Bill Riley Trail
Rail-trail in Iowa · OpenStreetMap relation
Runs through Des Moines · Polk County
Conditions now
Loading the weather near Des Moines…
Forecast by the National Weather Service for Des Moines · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 45th Street mile 0 directions to trailhead 1
(opens in a new tab) About this trail
The Bill Riley Trail is a paved multi-use trail in Des Moines, Iowa, managed by the city's Parks and Recreation Department. Opened in 1972, it was the first trail of its kind in Des Moines. In 2003 the city called it the oldest and one of the most heavily used trails in its system, then 1.7 miles from Ashworth Park to Water Works Park, where it met the Great Western Trail, and noted that portions are part of the American Discovery Trail. TrailLink classes it as a greenway rather than a rail-trail.
The city now measures the trail at 3.47 miles, from the Ashworth Pool parking lot in Ashworth Park to its junction with the Meredith Trail on the south side of Gray's Lake Park. From the Ashworth Pool trailhead at 4500 Grand Avenue the trail follows Walnut Creek, meets the Walnut Creek Trail at a T-intersection, and runs through Water Works Park, where it passes the Iowa Interstate Railroad bridge on the bank of Walnut Creek. A trestle bridge carries it across the Raccoon River before it reaches Gray's Lake. The Ashworth Park trailhead has picnic facilities and a playground but no restrooms.
The surface is asphalt. In 2020 the city ordered a $425,000 repair of the trail at the Iowa Interstate Railroad bridge, including bank grading, steel sheet pile and concrete pavement. In March 2024 the City Council ordered a resurfacing of the full trail and of 0.87 miles of the Walnut Creek Trail, estimated at $970,000 and paid with American Rescue Plan Act funds, in four phases so that most of the trail could stay open; the city said no detours were possible. The first phase reopened in July 2024, and the work was expected to finish in early October 2024. City trail counters logged an estimated 236,051 trips on the Bill Riley Trail in 2023.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Union Pacific / Chicago & North Western line, built 1870–1887, abandoned 1975–2002 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Des Moines International Airport, 3.9 km from the trail's middle, 48 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 36 49 62 72 82 86 84 77 63 48 36 Low °F 14 18 30 41 52 62 66 64 55 43 30 20 Precipitation, in 1.1 1.3 2.2 4 5.2 5.3 3.8 4.2 3.2 2.8 1.9 1.6 Snow, in 9.4 10.2 4.4 1.2 0.2 0 0 0 0 0.5 2.7 7.9 - On the National Register
- Linden Heights Historic District, Des Moines · historic district, listed 2003 · nomination file for Linden Heights Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1905 Des Moines sheet (1:62,500); the 1956 Des Moines SW sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
-
360° view 1 of 4, photo by iowadatabike -
360° view 2 of 4, photo by iowadatabike -
360° view 3 of 4, photo by iowadatabike -
360° view 4 of 4, photo by iowadatabike
Nearby trails
- Meredith Trail within 0.2 mi · 2.9 mi, paved
- Kruidenier Trail within 0.2 mi · 2.0 mi, paved
- Walnut Creek Trail within 0.2 mi · 3.2 mi, paved
- Great Western Trail within 0.2 mi · 18.2 mi, paved
- Levee Trail (West Des Moines) 0.6 mi away · 2.6 mi, paved
- Martin Luther King Junior Trail 0.8 mi away · 4.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10346915, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Council Communication 24-118: Bill Riley Trail Resurfacing from Ashworth Pool to Gray's Lake — City of Des Moines (March 18, 2024) · organization · checked Oct 15, 2026 Supports: Park and Recreation Director; 3.47 trail miles from Ashworth Pool parking lot to the Meredith Trail on the south side of Gray's Lake Park; T-intersection with the Walnut Creek Trail; Water Works Park bridge; $970,000 ARPA-funded estimate; 0.87 miles of Walnut Creek Trail; four phases; no detours; completion early October 2024; 236,051 trips in 2023
- Roll Call 20-1409: Bill Riley Trail Repair at the Iowa Interstate Railroad Bridge — City of Des Moines (September 14, 2020) · organization · checked Oct 15, 2026 Supports: $425,000 repair at the Iowa Interstate Railroad bridge in Water Works Park on the bank of Walnut Creek; bank grading, steel sheet pile, concrete pavement
- Council Communication 03-462: Bill Riley Trail Federal Recreational Trails Grant Application — City of Des Moines (September 22, 2003) · web · checked Oct 15, 2026 Supports: 1.7-mile trail from Ashworth Park to Waterworks Park merging into the Great Western Trail; oldest and one of the most heavily used trails in the system; portions part of the American Discovery Trail
- Des Moines City Council approves resurfacing of the Bill Riley Trail in Des Moines — BIKEIOWA (March 20, 2024) · web · checked Oct 15, 2026 Supports: opened in 1972, first of its kind in Des Moines; council approval of resurfacing
- Part of popular Bill Riley trail reopening in Des Moines — BIKEIOWA (July 2024) · web · checked Oct 15, 2026 Supports: first of four phases reopening in July 2024; Des Moines Parks and Recreation
- Bill Riley Trail — TrailLink · web · checked Oct 15, 2026 Supports: greenway category; asphalt; follows Walnut Creek into Ashworth Park; trestle bridge across the Raccoon River; Ashworth Memorial Pool trailhead at 4500 Grand Avenue with picnic facilities and playground, no restrooms
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
