Blackstone River Greenway (MA)
Route in Massachusetts · OpenStreetMap relation
Runs through Worcester, Millbury, Northbridge, Uxbridge, Millville and Blackstone · Worcester County
Conditions now
Loading the weather near Whitinsville…
Forecast by the National Weather Service for Whitinsville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trails on this route
- Blackstone River Greenway 3.6 mi on the route of 14.2
- Plummer's Trail 0.9 mi on the route
- Canal Towpath 0.7 mi on the route
- Southern New England Trunkline Trail 0.5 mi on the route of 18.2
Each trail's page has its trailheads, surface and riding notes.
Plan your visit
- By trainAmtrak: Worcester, MA (WOR) 1.7 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
This record maps about 11 miles of the Massachusetts part of the Blackstone River Greenway, a paved trail envisioned at 50 miles between Worcester and Providence, Rhode Island; the southern part, from Providence into Millville, has its own page. The Department of Conservation and Recreation is building the Massachusetts greenway in seven segments. The pieces here lie in Worcester and Millbury, where segments 6 and 7 opened from 2010 through 2019; in Uxbridge and Northbridge; and in Millville and Blackstone, where the 3.7-mile segment 1 opened in 2017 and a half-mile extension over a rehabilitated railroad viaduct reached the Rhode Island line in November 2024. Between Route 146 in Uxbridge and Millbury no continuous route yet exists.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 39% of this route as a trail on former railroad right-of-way.
- Shade
60% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
West Medway, 16.7 km from the trail's middle, 11 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 41 48 60 71 79 84 83 76 65 53 43 Low °F 17 18 25 35 46 55 61 59 51 39 31 23 Precipitation, in 4.1 3.3 4.6 4.8 3.9 4.5 3.5 3.9 4.2 5.1 3.8 4.7 Snow, in 13.5 11.9 11 3.2 0 0 0 0 0 0.1 1.6 10.2 - On the National Register
- Blackstone Canal, Northbridge and vicinity · structure, listed 1973 · nomination file for Blackstone Canal
- Blackstone Viaduct, Blackstone · structure, listed 2002 · nomination file for Blackstone Viaduct
- Blackstone Canal (Boundary Increase), Providence · structure, listed 1991 · nomination file for Blackstone Canal (Boundary Increase)
- Central Woolen Mills District, Uxbridge · historic district, listed 1984 · nomination file for Central Woolen Mills District
- Blackstone Manufacturing Company Historic District, Blackstone · historic district, listed 1995 · nomination file for Blackstone Manufacturing Company Historic District
- Central Street Historic District, Millville · historic district, listed 2003 · nomination file for Central Street Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1886 Blackstone sheet (1:62,500); the 1953 Uxbridge sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Look around
-
360° view 1 of 4, photo by themapcenter -
360° view 2 of 4, photo by themapcenter -
360° view 3 of 4, photo by themapcenter -
360° view 4 of 4, photo by themapcenter
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15935886, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Wikidata Q4923424, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Southern New England Trunkline Trail (SNETT) and Blackstone River Greenway Projects — Mass.gov (DCR) · government source · checked Oct 13, 2026 Supports: 50-mile greenway from Providence to Worcester, seven Massachusetts segments, segment 1 (3.7 miles, Uxbridge, Millville, Blackstone) opened 2017, segments 6–7 (Millbury to Worcester) opened 2010 through 2019, no continuous route for segments 2–5 between Route 146/146A and Millbury
- DCR Celebrates Completion of Blackstone Section of the Southern New England Trunkline Trail — Mass.gov (November 22, 2024) · government source · checked Oct 13, 2026 Supports: half-mile extension from the Saint Paul Street Bridge to the Rhode Island border, rehabilitated railroad viaduct
- Blackstone River Greenway — Wikipedia · organization · checked Oct 13, 2026 Supports: seven-segment Massachusetts plan from Blackstone to Worcester
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
