States › Illinois

Bloomingdale Trail

Rail-trail in Illinois · OpenStreetMap relation

Runs through Chicago · Cook County

Conditions now

Loading the weather near Chicago…

Forecast by the National Weather Service for Chicago · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
3.7 mi 6.0 km1
On former railbed
2.9 mi 77%
Opened
20152
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Ridgeway Avenue mile 0 · restrooms · water directions to trailhead 1
  2. Parking at North Monticello Avenue mile 0.1 directions to trailhead 2
  3. Parking at North Lawndale Avenue mile 0.1 · restrooms · water directions to trailhead 3
  4. Parking at North Monticello Avenue mile 0.2 directions to trailhead 4
  5. Trailhead at North Drake Avenue mile 0.3 directions to trailhead 5
  6. Parking at West Bloomingdale Avenue mile 0.4 directions to trailhead 6
  7. Parking at West Bloomingdale Avenue mile 0.4 directions to trailhead 7
  8. Parking at West Bloomingdale Avenue mile 0.4 directions to trailhead 8
  9. Parking at North Kimball Avenue mile 0.5 directions to trailhead 9
  10. Parking at North Spaulding Avenue mile 0.6 directions to trailhead 10
  11. Parking at West Bloomingdale Avenue mile 0.6 directions to trailhead 11
  12. Trailhead at West Bloomingdale Avenue mile 0.9 · water directions to trailhead 12
  13. Trailhead at West Bloomingdale Avenue mile 1 directions to trailhead 13
  14. Parking at North Richmond Street mile 1.1 directions to trailhead 14
  15. California Avenue Access Point mile 1.2 · water directions to California Avenue Access Point
  16. Trailhead at North California Avenue mile 1.2 · water directions to trailhead 16
  17. Parking at North Fairfield Avenue mile 1.3 directions to trailhead 17
  18. Trailhead at West Bloomingdale Avenue mile 1.5 · water directions to trailhead 18
  19. Parking at West Moffat Street mile 1.6 · water directions to trailhead 19
  20. Trailhead at West Bloomingdale Avenue mile 1.7 · restrooms directions to trailhead 20
  21. Trailhead at West Bloomingdale Avenue mile 1.8 · restrooms directions to trailhead 21
  22. Parking at West Saint Paul Avenue mile 1.8 · restrooms directions to trailhead 22
  23. Trailhead at West Bloomingdale Avenue mile 1.9 directions to trailhead 23
  24. Trailhead at North Milwaukee Avenue mile 2 directions to trailhead 24
  25. Parking at North Wilmot Avenue mile 2 directions to trailhead 25
  26. Trailhead at North Damen Avenue mile 2.2 · water directions to trailhead 26
  27. Trailhead at North Damen Avenue mile 2.2 · water directions to trailhead 27
  28. Parking at West Willow Street mile 2.2 directions to trailhead 28
  29. Trailhead at West Bloomingdale Avenue mile 2.5 directions to trailhead 29
  30. Parking at North Hermitage Avenue mile 2.5 directions to trailhead 30
  31. Parking at North Paulina Street mile 2.6 directions to trailhead 31
  32. Parking at North Marshfield Avenue mile 2.7 directions to trailhead 32
  33. Bloomingdale Trail mile 2.8 · water directions to Bloomingdale Trail
Bloomingdale Trail, aka the 606 (opens in a new tab)
Bloomingdale Trail, aka the 606 · Photo: airbus777 · CC BY · Flickr

About this trail

The Bloomingdale Trail is a 2.7-mile elevated rail-trail on Chicago's Northwest Side. It runs east–west along Bloomingdale Avenue between Ashland Avenue and Ridgeway Avenue through the Logan Square, Humboldt Park and West Town community areas. It is the centerpiece of The 606, a Chicago Park District park and trail system that links the trail to four neighborhood parks at ground level. The name comes from 606, the first three digits of nearly all of the city's ZIP codes. The system is open daily from 6 a.m. to 11 p.m.

The Chicago & Pacific Railroad built the Bloomingdale Line in 1873 as part of its 36-mile Elgin route. The line passed to the Milwaukee Road and, in 1986, to the Soo Line, a Canadian Pacific subsidiary. In the 1910s a city ordinance aimed at reducing deaths at grade crossings led to the tracks being raised about 20 feet onto an embankment with 38 viaducts. The last through freight train ran in 2001. The city's 2002–2004 Logan Square Open Space Plan proposed a greenway, and Friends of the Bloomingdale Trail formed in 2003. The city bought the right-of-way from Canadian Pacific in January 2013, held a groundbreaking on August 27, 2013, and opened the trail on June 6, 2015.

The path is concrete, with a blue rubberized running strip along each side, and is shared by cyclists, runners and walkers, with several access points along its length. At the east end, users leave the trail at Walsh Park on Marshfield Avenue and cross the Cortland and Ashland intersection to continue toward Elston Avenue. In August 2023 the Chicago Department of Transportation presented a preliminary plan to extend the trail over Ashland Avenue, under the Kennedy Expressway and the Union Pacific tracks, and across a disused rail bridge to Elston Avenue. Officials said construction could run from the second half of 2025 to the end of 2026, depending on further funding.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 78% of this route as an out-of-service rail line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chicago Midway Airport, 15 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333748607181858376634938
Low °F192332415262686659463525
Precipitation, in1.51.51.93.64.143.542.83.52.41.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1889 Chicago sheet (1:62,500); the 1953 Chicago Loop sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in October 2026 suggested the trail as a link: one went east to Cortland then Armitage toward the Lakefront Trail, another west to Humboldt Boulevard to join the boulevard system. r/chibike, Oct 2026
  • Riders in October 2026 said the Grand Illinois Trail loop passes along the Bloomingdale Trail and Lakefront Trail through Chicago, with the North Branch Trail as an alternate. r/bicycletouring, Oct 2026
2 Reddit threads about this trail, Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3419375, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Wikidata Q135785621, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  3. Official trail website · Official site · checked Oct 31, 2026
  4. The 606 — Chicago Park District · organization · checked Oct 15, 2026
    Supports: elevated Bloomingdale Trail as the centerpiece of The 606; connects to four neighborhood parks at ground level; biking, running and strolling; open daily 6 a.m. to 11 p.m.
  5. Bloomingdale Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: 2.7 miles along Bloomingdale Avenue between Ashland and Ridgeway; Logan Square, Humboldt Park and West Town; operated by the Chicago Park District; 606 ZIP code prefix; built 1873 by the Chicago & Pacific as part of the 36-mile Elgin subdivision; Milwaukee Road; Soo Line 1986; elevated about 20 feet in the 1910s by ordinance, 38 viaducts; last through freight 2001; Logan Square Open Space Plan 2002–2004; Friends of the Bloomingdale Trail formed 2003; city purchase January 2013; groundbreaking August 27, 2013; opened June 6, 2015; concrete surface with blue rubberized running path; access points
  6. City Unveils Preliminary Plan For 606's Bloomingdale Trail Extension — But Construction Is Still Years Away — Block Club Chicago (August 3, 2023) · organization · checked Oct 15, 2026
    Supports: users exit the east end at Walsh Park on Marshfield Avenue and use the Cortland/Ashland intersection to reach Elston; CDOT plan over Ashland, under the Kennedy Expressway and Union Pacific tracks, across an abandoned rail bridge to Elston Avenue; construction possibly second half of 2025 to end of 2026, dependent on additional funding

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.