States › California

Big Break Trail

Greenway in California

Runs through Oakley · Contra Costa County

Conditions now

Loading the weather near Oakley…

Forecast by the National Weather Service for Oakley · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.8 mi 4.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Weibel Circle mile 0.2 directions to trailhead 1
  2. Parking at Weibel Circle mile 0.2 directions to trailhead 2
Oakley, along the trail (opens in a new tab)
Oakley, along the trail · Photo: LPS.1 · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Big Break Trail, which the East Bay Regional Park District calls the Big Break Regional Trail, is a paved, relatively flat path in Oakley, Contra Costa County, California. It runs along the southern edge of Big Break through land of the Ironhouse Sanitary District and gives hikers, bicyclists and equestrians access to the southeastern edge of the estuary. Big Break Regional Shoreline, the 1,648-acre park district park at the trail's end, takes its name from a 1928 levee break that flooded an asparagus farm between the San Joaquin River and Dutch Slough and formed a small bay. The park's Delta Visitor Center opened in October 2012.

Big Break Regional Shoreline is a terminus of both the Big Break Regional Trail and the Marsh Creek Regional Trail. The Big Break trail connects to the northern end of the Marsh Creek Regional Trail, which in turn connects to the Delta de Anza Regional Trail by way of West Cypress Road; together the trails serve Oakley, Brentwood, Antioch, Pittsburg and Bay Point. The park entrance and visitor center are at 69 Big Break Road, and Tri Delta Transit Route 300 serves the park on weekdays.

Wheelchair-accessible drinking fountains and a wheelchair-friendly restroom stand beside the trail. The park is open from 5 a.m. to 10 p.m.; gate hours vary by season, from 8 a.m. to 5 p.m. between November and February to 8 a.m. to 7 p.m. between June and September, and the visitor center is open Wednesday through Sunday, 10 a.m. to 4 p.m. This record maps about 2.8 miles of the trail.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Tracy Pumping Plt, 25.8 km from the trail's middle, 16 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566267738088939289796657
Low °F404447505559626260544640
Precipitation, in2.52.31.60.80.50.1000.10.71.32.4
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1910 Jersey sheet (1:31,680); the 1952 Jersey Island sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Big Break Regional Shoreline — East Bay Regional Park District · organization · checked Oct 16, 2026
    Supports: Big Break Regional Trail paved and relatively flat; runs along the southern edge of Big Break through the Ironhouse Sanitary District; access for hikers, bicyclists and equestrians to the southeastern edge of the estuary; connects to the northern end of the Marsh Creek Regional Trail; Marsh Creek connects to Delta de Anza Regional Trail via West Cypress Road; Oakley, Brentwood, Antioch, Pittsburg, Bay Point; wheelchair-accessible fountains and restroom adjacent to the trail; park and gate hours; visitor center hours; 69 Big Break Road; 1928 levee break
  3. Big Break Regional Shoreline — Wikipedia · organization · checked Oct 16, 2026
    Supports: 1,648 acres in Oakley; 1928 levee break flooded an asparagus farm between the San Joaquin River and Dutch Slough, forming a small bay; Delta Visitor Center opened October 2012; terminus for Big Break Regional Trail and Marsh Creek Regional Trail; Tri Delta Transit Route 300 on weekdays
  4. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: record length about 2.8 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.