Blaisdell Avenue Bikeway
Greenway in Minnesota
Runs through Minneapolis · Hennepin County
Conditions now
Loading the weather near Minneapolis…
Forecast by the National Weather Service for Minneapolis · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West 39th Street mile 0.2 directions to trailhead 1
- Parking at West 39th Street mile 0.2 directions to trailhead 2
- Parking at West 38th Street mile 0.2 directions to trailhead 3
- Parking at West 38th Street mile 0.2 directions to trailhead 4
- Parking at West 37th Street mile 0.3 directions to trailhead 5
- Parking at West 33rd Street mile 0.8 directions to trailhead 6
- Parking at West 34th Street mile 0.8 directions to trailhead 7
- Parking at West 32nd Street mile 0.9 directions to trailhead 8
- Parking at FIndley Place mile 1.1 directions to trailhead 9
- Parking at West 31st Street mile 1.1 directions to trailhead 10
- Parking at Blaisdell Avenue mile 1.1 directions to trailhead 11
- Parking at West Lake Street mile 1.2 directions to trailhead 12
- Parking at West Lake Street mile 1.2 directions to trailhead 13
- Parking at West Lake Street mile 1.2 directions to trailhead 14
- Parking at Pillsbury Avenue mile 1.3 directions to trailhead 15
- Parking at West Lake Street mile 1.3 directions to trailhead 16
- Parking at West 29th Street mile 1.4 directions to trailhead 17
- Parking at Blaisdell Avenue mile 1.5 directions to trailhead 18
- Parking at Blaisdell Avenue mile 1.5 directions to trailhead 19
- Parking at Blaisdell Avenue mile 1.5 directions to trailhead 20
- Parking at Blaisdell Avenue mile 1.5 directions to trailhead 21
- Parking at Blaisdell Avenue mile 1.5 directions to trailhead 22
(opens in a new tab) About this trail
The Blaisdell Avenue Bikeway is a protected bikeway on Blaisdell Avenue South in south Minneapolis, Minnesota. The City of Minneapolis built it as part of its Whittier/Lyndale bikeway project, dated 2020 to 2022. That project improved existing bikeways on parts of 1st Avenue South, Blaisdell Avenue South and 28th Street to strengthen bike connections between South Minneapolis neighborhoods and downtown. For the project the city proposed a two-way bikeway with curb and bollard protection, along with improved pedestrian crossings. The Transportation & Public Works Committee approved the layout on January 6, 2021, and the City Council followed on January 15, 2021. The layout was later revised to match the reconstruction of Lake Street at Blaisdell, part of the Interstate 35W project.
Project construction began at its north end the week of September 7, 2021. That year the work covered 15th to 32nd streets, and in 2022 it continued from 32nd to 40th Street. On Blaisdell and 28th Street the city built concrete curbs and pedestrian medians. In January 2022 Streets.mn reported that the new concrete-protected lanes between 28th and 32nd streets had been closed to cyclists since October 1, 2021. According to the city, they could not open until the weather was warm enough to paint the stripes. The city now lists the project as completed.
In OpenStreetMap the bikeway runs about 1.4 miles on Blaisdell, from the 40th Street Bikeway north to West 28th Street. It crosses Lake Street at a signal and passes over the Midtown Greenway on a bridge.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Minneapolis/St Paul Airport, 7.6 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 28 42 57 69 79 83 81 73 58 42 29 Low °F 9 13 25 38 50 60 65 63 54 41 28 15 Precipitation, in 0.9 0.9 1.7 2.9 3.9 4.6 4.1 4.3 3 2.6 1.6 1.2 Snow, in 11 9.5 8.2 3.5 0 0 0 0 0 0.8 6.8 11.4 - On the National Register
- Chicago, Milwaukee and St. Paul Railroad Grade Separation, Minneapolis · historic district, listed 2005 · nomination file for Chicago, Milwaukee and St. Paul Railroad Grade Separation
- Old maps
USGS topographic maps of the trail's middle go back to the 1896 Minneapolis sheet (1:62,500); the 1952 Minneapolis South sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Midtown Greenway within 0.2 mi · 6.3 mi, paved
- 1st Avenue South Bikeway within 0.2 mi · 1.3 mi, paved
- Bryant Avenue bikeway 0.5 mi away · 2.0 mi, paved
- Hennepin Avenue Bikeway 0.8 mi away · 3.2 mi, paved
- Lake Harriet Bike Trail 0.9 mi away · 2.8 mi, paved
- Lake of the Isles Bike Trail 1.1 mi away · 2.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Whittier/Lyndale bikeway — City of Minneapolis · government source · checked Oct 17, 2026 Supports: project dates 2020-2022; improvements on portions of 1st Avenue South, Blaisdell Avenue South and 28th Street; goal of connecting South Minneapolis neighborhoods and downtown; proposed two-way bikeway with curb and bollard protection and pedestrian crossing improvements; layout approvals January 6 and January 15, 2021; layout revised for Lake Street reconstruction at Blaisdell (35W project); construction from week of September 7, 2021 at the north end, 15th-32nd streets in 2021, 32nd-40th in 2022; concrete curbs and pedestrian medians on 28th and Blaisdell; project completed
- Open Protected Bike Lanes on Blaisdell — Streets.mn (Jesse Lorenz, January 14, 2022) · web · checked Oct 17, 2026 Supports: concrete-protected lanes on Blaisdell between 28th and 32nd streets closed to bicyclists since October 1, 2021; city's stated reason (waiting for weather warm enough to paint stripes)
- Blaisdell Avenue Bikeway — OpenStreetMap way 1315365533 (with ways 1134650629 to 1563561866) · web · checked Oct 17, 2026 Supports: name, protected bikeway note, mapped extent from the 40th Street Bikeway to West 28th Street (about 1.4 miles), signalized crossing at Lake Street, bridge over the Midtown Greenway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.