Babbitt Beach Bike Path
Greenway in Minnesota
Runs through Babbitt · St. Louis County
Conditions now
Loading the weather near Babbitt…
Forecast by the National Weather Service for Babbitt · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Babbitt Beach Bike Path is a paved trail of about 2.2 miles linking the city of Babbitt, on Minnesota's Vermilion Iron Range, with the city's beach on Birch Lake. The City of Babbitt's parks and recreation department describes it as a paved bike and hike trail that connects the city to the beach area. It is a greenway, not a rail-trail.
The trail runs east from town toward the beach park at 2003 Scott Road, which the city places about 2.5 miles east of Babbitt. The park covers 36.88 acres, with a beach house holding changing rooms, restrooms, a lifeguard room and a concession stand, along with picnic shelters, grills, playground equipment, boat docks, a water ski dock and fishing docks. In 2000 the city and the Babbitt Lions Club funded a 104-foot accessible fishing pier there.
In winter the city funds a groomed ski loop at the Babbitt Golf Course, and the Birch Lake Plantation ski trails lie about a mile east of town on Scott Road (County Road 623).
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
39% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Babbitt, 2.9 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 16 21 34 48 62 72 77 75 65 50 34 20 Low °F -7 -5 10 25 38 49 53 51 42 31 18 2 Precipitation, in 1.2 0.8 1 2.4 3.9 3.8 4.3 3.6 3.3 2.7 1.6 1.1 Snow, in 17.4 13.5 10.1 11.8 0.5 0 0 0 0 3.3 10.3 17 - Old maps
USGS topographic maps of the trail's middle go back to the 1951 Babbitt sheet (1:24,000); the 1962 Babbitt sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Parks & Rec Department — City of Babbitt · web · checked Oct 15, 2026 Supports: paved bike and hike trail connecting the city to the beach area; beach at 2003 Scott Rd., 36.88 acres, beach house, facilities, docks; 2000 fishing pier funded by city and Lions Club, 2.5 miles east of Babbitt; ski trails
- Babbitt — Mesabi Trail · web · checked Oct 15, 2026 Supports: Babbitt on the Vermilion Iron Range
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.