Blue River Trail
Rail-trail in Kansas · OpenStreetMap relation
Runs through Marysville · Marshall County
Conditions now
Loading the weather near Oketo…
Forecast by the National Weather Service for Oketo · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Frontier Road mile 6.6 directions to trailhead 1
- Parking at Jayhawk Road mile 11.6 directions to trailhead 2
- Parking at Hedrix Street mile 12.6 directions to trailhead 3
(opens in a new tab) About this trail
The Blue River Trail, also called the Blue River Rail Trail, is a crushed-limestone rail-trail in Marshall County, Kansas, that follows the Big Blue River north of Marysville toward the Nebraska state line. The Marysville school district's page describes it as built on a retired railroad bed that has been railbanked, about 13 miles long, with hours from sunrise to sunset and dogs allowed on a leash. TrailLink lists it at 12.7 miles, and the OpenStreetMap record measures about 12.4 miles.
According to the school district, segment one was completed in 2009, including a covered bridge and a covered bench overlooking the river and a railroad bridge, with the remaining sections to be finished in stages as funding allowed. TrailLink says the route runs between Marysville and the state line, where it meets the Chief Standing Bear Trail, which continues on the same corridor to Beatrice, Nebraska, and links with other trails toward Lincoln.
TrailLink lists parking where the trail meets roads: Jayhawk Road and Harvest Road in Marysville, Frontier Road in Hull, Deer Trail Road in Marietta, and Mill Street in Oketo. It describes a 2.9-mile stretch between Harvest Road and Frontier Road with a canyon and 20-foot walls, and a restored trestle with a steel-grid walkway near Marietta. A separate concrete section in downtown Marysville is not connected to the crushed-stone trail.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Marysville, 9.3 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 43 55 66 76 86 90 89 81 69 54 42 Low °F 15 19 30 40 52 62 67 64 54 41 30 20 Precipitation, in 0.8 1.1 2.1 3.1 4.9 4.9 4.7 3.6 3.3 2.5 1.5 1.2 Snow, in 4.9 4.3 1.5 0.7 0 0 0 0 0 0.1 1 3.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Marysville sheet (1:125,000); the 1966 Oketo sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2025 described plenty of shade from trees along the Blue River Trail and its Nebraska continuation, one saying it takes the edge off even the hottest days. r/bicycletouring, Jul 2025
- Riders in 2025 described frequent rest stops on the Chief Standing Bear section beyond the state line, with shelter and restrooms, and at some of them water or electrical power. r/bicycletouring, Jul 2025
- One rider who pedaled the route overnight in July 2025, from Kansas into Nebraska, reported only a light headwind of about 5 to 10 mph. r/bicycletouring, Jul 2025
1 Reddit thread about this trail, Jul 2025
- My 81 mile trip from last night, from Kansas to Nebraska r/bicycletouring · Jul 2025 · 4 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/kansas
Nearby trails
- Chief Standing Bear Trail within 0.2 mi · 22.5 mi, crushed stone · Nebraska
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1748266, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- The Blue River Trail — USD 364 (Marysville schools) · organization · checked Oct 18, 2026 Supports: railbanked railroad bed, about 13 miles, hours, leashed dogs, 2009 first segment, covered bridge, staged completion
- Blue River Rail Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 18, 2026 Supports: 12.7 miles, state line connection, parking locations, canyon and trestle, disconnected Marysville concrete section
- OpenStreetMap relation 1748266 · web · checked Oct 18, 2026 Supports: record length and compacted surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.