States › Georgia

Atlanta Beltline Trail

Rail-trail in Georgia · OpenStreetMap relation

Runs through Atlanta · Fulton County

Conditions now

Loading the weather near Atlanta…

Forecast by the National Weather Service for Atlanta · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
19.3 mi 31.0 km1
On former railbed
12.0 mi 62%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Piedmont Avenue Northeast mile 1.2 directions to trailhead 1
  2. Parking at Cresthill Avenue Northeast mile 2.1 · water directions to trailhead 2
  3. Parking at Monroe Drive Northeast mile 2.2 directions to trailhead 3
  4. Midtown Promenade Parking mile 2.4 directions to Midtown Promenade Parking
  5. Parking at Drewry Street Northeast mile 2.5 directions to trailhead 5
  6. Parking at Pylant Street Northeast mile 2.5 directions to trailhead 6
  7. Parking at Greenwood Avenue Northeast mile 2.6 directions to trailhead 7
  8. Parking at Greenwood Avenue Northeast mile 2.6 directions to trailhead 8
  9. Parking at Greenwood Avenue Northeast mile 2.6 directions to trailhead 9
  10. Parking at Ponce de Leon Place Northeast mile 2.7 directions to trailhead 10
  11. Parking at Ponce de Leon Place Northeast mile 2.7 directions to trailhead 11
  12. Parking mile 2.8 · water directions to trailhead 12
  13. Parking at Ponce de Leon Place Northeast mile 2.8 directions to trailhead 13
  14. Parking at Ponce de Leon Place Northeast mile 2.8 directions to trailhead 14
  15. Parking at Ponce de Leon Place Northeast mile 2.8 directions to trailhead 15
  16. Parking at Ford Place Northeast mile 2.9 directions to trailhead 16
  17. Parking at Ford Place Northeast mile 2.9 directions to trailhead 17
  18. Parking at North Avenue Northeast mile 3 · water directions to trailhead 18
  19. Parking at North Angier Avenue Northeast mile 3 directions to trailhead 19
  20. Parking at Ralph McGill Boulevard Northeast mile 3.3 directions to trailhead 20
  21. Parking at Ralph McGill Boulevard Northeast mile 3.3 directions to trailhead 21
  22. Parking at North Highland Avenue Northeast mile 3.7 directions to trailhead 22
  23. Parking at Krog Street Northeast mile 4 directions to trailhead 23
  24. Parking at Krog Street Northeast mile 4.1 · restrooms · water directions to trailhead 24
  25. Parking at Krog Street Northeast mile 4.1 · restrooms · water directions to trailhead 25
  26. Parking at Krog Street Northeast mile 4.1 · restrooms · water directions to trailhead 26
  27. Parking at Irwin Street Northeast mile 4.1 · water directions to trailhead 27
  28. Parking at Krog Street Northeast mile 4.2 · restrooms · water directions to trailhead 28
  29. Parking at Waddell Street Northeast mile 4.5 directions to trailhead 29
  30. Parking at Memorial Drive Southeast mile 5.3 directions to trailhead 30
  31. Parking at Old Flat Shoals Road Southeast mile 5.4 directions to trailhead 31
  32. Parking at Chester Avenue Southeast mile 5.4 directions to trailhead 32
  33. Parking at Memorial Drive Southeast mile 5.4 directions to trailhead 33
  34. Parking at Woodward Avenue mile 5.5 directions to trailhead 34
  35. Parking at Chester Avenue Southeast mile 5.5 directions to trailhead 35
  36. Parking at Bartram Street Southeast mile 5.7 directions to trailhead 36
  37. Parking mile 7.1 directions to trailhead 37
  38. Parking at Boulevard Southeast mile 7.1 directions to trailhead 38
  39. Parking at Hill Street Southeast mile 7.6 · restrooms directions to trailhead 39
  40. Parking at Hill Street Southeast mile 7.6 · restrooms directions to trailhead 40
  41. Parking at Grant Street Southeast mile 7.6 · restrooms directions to trailhead 41
  42. Parking at Grant Street Southeast mile 7.6 · restrooms directions to trailhead 42
  43. Parking at Ellsworth Industrial Boulevard Northwest mile 15.8 directions to trailhead 43
  44. Parking at Trabert Avenue Northwest mile 16.8 directions to trailhead 44
  45. Parking at Trabert Avenue Northwest mile 16.8 directions to trailhead 45
  46. Parking at Trabert Avenue Northwest mile 16.8 directions to trailhead 46

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Beltline from Woodward Bridge in Piedmont Park (opens in a new tab)
Beltline from Woodward Bridge in Piedmont Park · Photo: Daniel Mayer · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Atlanta Beltline Trail is the multi-use trail of the Atlanta Beltline, a project to turn a 22-mile loop of former railroad corridors around the core of Atlanta, Georgia, into trails, parks and transit. Atlanta Beltline, Inc., created in 2006, oversees its planning and construction. The loop follows four belt railroads: the Atlanta and Richmond Air-Line Railway on the northeast and east sides, the Atlanta & West Point Belt Line (built in 1899, out of use from 2014) on the southeast and south, a Louisville & Nashville belt line on the southwest and west, and the Seaboard Air Line line of 1892 on the northwest and north, which CSX still operates, so the Northwest and Northside Trails will follow a new route. Georgia Tech student Ryan Gravel proposed reusing the corridors in a 1999 master's thesis, and the city adopted the Beltline Redevelopment Plan in December 2005.

The West End Trail opened in 2008, the Westview and Northside Trails in 2010 and the Eastside Trail in 2012. The Southeast Trail opened in April 2026, and on June 12, 2026, Southside Trail Segments 2 and 3, 1.9 miles from Pittsburgh Yards to Boulevard, linked the Eastside and Westside Trails. Nearly 17 continuous miles now run from Armour Yards in South Buckhead past Piedmont Park, the Old Fourth Ward, Grant Park and Lee + White to Blandtown. About 10.3 miles of connector trail are also complete, among them the 1.6-mile Westside Connector Trail to downtown. Atlanta Beltline, Inc. aims to finish the 22-mile loop and 11 miles of connectors by 2030.

Walkers and riders share the trail, and a concrete center line built into the trail divides the directions of travel. Four public restrooms stand along the trail. MARTA stations lie near access points, and the ATL Spoke autonomous shuttle, a pilot launched in June 2026, runs between West End station and the Lee + White district on the Southwest Trail.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 23% of this route as an abandoned line with the track removed and 23% as an out-of-service rail line.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Atlanta Fulton County Airport, 9.2 km from the trail's middle, 23 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F545866748187908984746456
Low °F343743505867706963514136
Precipitation, in4.24.34.53.63.63.8543.43.63.84.2
On the National Register

And 6 more within 100 m of the trail.

Old maps

USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1954 Bolton sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2026 said the Eastside between Krog Street and Ponce City Market was crowded on weekends and evenings, which slowed cycling; one suggested riding around 9 a.m. instead. r/Atlanta, May 2026 · r/Atlanta, Oct 2026
  • Riders in October 2026 said the Lee + White lot is a common meeting spot with two free hours, but that app-based enforcement ticketed some people after validation; one parks on White Street. r/Atlanta, Oct 2026
  • Riders in May 2026 said the Westside reaches Huff Road, and that Southland Circle, Carroll Drive and Marietta Road lead on to the Whetstone Creek trail toward the still-unfinished Silver Comet connector. r/Atlanta, May 2026
  • Riders in May 2026 said the Northeast section beyond Worcester Drive was unpaved, and that Piedmont Park lacked signs; a left before Evelyn Street, then a right beneath it, continued north. r/Atlanta, May 2026
15 Reddit threads about this trail, Apr 2024 to Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 8408433, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Timeline of Atlanta Beltline history, milestones, and progress — Atlanta Beltline · organization · checked Oct 16, 2026
    Supports: 22-mile loop of disused railroad corridors, Ryan Gravel's 1999 thesis, Redevelopment Plan approved December 2005, Atlanta Beltline, Inc. created 2006, West End Trail 2008, Westview and Northside Trails 2010, Eastside Trail 2012
  3. Atlanta Beltline Opens Final Piece of Trail Ahead of FIFA, Connecting East and West — Atlanta Beltline (June 12, 2026) · organization · checked Oct 16, 2026
    Supports: Southside Trail Segments 2 and 3 opened June 12, 2026, 1.9 miles from Pittsburgh Yards to Boulevard, linking the Eastside and Westside Trails; Southeast Trail opened April 2026; nearly 17 continuous miles from Armour Yards to Blandtown and the places passed; 10.3 miles of connector trails including the 1.6-mile Westside Connector Trail to downtown; abandoned rail corridor
  4. Atlanta Beltline Visitor Information | Explore Atlanta — Atlanta Beltline · organization · checked Oct 16, 2026
    Supports: shared use by walkers and wheeled users, concrete center line, four public restrooms, MARTA stations near access points, ATL Spoke pilot from June 2026 between West End station and Lee + White on the Southwest Trail, goal of the 22-mile loop plus 11 miles of connectors by 2030
  5. Atlanta Beltline — Wikipedia · organization · checked Oct 16, 2026
    Supports: the four belt railroads and the trails each one carries; Atlanta & West Point Belt Line built 1899 and defunct 2014; Seaboard Air Line line completed 1892 and still operated by CSX, so the Northwest and Northside Trails will follow a new route

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.