Bob Callan Trail
Greenway in Georgia · OpenStreetMap relation
In Cobb County
Conditions now
Loading the weather near Vinings…
Forecast by the National Weather Service for Vinings · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Interstate North Parkway Southeast mile 0 directions to trailhead 1
- Parking at Interstate North Circle Southeast mile 0.5 directions to trailhead 2
- Parking at Interstate North Circle Southeast mile 0.6 directions to trailhead 3
- Parking at Interstate North Circle Southeast mile 0.8 directions to trailhead 4
- Parking at Tower Creek Parkway Southeast mile 1.2 directions to trailhead 5
- Parking at Cumberland Boulevard Southeast mile 1.6 directions to trailhead 6
- Parking at Cumberland Boulevard Southeast mile 1.6 directions to trailhead 7
- Parking at River Parkway Southeast mile 2.9 · restrooms · water directions to trailhead 8
- Parking mile 3 · restrooms · water directions to trailhead 9
- Parking mile 3 · restrooms · water directions to trailhead 10
- Parking mile 3 · restrooms · water directions to trailhead 11
- Parking mile 3 · restrooms · water directions to trailhead 12
- Parking at Cobb Parkway South mile 3 · restrooms · water directions to trailhead 13
Plan your visit
- National Park ServiceRuns through Chattahoochee River National Recreation Area · park maps
Links checked Oct 18, 2026. Sources: National Park Service boundaries.
(opens in a new tab) About this trail
The Bob Callan Trail is a paved multi-use trail along Rottenwood Creek in the Cumberland area of Cobb County, Georgia, linking Terrell Mill Road with the Chattahoochee River at Paces Mill. It was built by the Cumberland Community Improvement District (CID) with Cobb County and is named for Bob Callan, a long-serving Federal Highway Administration engineer who championed the project. The Federal Highway Administration describes it as a four-mile trail, a priority project in Cobb County's Greenways and Trails Master Plan and part of a planned 25-mile trail network in and around Cumberland.
The first phase began in the 1990s as a $3.6 million part of the Kennedy Interchange, now Cumberland Boulevard, and was completed in 2007 as the Rottenwood Creek Trail, with its trailhead at the Paces Mill/Palisades unit of the Chattahoochee River National Recreation Area. A $9.1 million extension, begun in early 2017, opened in July 2019 and carried the trail north of Interstate 285 along Rottenwood Creek to Interstate North Parkway, where the Bob Callan Trailhead at Cumberland Boulevard has free parking. The final $7.4 million phase, the Windy Hill Road and Bentley Road section, opened with a ribbon cutting on September 11, 2025, and added a Windy Hill Road trailhead with accessible parking, shaded seating, bike repair stations and wayfinding signs.
The 2019 section is paved with porous concrete designed to carry pedestrians, cyclists and maintenance vehicles. It has six boardwalk sections totaling about 1,300 feet, a steel truss bridge over a tributary of the creek and an overlook of the shoals. Cobb County's Department of Transportation lists a trailhead on the Bob Callan Trail at Interstate North Parkway. This record maps about 3 miles, from Cobb Parkway near Paces Mill north to Interstate North Parkway, and appears not to include the 2025 section toward Windy Hill Road.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
53% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to June and August to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Mableton 1 N, 12 km from the trail's middle, 29 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 65 72 76 82 84 84 80 71 63 55 Low °F 32 35 40 48 57 65 68 68 62 51 40 35 Precipitation, in 4.9 4.9 4.9 4 4.2 4.1 7 4.8 3.7 4.2 4.5 4.9 Snow, in 0.7 0.2 0.1 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Atlanta sheet (1:125,000); the 1955 Sandy Springs sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBob Callan Trail — Cumberland CID
Nearby trails
- Mountain to River Trail within 0.2 mi · 13.3 mi, paved
- Silver Comet Trail Cumberland Connector 1.1 mi away · 4.2 mi, paved
- Concord Road Trail 3.0 mi away · 3.4 mi, paved
- Chastain Park PATH Trail 3.1 mi away · 2.5 mi, paved
- Whetstone Creek Trail 3.4 mi away · 1.6 mi, paved
- Silver Comet Trail 4.1 mi away · 60.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12622590, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Bob Callan Trail Extension — Project Profiles, Federal Highway Administration Center for Innovative Finance Support · government source · checked Oct 16, 2026 Supports: four-mile trail in Cumberland; priority project in Cobb County's Greenways and Trails Master Plan; planned 25-mile network; southern access at the CRNRA Palisades Trailhead at Paces Mill; Bob Callan Trailhead at Interstate North Parkway and Cumberland Boulevard with free parking; construction began early 2017, opened July 2019; $9.1 million cost; porous concrete surface for pedestrians, cyclists and maintenance vehicles; six boardwalk sections of about 1,300 feet; steel truss bridge over a creek tributary; overlook of the shoals
- Cobb County Trail Map (November 2022 draft) — Cobb County Department of Transportation · government source · checked Oct 16, 2026 Supports: trailhead 'Interstate North Pkwy & Bob Callan Trail at Interstate North Pkwy'
- Bob Callan Trail — Cumberland CID · web · checked Oct 16, 2026 Supports: named for Bob Callan, long-serving FHWA engineer; collaboration of Cobb County and the Cumberland CID; four miles from Terrell Mill Road to the Chattahoochee River at Paces Mill; Phase 1 begun in the 1990s as a $3.6 million part of the Kennedy Interchange (now Cumberland Boulevard), completed 2007 as Rottenwood Creek Trail with trailhead at Paces Mill/Palisades; Phase 2 $9.1 million extension north of I-285 along Rottenwood Creek to Interstate North Parkway; Phase 3 ($7.4 million) Windy Hill Road and Bentley Road section opened 2025, ribbon cutting September 11, 2025; Windy Hill Road trailhead amenities
- Bob Callan Trail (relation 12622590) — OpenStreetMap · web · checked Oct 16, 2026 Supports: this record's map line: about 3 miles from Cobb Parkway near Paces Mill north to Interstate North Parkway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.