States › Iowa

Bob Layton Trail

Greenway in Iowa · OpenStreetMap relation

Runs through Urbandale · Dallas and Polk counties

Conditions now

Loading the weather near Urbandale…

Forecast by the National Weather Service for Urbandale · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.4 mi 5.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Urbandale, along the trail (opens in a new tab)
Urbandale, along the trail · Photo: Dennis Bratland · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Bob Layton Trail is a paved trail in Urbandale, Iowa, that runs north and south through the city's Walnut Creek Regional Park. It is named for Bob Layton, who served as Urbandale's city manager for 25 years and retired in 2009.

The Des Moines Register reported in December 2012 that the city planned to seek bids for the trail, a route of about a mile through the 200-acre park at 153rd Street and Horton Avenue, at an estimated cost of $1.16 million. In June 2013 Urbandale Patch reported that the City Council had approved the project at nearly $805,000, with completion expected by the end of that year. The trail was planned between Meredith Drive and Douglas Parkway, closing a loop with trails on Meredith Drive and 156th Street, the connections to Hickman Road and Douglas Parkway, and the Raccoon River Valley Trail. Scott Hock, the city's assistant parks director, called it a link within the city and within the park system.

OpenStreetMap maps a regional bicycle route of about 3.6 miles under the trail's name, longer than the mile-long trail described when it was approved. The mapped route joins the park trail to unnamed connecting paths and to short on-street sections on Rocklyn Drive and 133rd Street.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines Wsfo-Johnston, 14.1 km from the trail's middle, 20 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303549627281858376634835
Low °F131729405262666455423019
Precipitation, in11.22.144.85.34.343.42.51.91.5
Snow, in9.710.551.60.200000.52.28.3
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Waukee sheet (1:62,500); the 1965 Grimes sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17331943, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Urbandale looks to acquire land to link trail system — BIKEIOWA (from the Des Moines Register, December 6, 2012) · web · checked Oct 15, 2026
    Supports: planned bid, about one mile, north to south through Walnut Creek Regional Park at 153rd Street and Horton Avenue, 200-acre park, $1.16 million estimate
  3. New Bob Layton Trail will link with others, close links — BIKEIOWA (from Urbandale Patch, June 19, 2013) · web · checked Oct 15, 2026
    Supports: namesake (city manager 25 years, retired 2009), council approval, nearly $805,000, completion expected end of 2013, Meredith Drive and Douglas Parkway, loop with Meredith Drive, 156th Street, Hickman Road, Douglas Parkway and Raccoon River Valley Trail connections, Scott Hock quote
  4. Bob Layton Trail, relation 17331943 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: regional bicycle route under the name, mapped length, on-street sections on Rocklyn Drive and 133rd Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.