States › Michigan

Bergland to Sidnaw Rail-Trail

Rail-trail in Michigan

Runs through Matchwood Township, McMillan Township (Ontonagon County), Ewen, Bruce Crossing, Stannard Township, Interior Township and Duncan Township · Ontonagon and Houghton counties

Partly closed according to the managing agency's data2. Check the sources below before you go.

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Michigan DNR Parks and Recreation Division.2

Length
44.6 mi 71.7 km1
Surface
Dirt12
Status
Partly closed2
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Harrison Street mile 9.2 directions to trailhead 1
  2. Parking at Binder Drive mile 25.9 directions to trailhead 2
  3. Parking at Korsman Parkway mile 25.9 directions to trailhead 3
  4. Parking mile 33.5 · restrooms directions to trailhead 4
  5. Parking mile 33.5 · restrooms directions to trailhead 5
Agate Falls, Ontonagon River, Mich. (opens in a new tab)
Agate Falls, Ontonagon River, Mich. · Photo: smallcurio · CC BY · Flickr

About this trail

The Bergland to Sidnaw Rail-Trail is a multi-use trail of about 45 miles in Ontonagon and Houghton counties in Michigan's western Upper Peninsula, owned and administered by the Michigan Department of Natural Resources Parks and Recreation Division. It is a motorized trail as much as a bicycle route: the DNR's trail data designate it as ORV SB Route, open to off-road vehicles up to 72 inches wide, and as part of snowmobile trails 8 and 3, with mountain biking permitted. It follows the former Duluth, South Shore and Atlantic Railway.

The trail runs between Bergland and Sidnaw, crossing trestles over streams and rivers. About midway it passes the DNR's Agate Falls Scenic Site off M-28, where a railroad trestle built in 1900 carries the trail above the falls on the Middle Branch of the Ontonagon River.

The DNR lists the surface as natural dirt, 12 feet wide or more. In April 2026 the DNR closed the Agate Falls Scenic Site and a 4.6-mile section of the route for a $1.6 million rehabilitation of the trestle, paid for by a Federal Highway Administration Recreational Trails Program grant, and set an 18.6-mile detour from Mile W along Calderwood Road and Bond Falls Road to the LL route. The scenic site reopened on September 4, 2026, but in August the DNR said construction delays would keep the trestle closed to pedestrians and off-road vehicles past the planned November 1 reopening, with a new date to be announced.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: June to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bergland Dam, 33.7 km from the trail's middle, 14 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F212536496474787668543826
Low °F3210253848535144332311
Precipitation, in3.42.52.73.53.73.743.63.84.43.73.8
Snow, in41.627.722.413.81.60000.2528.239.5
Old maps

USGS topographic maps of the trail's middle go back to the 1949 Rockland sheet (1:62,500); the 1951 Rockland sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “managing_org from Michigan DNR Statewide Railtrails”
  3. Statewide Railtrails layer, Bergland To Sidnaw Rail Trail segments — Michigan DNR Trails open data (ArcGIS) · government source · checked Oct 14, 2026
    Supports: segments totaling about 45.5 miles in Ontonagon and Houghton counties; owner and administrator DNR Parks and Recreation Division; multi-use motorized and non-motorized; ORV SB Route, 72-inch; snowmobile trails UP 8 and UP 3; mountain biking permissible; natural dirt surface, 12 feet and over; 4.66 miles temporarily closed for bridge repair (Agate bridge, note dated 04/14/2026, detour along Calderwood Rd. to Bond Falls Rd.)
  4. List of rail trails in Michigan — Wikipedia · organization · checked Oct 14, 2026
    Supports: Bergland to Sidnaw Rail Trail follows the former Duluth, South Shore and Atlantic Railway
  5. Agate Falls trestle bridge improvements taking longer than expected, DNR says — WNMU-FM (August 24, 2026) · organization · checked Oct 14, 2026
    Supports: scenic site due to reopen September 4; trestle built in 1900 and reused as an ORV and snowmobile trail bridge; delays push back the November 1 reopening; trestle closed to pedestrians and ORVs; new date to be announced
  6. Agate Falls Scenic Site closed until fall for repairs — WLUC TV6 (April 17, 2026) · web · checked Oct 14, 2026
    Supports: scenic site off M-28 closed for trestle bridge repairs; $1.6 million Federal Highway Administration Recreational Trails Program grant; 4.6-mile section of ORV SB Route rerouted; 18.6-mile detour from Mile W via Calderwood Road and Bond Falls Road to LL; completion slated for November 1
  7. Hiking around Ontonagon — Western U.P. visitor guide (coppercountry.com) · web · checked Oct 14, 2026
    Supports: trestles over streams and rivers; Agate Falls on the Middle Branch of the Ontonagon River about midway; endpoints Sidnaw and Bergland; known as Trail 8 on snowmobile maps

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.