Bay-Zil Rail Trail
Rail-trail in Michigan
Runs through Bay City, Frankenlust Township and Zilwaukee Township · Bay and Saginaw counties
Conditions now
Loading the weather near Bay City…
Forecast by the National Weather Service for Bay City · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Brooks Street mile 1.4 directions to trailhead 1
(opens in a new tab) About this trail
The Bay-Zil Rail Trail is a paved trail of about 7 miles running south from Bay City toward Zilwaukee in Bay and Saginaw counties, Michigan. It is the Hotchkiss Road section of the Bay County Riverwalk and Railtrail system, a network of nearly 20 miles that reaches from Bay City State Park and Tobico Marsh through Bay City to Zilwaukee. Fundraising for the system began in 1982, led by community volunteer Peg Rowley, and its first section was completed in 1986; the Bay Area Community Foundation's Bay County Riverwalk and Railtrail Committee continues to extend it. The trail is part of the Great Lakes Bay Regional Trail network, and the Michigan DNR's Iron Belle Trail map shows it as the Bay to Zilwaukee Rail Trail.
The southern end lies near Melbourne Road north of Zilwaukee. In 2016 the Hotchkiss section was connected to Zilwaukee's Pathway, linking the trails of Bay and Saginaw counties; that pathway begins at Zilwaukee Riverfront Park on the west shore of the Saginaw River. The main trailhead, with parking, is at Hotchkiss Road and Brooks Street. In 2019 a new 5,600-foot section was built north from the Hotchkiss trailhead to Salzburg Avenue, with a map kiosk near Salzburg Avenue and a trailhead and parking area at the end of Arbor Street. The Community Foundation, the Kantzler Foundation and the Great Lakes Bay Regional Trail Board paid for it.
The surface is asphalt, and trees line much of the route, which passes farms, fields, water and woods. The regional trail effort aims to join the Bay and Saginaw county trails with Midland County's trail system.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Essexville, 9.5 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 32 42 54 68 78 82 80 74 60 47 35 Low °F 16 17 24 35 48 58 62 60 52 41 31 23 Precipitation, in 1.7 1.7 1.9 3.6 3.4 3.5 2.9 3.8 3.2 3 2.4 2.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Bay City sheet (1:62,500); the 1967 Bay City sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Bay City Loop within 0.2 mi · 7.1 mi, paved
- Zilwaukee Pathway 1.3 mi away · 1.4 mi, paved
- SVSU Path 3.3 mi away · 1.9 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Iron Belle Trail Maps: Zilwaukee - Bay to Zilwaukee Railtrail - Bay City Bangor Railtrail - Bay City State Rec Area — Michigan DNR · government source · checked Oct 15, 2026 Supports: trail shown on the Iron Belle Trail map as the Bay to Zilwaukee Rail Trail
- Railtrail system stretches into new parts of Bay County — Confluence Great Lakes Bay (July 18, 2019) · web · checked Oct 15, 2026 Supports: Riverwalk and Railtrail system of nearly 20 miles from Bay City State Park and Tobico Marsh to Zilwaukee; fundraising from 1982, Peg Rowley, first section 1986; Bay Area Community Foundation committee; 2016 connection of the Hotchkiss portion to Zilwaukee's Pathway; 2019 5,600-foot Hotchkiss-to-Salzburg section, kiosk, Arbor Street trailhead, funders; tree-lined, farms and fields; goal of linking to Midland County
- Great Lakes Bay Regional Trail — Go Great Lakes Bay · web · checked Oct 15, 2026 Supports: BayZil Trail listed among Bay County's existing Great Lakes Bay Regional Trail routes, trailhead off Hotchkiss Rd; Zilwaukee Pathway starts at Zilwaukee Riverfront Park on the west shore of the Saginaw River
- Bay-Zil Rail Trail — TrailLink · web · checked Oct 15, 2026 Supports: 7 miles; endpoints near Melbourne Rd north of Zilwaukee and Hotchkiss Road at Brooks Street; asphalt; parking at Hotchkiss Road and Brooks Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.