States › Ohio

Blacklick Creek Trail

Greenway in Ohio · OpenStreetMap relation

Runs through Reynoldsburg, Columbus, Blacklick Estates and Groveport · Fairfield and Franklin counties

Conditions now

Loading the weather near Columbus…

Forecast by the National Weather Service for Columbus · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
14.4 mi 23.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Main Street mile 0.4 directions to trailhead 1
  2. Parking at Broad Alley mile 0.5 directions to trailhead 2
  3. Parking at Blacklick Woods Park mile 1.8 directions to trailhead 3
  4. Parking at Blacklick Woods Park mile 2.1 directions to trailhead 4
  5. Parking at Blacklick Woods Park mile 2.1 directions to trailhead 5
  6. Parking at Blacklick Woods Park mile 2.5 directions to trailhead 6
  7. Parking at Hines Road mile 6.1 directions to trailhead 7
  8. Parking at Motts Place Road mile 6.7 directions to trailhead 8
  9. Parking at Long Road mile 6.7 directions to trailhead 9
Blacklick Creek Trail (opens in a new tab)
Photo: MrTwoScoops · CC BY-SA 4.0 · Mapillary

About this trail

The Blacklick Creek Trail, also called the Blacklick Creek Greenway Trail, is a 16-mile paved greenway trail along Blacklick Creek on the southeast side of the Columbus area in Ohio. It links three Metro Parks: Blacklick Woods, Pickerington Ponds and Three Creeks. Metro Parks, the Columbus and Franklin County park system, manages every section except a short stretch north of Blacklick Woods Metro Park. The trail follows the creek corridor rather than a railroad, and it belongs to the Central Ohio Greenways system developed by the Mid-Ohio Regional Planning Commission (MORPC), in which Metro Parks and the City of Columbus are major partners.

The trail grew out of Three Creeks Park at the confluence of Alum, Blacklick and Big Walnut creeks. The City of Columbus had run a park there, Three Rivers Park, since the early 1970s; in June 1998 it leased the site to Metro Parks, and Three Creeks became the 11th Metro Park that year. The first 2.8-mile section of the Blacklick Creek Greenway Trail was built and opened in 2001, starting in the park's Confluence Trails Area. Later sections carried it beyond the park to Pickerington Ponds and Blacklick Woods.

At Three Creeks the trail meets the Alum Creek Trail, which runs about 25 miles north toward Westerville and Polaris. Metro Parks describes both trails as wide and paved, with room for cyclists and for walkers with or without leashed dogs. The northern end of the mapped route is near East Main Street in Reynoldsburg.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Columbus-Valley Crossing, 7.3 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384352657583868580685443
Low °F192130405160646154423225
Precipitation, in3.42.63.944.43.94.63.63.62.933.4
Old maps

USGS topographic maps of the trail's middle go back to the 1925 East Columbus sheet (1:62,500); the 1955 Reynoldsburg sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, Apr 2024

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2245701, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenway Trails — Metro Parks, Central Ohio Park System · web · checked Oct 14, 2026
    Supports: 16 miles, paved; Blacklick Creek greenway corridor; Pickerington Ponds, Blacklick Woods and Three Creeks; Metro Parks manages all sections except a short section north of Blacklick Woods; Alum Creek Trail 24.5 miles from Westerville, meeting the Blacklick Creek Trail at Three Creeks; MORPC Central Ohio Greenways
  3. The Millennium Parks — Metro Parks, Central Ohio Park System · web · checked Oct 14, 2026
    Supports: Three Rivers Park run by the City of Columbus since the early 1970s at the confluence of Alum, Blacklick and Big Walnut creeks; June 1998 lease, Three Creeks the 11th Metro Park in 1998; Central Ohio Greenways with Metro Parks and the City of Columbus as major partners; first 2.8-mile section opened 2001 from the Confluence Trails Area; extension to Pickerington Ponds and Blacklick Woods, 16 miles; Alum Creek Trail nearly 25 miles to Polaris; wide paved trails for bikers and hikers with or without leashed pets
  4. Blacklick Creek Trail (relation 2245701) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: northern end of the mapped route near East Main Street, Reynoldsburg

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.