Blue Mounds Biking & Hiking Trail
Greenway in Minnesota · OpenStreetMap relation
Runs through Mound Township, Luverne Township and Luverne · Rock County
Conditions now
Loading the weather near Luverne…
Forecast by the National Weather Service for Luverne · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 161st Street mile 0 · restrooms directions to trailhead 1
- Trail parking mile 2.3 directions to Trail parking
- Parking at North Blue Mound Avenue mile 4.4 directions to trailhead 3
- Parking at Roundwind Road mile 4.9 directions to trailhead 4
- Parking at Roundwind Road mile 4.9 directions to trailhead 5
- Parking at Roundwind Road mile 5 directions to trailhead 6
- Parking at East Main Street mile 5.5 directions to trailhead 7
- Parking at East Lincoln Street mile 5.5 directions to trailhead 8
- Parking at East Main Street mile 5.5 directions to trailhead 9
- Parking at South Blue Mound Avenue mile 5.5 directions to trailhead 10
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Blue Mounds Biking & Hiking Trail, called the Blue Mound Trail in local reporting, is a paved multi-use path in Rock County, Minnesota, that links the city of Luverne with Blue Mounds State Park to the north. The Minnesota Department of Natural Resources (DNR) describes a paved bike trail that starts in the park's picnic area and runs about 6 miles south to Luverne. The path was built under the Rock County engineer in 2002 and first paved in 2003; the county paid 20 percent of the cost except for work within the state park.
In Luverne the trail runs along North Blue Mound Avenue, and at the park it reaches the picnic area parking lot. The original plan paved it from the city along Blue Mound Avenue and County Road 8 to the lot near the quarry where rock climbers park, with gravel beyond to the lower lake, and a marked crossing of County Road 8 at the Blue Mound Avenue intersection, two miles north of Luverne. About 3 miles of the trail lie inside the park and 1.2 miles between Luverne and the park. The park sits on a landscape 300 feet above Luverne, and the remains of an old quarry lie near its interpretive center.
Cracks developed over the years because of a poor base, and in June 2025 Rock County began reconstructing 4.2 miles. Contractors ground the old 2½-inch bituminous surface and the aggregate beneath it into a new base and laid 2½ inches of new pavement, with concrete at some driveways and entrances. Duininck Inc. of Prinsburg bid $744,565; a state Transportation Alternatives Program grant covered 80 percent, the park up to $100,000 and Rock County $40,000. Completion was expected by Aug. 3, 2025.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Rock Rapids, 28.9 km from the trail's middle, 47 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 30 43 58 70 81 85 82 75 61 44 30 Low °F 6 10 22 34 47 58 62 59 50 36 23 12 Precipitation, in 0.6 0.7 1.5 3 4 5 3.6 3.1 3.2 2.2 1.4 0.8 Snow, in 6 7.3 5.6 3.5 0.1 0 0 0 0 0.4 3.6 8.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1955 Sioux Falls sheet (1:250,000); the 1967 Luverne sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 16622352, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Blue Mounds State Park (virtual tour) — Minnesota DNR · government source · checked Oct 15, 2026 Supports: paved bike trail from the park's picnic area about 6 miles south to Luverne; landscape 300 feet above Luverne; remains of an old quarry near the interpretive center
- Bike path to be paved next spring — Rock County Star Herald, October 30, 2002 · press · checked Oct 15, 2026 Supports: multi-purpose path from Luverne to Blue Mounds State Park; county engineer; grading and gravel work in 2002 with paving the next spring; county paying 20 percent except work in the park; paved along Blue Mound Avenue and County Road 8 to the climbers' lot near the quarry, gravel to the lower lake; crossing of County Road 8 at Blue Mound Avenue two miles north of Luverne
- Blue Mound Trail reconstruction project slated to begin June 26 — Rock County Star Herald, June 25, 2025 · press · checked Oct 15, 2026 Supports: first paved in 2003; reconstruction of 4.2 miles from June 26, 2025; cracking from a poor base; grinding and reclaiming method; concrete at driveways and entrances; Duininck Inc. bid $744,565; TAP grant 80 percent; park share up to $100,000 for 3 miles in the park; Rock County $40,000 for 1.2 miles; route along North Blue Mound Avenue to the park's picnic area parking lot; completion expected by Aug. 3
- Blue Mound Trail to undergo surface improvement — Rock County Star Herald, February 28, 2024 · press · checked Oct 15, 2026 Supports: state grant for a new surface on the 4.2-mile trail in 2025
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.