States › New York

Ballston Bicycle Path

Rail-trail in New York

Runs through Ballston · Saratoga County

Conditions now

Loading the weather near Country Knolls…

Forecast by the National Weather Service for Country Knolls · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.4 mi 5.4 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Main Street mile 0 directions to trailhead 1
  2. Parking at Outlet Road mile 3.4 directions to trailhead 2
Ballston Bicycle Path drawn on the 1954 USGS topographic map of Schenectady, New York
Then: the 1954 USGS Schenectady sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Ballston Veterans Bike Path, mapped here as the Ballston Bicycle Path, is a paved trail of about 3.5 miles in the town of Ballston, Saratoga County, New York, beside Ballston Lake; 3.4 miles are mapped here. Parks & Trails New York describes the corridor as a former Native American trade route that later carried the Schenectady-Saratoga trolley line.

The path runs from a trailhead on Route 146A at Firemen's Lane in Ballston Lake, where a monument honors the town's veterans, north to Outlet Road at Powers Lane. Mileage markers stand every quarter mile and signs describe the corridor's history. Canadian Pacific tracks run alongside for most of the way, separated by a planted berm. Parking at Outlet Road is limited, and a fishing pier on Ballston Lake is near that trailhead.

Notes of the Saratoga County Countywide Trails Initiative meeting in April 2026 reported that the Champlain Hudson Power Express project expected to begin post-construction cleanup of the path that spring, with a possible reopening in July 2026. The same notes say the town has applied for a $4.3 million TAP grant, with a $1.1 million town share, to build a 10-foot paved path north from Outlet Road to the village of Ballston Spa, joining the Zim Smith Trail at Zepko Lane; construction could begin in 2028 if the grant is awarded. A 2021 profile of the town reported plans to extend the path both north and south to link the Burnt Hills-Ballston Lake and Ballston Spa schools.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Saratoga Springs 4 SW, 12.5 km from the trail's middle, 16 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323545607280848275624937
Low °F141625364756615952403122
Precipitation, in3.42.63.43.83.94.854.13.84.13.53.9
Snow, in16.515.711.41.8000000.12.915.1
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Schenectady sheet (1:62,500); the 1954 Round Lake sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Countywide Trails Initiative Notes, April 14, 2026 — Saratoga PLAN · organization · checked Oct 14, 2026
    Supports: Champlain Hudson Power Express post-construction cleanup of the Ballston Veterans trail in spring 2026 with possible reopening in July; Town of Ballston TAP grant application of $4.3 million with $1.1 million town contribution for a 10-foot paved path from Outlet Road to the Village of Ballston Spa joining the Zim Smith Trail at Zepko Lane; construction could begin in 2028
  3. History & Scenery Meets Tranquility on Saratoga County Bike Path — Parks & Trails New York · organization · checked Oct 14, 2026
    Supports: Ballston Veterans Bike Path in the town of Ballston, Saratoga County; once a Native American trade route, later the route of the Schenectady-Saratoga trolley line
  4. Business View Civil & Municipal, Volume 2, Issue 8 (August 2021) · web · checked Oct 14, 2026
    Supports: about three and a half miles, ends at the north part of Ballston Lake, plans to extend north and south to connect the Burnt Hills-Ballston Lake High School and the Ballston Spa schools and the Zim Smith Trail
  5. Ballston Veterans Bike Path — TrailLink · web · checked Oct 14, 2026
    Supports: 3.5 miles, asphalt, endpoints at Outlet Road at Powers Lane and SR 146A at Firemen's Lane, veterans monument at the trailhead, quarter-mile markers and history signs, Canadian Pacific tracks and berm alongside, limited parking at Outlet Road, fishing pier on Ballston Lake

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.