the Hoosic River. The first two phases opened in 2001 and 2004, and a 1.2-mile northern extension followed in 2017. A 1.5-mile extension south to Crane Avenue in Pittsfield opened in spring 2022, and a further half mile to Merrill Road opened in 2024. The trail now runs about 14 miles from Lime Street in Adams to Merrill Road; the route mapped here measures 14.0 miles.

The trail is open dawn to dusk, with free parking at public lots along the route, seasonal restrooms, picnic areas and a visitor center. Dogs must be leashed, and motorized vehicles and horses are prohibited. A 2.4-mile northern extension to Hodges Cross Road in North Adams is planned to begin construction in 2028. In January 2025 the Berkshire Regional Planning Commission received a $17.3 million federal RAISE grant to bring a 9.3-mile path from the trail's end in Adams through North Adams to the Mohican Path in Williamstown to final, construction-ready design.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 76% of this route as a trail on former railroad right-of-way and 13% as an out-of-service rail line, naming the line Coltsville Industrial Track.

Shade

54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pittsfield Municipal Airport, 17.1 km from the trail's middle, 67 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303342556775797870584736
Low °F141523344453585649382921
Precipitation, in2.72.53.13.43.84.64.23.84.54.63.53.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Greylock sheet (1:62,500); the 1959 Cheshire sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Cheshire, c. 1906: Train on the Cheshire Reservoir causeway
Cheshire, c. 1906: Train on the Cheshire Reservoir causewayPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

2 Reddit threads about this trail, Jun 2025 to Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2988766, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Ashuwillticook Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q4806145, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Ashuwillticook Rail Trail — Mass.gov (Department of Conservation and Recreation) · government source · checked Oct 13, 2026
    Supports: 10-foot-wide paved trail on an old railroad, 12.7 miles through Cheshire, Lanesborough and Adams, Cheshire Reservoir and Hoosic River, dawn to dusk, free parking, seasonal restrooms, picnic areas, visitor center, dogs on leash, motorized vehicles and horses prohibited
  6. $17.3 Million RAISE grant will prepare a 9.3-mile shared-use path connecting northern Berkshire communities for construction — Congressman Richard Neal (January 10, 2025) · government source · checked Oct 13, 2026
    Supports: $17.3 million RAISE grant to the Berkshire Regional Planning Commission for planning, design and permitting to 100% design, 9.3-mile path through North Adams to the Williamstown Mohican Path, existing trail 14 miles long ending at Lime Street in Adams
  7. Ashuwillticook Rail Trail — Wikipedia · organization · checked Oct 13, 2026
    Supports: towns including Pittsfield, DCR management, name meaning, Pittsfield and North Adams Railroad 1845, Western Railroad, Boston and Albany North Adams Branch, New York Central 1900, Boston and Maine 1981–1990, phases 2001 and 2004, 1.2-mile extension 2017, Crane Avenue 2022, Merrill Road 2024, Hodges Cross Road extension planned for 2028

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.