States › Maryland

Bethesda Trolley Trail

Trolley trail in Maryland · OpenStreetMap relation

Runs through Rockville, North Bethesda and Bethesda · Montgomery County

Conditions now

Loading the weather near North Bethesda…

Forecast by the National Weather Service for North Bethesda · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Bethesda Trolley Trail, at one time known as the North Bethesda Trail, is a 5.9-mile (9.5 km) rail trail in southern Montgomery County, Maryland. It runs from Bouic Avenue next to the Twinbrook Metro Station in the city of Rockville to Battery Lane Park in Bethesda.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
4.3 mi 6.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Twinbrook Kiss & Ride Lot mile 0.1 directions to Twinbrook Kiss & Ride Lot
  2. Parking at Halpine Walk Court mile 0.1 directions to trailhead 2
  3. Twinbrook Metro Station Parking mile 0.2 directions to Twinbrook Metro Station Parking
  4. Parking at Twinbrook Parkway mile 0.5 directions to trailhead 4
  5. Parking at Rockville Pike mile 0.7 directions to trailhead 5
  6. Parking at Rockville Pike mile 0.7 directions to trailhead 6
  7. Parking at Rockville Pike mile 0.7 directions to trailhead 7
  8. Parking at Bou Avenue mile 0.7 directions to trailhead 8
  9. Parking at Hubbard Drive mile 0.7 directions to trailhead 9
  10. Parking at Bou Avenue mile 0.7 directions to trailhead 10
  11. Parking at Rockville Pike mile 0.7 directions to trailhead 11
  12. Parking at Chapman Avenue mile 0.8 directions to trailhead 12
  13. Montrose Road Park and Ride mile 0.9 directions to Montrose Road Park and Ride
  14. Montrose Road Park and Ride mile 0.9 · restrooms directions to Montrose Road Park and Ride
  15. Parking at Chapman Avenue mile 0.9 directions to trailhead 15
  16. Parking at Rockville Pike mile 0.9 directions to trailhead 16
  17. Parking at Chapman Avenue mile 0.9 directions to trailhead 17
  18. Parking at Chapman Avenue mile 1 directions to trailhead 18
  19. Parking at Nicholson Lane mile 1.5 directions to trailhead 19
  20. Parking at Nicholson Lane mile 1.6 directions to trailhead 20
  21. Parking at Nicholson Lane mile 1.6 directions to trailhead 21
  22. Parking at Nicholson Lane mile 1.6 directions to trailhead 22
  23. Parking at Nicholson Lane mile 1.6 directions to trailhead 23
  24. Parking at Rockville Pike mile 1.6 directions to trailhead 24
  25. Parking at Brewer House Road mile 2.3 directions to trailhead 25
  26. Parking at Brewer House Road mile 2.3 directions to trailhead 26
  27. Parking at Brewer House Circle mile 2.4 directions to trailhead 27
  28. Parking at Brewer House Circle mile 2.5 directions to trailhead 28
  29. Parking at Hargett Lane mile 2.5 directions to trailhead 29
  30. Parking at Englishman Drive mile 2.7 directions to trailhead 30
  31. Parking at Fleming Avenue mile 3.4 directions to trailhead 31
  32. Parking at Forest Road mile 3.8 directions to trailhead 32
  33. Parking at Beech Avenue mile 4.1 directions to trailhead 33
  34. Parking at Old Georgetown Road mile 5 directions to trailhead 34
  35. Lot 41 mile 5.6 directions to Lot 41
Bethesda trolley trail near georgetown prep in north bethesda md 20200907 113904 1.jpg (opens in a new tab)
Bethesda trolley trail near georgetown prep in north bethesda md 20200907 113904 1.jpg · Photo: G. Edward Johnson · CC BY 3.0 · Wikimedia Commons

About this trail

The Bethesda Trolley Trail, at one time known as the North Bethesda Trail, is a paved trail for walking and bicycling between Bethesda and Rockville in Montgomery County, Maryland. The Montgomery County Department of Transportation (MCDOT) describes it as an urban greenway of more than six miles linking the two, with access to the National Institutes of Health (NIH), the Woodmont Triangle and downtown Bethesda, and counts it as part of the National Capital Trail Network. Wikipedia gives its length as 5.9 miles, from Bouic Avenue next to the Twinbrook Metro station in Rockville to Battery Lane Park in Bethesda.

The trail follows the route of the Rockville trolley line. The Tennallytown and Rockville Railroad connected Georgetown and Bethesda in 1891, the line was extended to Rockville between 1897 and 1900, the Washington Railway and Electric Company acquired it in 1902, and the trolleys stopped running in 1935. The county's 1978 Countywide Bikeways Master Plan recommended a trail on the old right-of-way, and construction began in the early 2000s. Bridges for walkers and cyclists over I-495 and I-270 opened in 2002 and 2003; construction from the Cedar Lane intersection to Randolph Road began in 2005; a southern section linking Battery Lane Urban Park and Rugby Avenue was built in 2008; and a shared-use path along Rockville Pike followed in 2009.

The trail runs largely on the old right-of-way but partly on roads, sidewalks and side paths. In North Bethesda the designated route uses segments of Rockville Pike (MD 355), Josiah Henson Parkway, Old Georgetown Road, Nebel Street and Chapman Avenue near Twinbrook, and MCDOT notes that most of these run beside high-speed roads with heavy traffic. A June 2023 MCDOT feasibility study, partly funded by a Maryland Bikeways Program grant, examined routes for extending the trail from Woodglen Drive and Nicholson Lane to Twinbrook, linking the North Bethesda and Twinbrook Metro stations. This record maps about 4.3 miles.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rockville 1 NE, 9.1 km from the trail's middle, 41 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424554667482878578665646
Low °F272836465564696760483831
Precipitation, in3.12.63.73.23.544343.53.33.4
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Frederick sheet (1:125,000); the 1956 Kensington sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • One rider in February 2024 linked the trolley trail to Capital Crescent, Mount Vernon and W&OD trails, returning by Metro; another in August 2025 suggested Battery Lane and Glenbrook for a quieter connection. r/bikedc, Feb 2024 · r/bikedc, Aug 2025
  • In August 2025, one rider reported a few poor-sidewalk blocks without bike lanes between NIH and Woodmont; another said a wide, uninterrupted shared path ran along Rockville Pike, roughly twice sidewalk width. r/bikedc, Aug 2025
  • Two people in July 2024 discussing bike commutes from Grosvenor to NIH differed: one called it easy, crossing Rockville Pike to reach the trolley trail; the other doubted its safety, citing aggressive drivers. r/bethesda, Jul 2024
  • In December 2025, one runner described a 2.5-mile out-and-back between Edson Lane and Old Georgetown; another said the trail continues north to North Bethesda, ending just before a Whole Foods. r/bethesda, Dec 2025
6 Reddit threads about this trail, Feb 2024 to Dec 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1084928, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Bethesda Trolley Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7054186, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Expanding the Bethesda Trolley Trail: Woodglen Dr & Nicholson Ln to Twinbrook Feasibility Study (June 2023) — Montgomery County Department of Transportation · government source · checked Oct 14, 2026
    Supports: urban greenway over six miles between Bethesda and Rockville; access to NIH, Woodmont Triangle, downtown Bethesda; part of the National Capital Trail Network; Rockville trolley line history (1891 Tennallytown and Rockville Railroad, 1897-1900 extension to Rockville, 1902 Washington Railway and Electric Company, 1935 end of service); 1978 Countywide Bikeways Master Plan; construction began early 2000s; 2005 Cedar Lane to Randolph Road; 2008 southern section to Battery Lane Urban Park and Rugby Avenue; 2009 Rockville Pike shared-use path; designated North Bethesda route on Rockville Pike, Josiah Henson Parkway, Old Georgetown Road, Nebel Street and Chapman Avenue beside high-speed roads; study scope and Maryland Bikeways Program grant
  5. Bethesda Trolley Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: former name North Bethesda Trail; 5.9-mile length; endpoints at Bouic Avenue by Twinbrook station and Battery Lane Park; asphalt surface; runs partly on roads, sidewalks and side paths; I-495 and I-270 bridges opened in 2002 and 2003

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.