States › Delaware

Brandywine Trail

Greenway in Delaware

In New Castle County

Conditions now

Loading the weather near Greenville…

Forecast by the National Weather Service for Greenville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Rockland Falls Road mile 0.1 · restrooms directions to trailhead 1
  2. Parking at Thompsons Bridge Road mile 1.6 · restrooms directions to trailhead 2

Plan your visit

Links checked Oct 18, 2026. Sources: National Park Service boundaries.

Rockland HD NewCastleCo DE (opens in a new tab)
Rockland HD NewCastleCo DE · Photo: Smallbones · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Brandywine Trail is a shared-use trail in Brandywine Creek State Park in northern New Castle County, Delaware, managed by the Delaware Department of Natural Resources and Environmental Control's Division of Parks and Recreation. It is a segment of the Northern Delaware Greenway, which crosses several state and county parks in northern New Castle County. The trail lies over an old roadbed that was once paved with macadam, and the state counts nearly 90,000 walks, hikes, runs and bike rides a year on the park's portion.

The trail is 2.9 miles long and runs close to the east bank of Brandywine Creek. It is reached from the Rockland Falls Road and Thompsons Bridge trailheads and extends from Thompson's Bridge Road to the state park's boundary with First State National Historical Park. Rocky Run Bridge is along the trail. The Creekside Trail, a hiking trail in the floodplain, connects to it in several places. The route mapped here is about 2.5 miles.

Visit Wilmington describes a gradually undulating crushed stone trail open to hiking, biking and horseback riding. In 2023 the division closed the section from Rockland Road to Rocky Run Bridge to pave it and repair drainage, because runoff from neighboring developments washed stone debris into the creek; the work, about $475,000 from Statewide Trails and Pathways funding, was the first project of the Brandywine Creek State Park Trail Plan approved in June 2022. The plan also calls for resurfacing the trail from Thompson's Bridge Road to the national park boundary. The division posts closures on the park's Facebook page.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

79% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June, August and October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Wilmington Porter Rsch, 5 km from the trail's middle, 40 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384149617179848275635243
Low °F242532425262676659473729
Precipitation, in3.734.74.13.84.75.24.45.14.13.24.4
Snow, in5.341.800000000.10.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1901 West Chester sheet (1:62,500); the 1954 Wilmington North sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Stretch of Brandywine Trail to Close for Improvements — State of Delaware News (DNREC, February 16, 2023) · government source · checked Oct 14, 2026
    Supports: DNREC Division of Parks and Recreation manages; segment of the Northern Delaware Greenway; old roadbed once paved with macadam; nearly 90,000 walks, hikes, runs and bike rides a year; 2023 closure Rockland Road to Rocky Run Bridge for paving and drainage, stone debris washing into the creek, about $475,000 Statewide Trails and Pathways funding; first project of the Brandywine Creek State Park Trail Plan approved June 1, 2022; planned resurfacing from Thompson's Bridge Road to the boundary with First State National Historical Park; closures posted on the park's Facebook page
  3. 7 Trails & Outdoor Fun in Brandywine Creek Park, Wilmington, DE — Visit Wilmington · web · checked Oct 14, 2026
    Supports: 2.9-mile length, close to the east bank of Brandywine Creek, gradually undulating crushed stone surface, hiking, biking and equestrian use, Thompsons Bridge and Rockland Falls Road trailheads, Creekside Trail in the floodplain connecting in several places
  4. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 14, 2026
    Supports: mapped length about 2.5 miles; New Castle County (with Nominatim)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.