Bloomfield Greenway Multi-Use Trail
Rail-trail in Connecticut · OpenStreetMap relation
Runs through Bloomfield
Conditions now
Loading the weather near Tariffville…
Forecast by the National Weather Service for Tariffville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Day Hill Road mile 0 directions to trailhead 1
- Parking at Tariffville Road mile 1.4 directions to trailhead 2
- Parking at Tariffville Road mile 1.5 directions to trailhead 3
(opens in a new tab) About this trail
The Bloomfield Greenway Multi-Use Trail is a paved path in Bloomfield, Hartford County, Connecticut, built jointly by the Towns of Bloomfield and Simsbury as a link in the East Coast Greenway between Hartford and the Farmington Canal Heritage Trail. Its off-road core follows the former Connecticut Western Railroad bed, now a utility corridor on land largely owned by Eversource. Construction of the Bloomfield section began in July 2018. A connector along Route 189, funded with a $1,020,000 state LOTCIP grant administered by the Capitol Region Council of Governments (CRCOG) and $728,400 from the two towns, has linked the trail to Tariffville since November 2023.
The trail begins at a parking lot on Day Hill Road and runs northwest toward Route 189 (Tunxis Avenue), mostly within the utility corridor. The Route 189 connector, about 0.84 mile of 10-foot bituminous path largely within the state right-of-way and separated from traffic by a barrier, passes St. Andrew's Church on Tariffville Road and ends at the intersection of Main Street and Route 189 in Tariffville village, in Simsbury. The whole route was planned as a 2.83-mile commuter link to Griffin Corporate Park; CRCOG counted about 2.6 miles of completed trail from Day Hill Road to Main Street in Tariffville in spring 2024, and the route mapped here measures 2.3 miles.
A bridge crosses Griffin Brook near the Griffin Cascades, and a pedestrian signal was added at the Route 315 crossing. The regional East Coast Greenway gap closure study, whose final report was published in January 2026, set a preferred alignment for the unbuilt section from the Tunxis Avenue and Day Hill Road intersection south through Bloomfield and Hartford to the Charter Oak Greenway in East Hartford, and for the gap between Tariffville and the Farmington Canal Heritage Trail at Routes 10 and 315 in Simsbury.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
39% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hartford Bradley International Airport, 8 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 47 60 72 80 85 83 76 64 52 41 Low °F 19 21 28 38 48 58 63 62 54 42 33 25 Precipitation, in 3.3 3.1 3.8 3.9 3.8 4.3 4.2 4.2 4.4 4.5 3.5 4.1 Snow, in 14.2 14.8 9.4 1.1 0 0 0 0 0 0.7 1.4 10.1 - On the National Register
- Tariffville Historic District, Simsbury · historic district, listed 1993 · nomination file for Tariffville Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1892 Granby sheet (1:62,500); the 1956 Tariffville sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesTown of Bloomfield Trails Committee
- Agency noticesCRCOG: Capitol Region East Coast Greenway Study
Nearby trails
- Day Hill Multi-Use Trail 0.6 mi away · 3.7 mi, paved
- Farmington Canal Heritage Trail 1.2 mi away · 49.6 mi, paved
- Farmington River Trail 2.9 mi away · 12.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13092817, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Public Information Meeting: Bloomfield/Simsbury Multi-Use Trail — Town of Simsbury · government source · checked Oct 13, 2026 Supports: joint Simsbury–Bloomfield project, 0.84 mi, 10 ft bituminous, within Route 189 right-of-way with barrier, ends at Main St/Route 189 in Tariffville, Bloomfield facility construction July 2018, $1,020,000 LOTCIP via CRCOG, $728,400 town share
- State Approves, Provides Funding for Bloomfield to Tariffville Multi-use Trail Connector — Town of Simsbury · government source · checked Oct 13, 2026 Supports: $1,020,000 grant, 2.83-mile commuter route to Griffin Corporate Park, St. Andrew's Church on Tariffville Road, East Coast Greenway link between Hartford and the Farmington Canal Heritage Trail, Route 315 pedestrian signal
- Capitol Region East Coast Greenway (ECG) Study — Capitol Region Council of Governments · government source · checked Oct 13, 2026 Supports: gap 1 from the Tunxis Avenue and Day Hill Road intersection in Bloomfield to the Charter Oak Greenway in East Hartford, gap 2 from the Farmington Canal Trail at Routes 10 and 315 in Simsbury to the Tariffville connector at Route 189 and Main Street, preferred alignment, final report posted January 2026
- Capitol Region East Coast Greenway Study: Final Plan — CRCOG (January 2026) · government source · checked Oct 13, 2026 Supports: Bloomfield Greenway along the former Connecticut Western Railroad bed, now a utility corridor; Tariffville-Bloomfield Connector beside Route 189 linking Tariffville to the greenway since November 2023; about 2.6 miles of completed trail from Day Hill Road to Main Street in Tariffville as of spring 2024; existing trailhead at Day Hill Road; preferred alignment south from the trailhead
- A Bloomin' Trail System: Bloomfield Greenway — CTMQ · web · checked Oct 13, 2026 Supports: Day Hill Road parking lot trailhead, land mostly owned by Eversource, bridge over Griffin Brook, Griffin Cascades
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.