States › California

Bob Jones Bike Trail

Rail-trail in California · OpenStreetMap relation

Runs through Avila Beach · San Luis Obispo County

Conditions now

Loading the weather near Avila Beach…

Forecast by the National Weather Service for Avila Beach · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.8 mi 2.9 km1
On former railbed
1.4 mi 79%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Bob Jones City to Sea Bike Trail Park and Ride mile 0 · restrooms directions to Bob Jones City to Sea Bike Trail Park and Ride
  2. Parking mile 0.2 directions to trailhead 2
  3. Parking at Lupine Canyon Road mile 1 directions to trailhead 3
  4. Parking at Bay Laurel Place mile 1.1 directions to trailhead 4
  5. Parking at Lupine Canyon Road mile 1.1 directions to trailhead 5
  6. Parking at Lupine Canyon Road mile 1.2 directions to trailhead 6
  7. Parking at 1st Street mile 2.4 directions to trailhead 7
  8. Parking at San Juan Street mile 2.5 · restrooms directions to trailhead 8
  9. Parking at 1st Street mile 2.5 · restrooms · water directions to trailhead 9
  10. Parking at 1st Street mile 2.5 · restrooms · water directions to trailhead 10
Bob Jones Trail, paved path with a yellow centre line (opens in a new tab)
Bob Jones Trail, paved path with a yellow centre line · Photo: County of San Luis Obispo, Public Works Department · Public domain (California public record) · slocounty.ca.gov

About this trail

The Bob Jones Trail, also called the Bob Jones City to Sea Trail, is a paved path for walking and cycling in San Luis Obispo County, California. Its Avila Beach segment runs about three miles on an old railroad right-of-way between the Avila Beach Golf Resort on the west and a trailhead near U.S. Highway 101 on the east. The trail exists in two pieces: this segment from Ontario Road to Avila Beach, and a shorter one in the city of San Luis Obispo between Prado Road and Los Osos Valley Road. San Luis Obispo County is working to join them into a continuous route between the city and the sea.

This record maps about 2.5 miles of the Avila Beach segment. Its eastern trailhead is the park-and-ride lot on Ontario Road beside Highway 101. In 2021 the county's Parks and Recreation Department announced a state Active Transportation Program recommendation of $18.25 million for a 4.5-mile extension, separated from traffic, from the Ontario Road park-and-ride to the Octagon Barn trailhead at the south end of San Luis Obispo, with a crossing under Highway 101 that removes at-grade crossings at San Luis Bay Drive and Clover Ridge Lane. Construction of the first segment, from the Octagon Barn to Cloverridge Lane, began on September 1, 2026 under a $10.5 million contract with Souza Construction and is expected to take up to 18 months; a later phase is to link the barn to the Ontario Road trailhead.

The existing trail closed on October 5, 2026, through early January 2027, for a restoration project covering habitat restoration, safety improvements and renewal of the trail. The Ontario Road trailhead parking lot was to close for about four to six weeks from October 19.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pismo Beach, 4.6 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F656568707270707172726965
Low °F444446485051545554534644
Precipitation, in3.54310.50.1000.10.81.83.1
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Arroyo Grande sheet (1:62,500); the 1965 Pismo Beach sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1672983, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. County Parks set to receive a $18.25 million grant — San Luis Obispo County Parks & Recreation (February 19, 2021) · government source · checked Oct 16, 2026
    Supports: $18.25 million ATP Cycle 5 recommendation; 4.5-mile extension separated from motor vehicles, Ontario Road park 'n' ride to the Octagon Barn trailhead; Highway 101 undercrossing; eliminating at-grade crossings at San Luis Bay Drive and Clover Ridge Lane; connection to the existing trail in Avila
  3. Avila Beach, California — Wikipedia · organization · checked Oct 16, 2026
    Supports: Bob Jones trail connects the Avila Beach Golf Resort to a trailhead near Highway 101; three miles; old railroad right-of-way; part of a planned trail to San Luis Obispo
  4. Bob Jones Trail construction to begin after decades of delays — KSBY (July 15, 2026) · web · checked Oct 16, 2026
    Supports: two existing segments (Prado Road to Los Osos Valley Road; Ontario Road to Avila Beach); phase 1 Octagon Barn to Clover Ridge Lane; phase 2 Octagon Barn to Ontario Road
  5. Construction begins in San Luis Obispo on Bob Jones Pathway project — KSBY (September 1, 2026) · web · checked Oct 16, 2026
    Supports: construction began September 1, 2026 on the Octagon Barn to Cloverridge Lane segment; $10.5 million contract with Souza Construction; ATP grant; up to 18 months; future extension to the Ontario Road trailhead; continuous connection between San Luis Obispo and Avila Beach
  6. Bob Jones Trail temporarily closes starting Monday for restoration project — KSBY (October 5, 2026) · web · checked Oct 16, 2026
    Supports: trail closed from Monday, October 5 through early January; restoration of habitat, safety and trail renewal; Ontario Road trailhead lot closed about 4 to 6 weeks starting October 19
  7. Relation: Bob Jones Bike Trail — OpenStreetMap · web · checked Oct 16, 2026
    Supports: mapped extent of the Avila Beach segment; park-and-ride trailhead at the east end

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.