Betsy Ligon Walking Trail
Rail-trail in Tennessee
Runs through Erin · Houston County
Conditions now
Loading the weather near Erin…
Forecast by the National Weather Service for Erin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Town Square mile 1.4 directions to trailhead 1
- Parking at Town Square mile 1.4 directions to trailhead 2
- Parking at Town Square mile 1.4 directions to trailhead 3
- Parking at Town Square mile 1.4 directions to trailhead 4
- Parking at East Front Street mile 1.5 directions to trailhead 5
- Parking at Town Square mile 1.5 directions to trailhead 6
- Parking at Town Square mile 1.5 directions to trailhead 7
- Parking at Town Square mile 1.5 directions to trailhead 8
- Parking at Town Square mile 1.5 directions to trailhead 9
- Parking at Town Square mile 1.5 directions to trailhead 10
- Parking at Court Street mile 1.5 directions to trailhead 11
- Parking at Court Street mile 1.5 directions to trailhead 12
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Betsy Ligon Walking Trail, listed by TrailLink as the Betsy Ligon Park & Walking Trail, is a paved path of about 2 miles through Erin, the county seat of Houston County, Tennessee. TrailLink, the Rails-to-Trails Conservancy's trail directory, classes it as a rail-trail. Erin's Irish festival, held each March since 1962, honors the Irish railroad workers who helped link the town to the rest of the world, and TrailLink notes that the festival parade ends at Betsy Ligon Park. No town, county or state page about the trail could be found.
TrailLink gives the trail's endpoints as McMillian Street and Gray Drive at one end and East Main Street near Cumberland City Highway at the other. Betsy Ligon Park, on Front Street near the town center, is the trail's main access point; it has a restored boxcar and caboose and the Railroad Memorial Pavilion, which holds interpretive signs. TrailLink directs visitors to park at the Front Street entrance to the pavilion, reached from Main Street (State Route 49) by turning south on Hill Street for 0.2 mile. Old limestone kilns stand about 100 yards north of the trail. Beyond the end of the pavement the rail corridor continues, and TrailLink reports plans to extend the trail to the town boundary and beyond.
The surface is asphalt, and benches line the route. TrailLink lists biking, inline skating and walking among the trail's uses and marks it wheelchair accessible; OpenStreetMap maps it as a shared path designated for both pedestrians and bicycles.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Tennessee Ridge, 7.9 km from the trail's middle, 83 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 47 51 61 71 78 86 89 89 82 72 59 50 Low °F 26 29 36 46 56 64 68 66 60 48 38 30 Precipitation, in 4 4.6 6 6 5.2 4 4 3.6 3 4.7 4.7 4.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1931 Erin sheet (1:62,500); the 1965 Erin sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Erin, Tennessee — Wikipedia · organization · checked Oct 15, 2026 Supports: Erin as county seat of Houston County; March Irish festival since 1962 honoring Irish railroad workers
- Betsy Ligon Park & Walking Trail — TrailLink · web · checked Oct 15, 2026 Supports: listed name, about 2 miles, asphalt, rail-trail category, endpoints, park features on Front Street, parking directions, kilns north of the trail, benches, parade ending at the park, rail corridor beyond the pavement and extension plans, activities and wheelchair accessibility
- Way: Betsy Ligon Walking Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: name, asphalt surface, path designated for foot and bicycle use
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.