Buffalo Bayou North Trail
Greenway in Texas
Runs through Houston · Harris County
Conditions now
Loading the weather near Houston…
Forecast by the National Weather Service for Houston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sawyer Street mile 1.8 directions to trailhead 1
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 2
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 3
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 4
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 5
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 6
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 7
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 8
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 9
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 10
- Parking at Memorial Drive Frontage Road mile 2.5 directions to trailhead 11
- Parking at Memorial Drive mile 2.8 directions to trailhead 12
- Parking at Memorial Drive mile 2.8 directions to trailhead 13
- Parking at Preston Street mile 2.9 directions to trailhead 14
- Parking at Franklin Street mile 3.1 directions to trailhead 15
- Parking at Franklin Street mile 3.2 directions to trailhead 16
- Parking at Washington Avenue mile 3.3 directions to trailhead 17
- Parking at Franklin Street mile 3.3 directions to trailhead 18
- Parking at Semmes Street mile 4.2 directions to trailhead 19
- Parking at Riverby Road mile 4.9 directions to trailhead 20
- Parking at Riverby Road mile 4.9 directions to trailhead 21
- Parking at Riverby Road mile 4.9 directions to trailhead 22
Plan your visit
- By trainAmtrak: Houston, TX (HOS) 0.2 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
Buffalo Bayou North Trail is the name OpenStreetMap gives to the hike-and-bike trail on the north bank of Buffalo Bayou in central Houston, from Shepherd Drive through Buffalo Bayou Park and downtown into the East End. This record maps about 4.7 miles in three main pieces; a separate record covers the south bank. The trails lie in the parks and corridors of Buffalo Bayou Partnership, a nonprofit; the enhancement of Buffalo Bayou Park was a collaboration of the partnership, the Kinder Foundation, the City of Houston through its Parks and Recreation Department, and the Harris County Flood Control District.
Buffalo Bayou Park is a 160-acre green space just west of downtown, from Shepherd Drive to Sabine Street between Allen Parkway and Memorial Drive, with a visitor center, bike rentals and limited parking at The Water Works, 105-B Sabine Street, and more than 400 public spaces at 1643 Memorial Drive. More than 300,000 Mexican free-tailed bats roost in the Waugh Drive Bridge. Downtown, between Sabine Street and US 59, the bayou trail system links Buffalo Bayou Park with points east, including a connection from Fannin to Austin streets through the lower levels of two historic Harris County buildings. East of US 59, the partnership's Kinder Trail on the north bank from US 59 to Jensen Drive was built from May 2024 to January 2026 under the Buffalo Bayou East 10-Year Plan, backed by a $100 million Kinder Foundation gift with Harris County and City of Houston support.
The mapped trail is concrete. The partnership notes that the asphalt trails in Buffalo Bayou Park between Shepherd Drive and Sabine Street are for walkers and runners only, and asks cyclists to keep under 10 mph and give pedestrians 3 feet. Lighted areas of the park are open 6 a.m. to 11 p.m.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston-Port, 9.3 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 63 67 73 79 86 91 93 94 90 82 72 65 Low °F 44 49 54 61 69 75 77 77 72 63 53 46 Precipitation, in 4 2.8 3.8 5.2 5.1 7.9 4.5 3.4 4.5 5.4 3.4 4.3 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- McKee Street Bridge, Houston · structure, listed 2002 · nomination file for McKee Street Bridge
- San Jacinto Street Bridge over Buffalo Bayou, Houston · structure, listed 2007 · nomination file for San Jacinto Street Bridge over Buffalo Bayou
- 1879 Houston Waterworks, Houston · structure, listed 1976 · nomination file for 1879 Houston Waterworks
- Myers--Spalti Manufacturing Plant, Houston · historic district, listed 2003 · nomination file for Myers--Spalti Manufacturing Plant
- Main Street/Market Square Historic District (Boundary Increase), Houston · historic district, listed 1984 · nomination file for Main Street/Market Square Historic District (Boundary Increase)
- Main Street/Market Square Historic District, Houston · historic district, listed 1983 · nomination file for Main Street/Market Square Historic District
- Old Sixth Ward Historic District, Houston · historic district, listed 1978 · nomination file for Old Sixth Ward Historic District
- San Felipe Courts Historic District, Houston · historic district, listed 1988 · nomination file for San Felipe Courts Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1915 Houston Heights sheet (1:24,000); the 1955 Houston Heights sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBuffalo Bayou Partnership: Trails & Destinations
Nearby trails
- White Oak Bayou Greenway within 0.2 mi · 23.5 mi, paved
- Buffalo Bayou South Trail within 0.2 mi · 4.0 mi, paved
- Heights Hike & Bike Trail within 0.2 mi · 6.2 mi, paved
- Polk Street Bikeway 0.9 mi away · 3.2 mi, surface unknown
- Harrisburg Hike & Bike Trail 1.0 mi away · 1.5 mi, paved
- Columbia Tap Rail Trail 1.0 mi away · 4.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Buffalo Bayou Park — Buffalo Bayou Partnership · organization · checked Oct 15, 2026 Supports: Shepherd Drive to Sabine Street between Allen Parkway and Memorial Drive; 160 acres; collaboration of BBP, Kinder Foundation, City of Houston/HPARD and HCFCD; Water Works visitor center, bike rentals and parking; 400+ spaces at 1643 Memorial Dr; lighted areas 6 AM to 11 PM; cycling tips (under 10 mph, 3 feet)
- Buffalo Bayou Downtown — Buffalo Bayou Partnership · organization · checked Oct 15, 2026 Supports: Sabine Street to US 59; trail connections linking Buffalo Bayou Park with points east; Fannin to Austin streets connection through two historic Harris County buildings; asphalt trails Shepherd to Sabine for walkers and runners only
- Buffalo Bayou East — Buffalo Bayou Partnership · organization · checked Oct 15, 2026 Supports: Kinder Trail US-59 to Jensen Drive (north bank), construction May 2024 to January 2026; Buffalo Bayou East 10-Year Plan; $100 million Kinder Foundation gift with Harris County and City of Houston support
- Trails & Destinations — Buffalo Bayou Partnership · organization · checked Oct 15, 2026 Supports: more than 300,000 Mexican free-tailed bats at the Waugh Drive Bridge
- OpenStreetMap ways named Buffalo Bayou North Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: trail name; north-bank alignment from Shepherd Drive to the East End; concrete surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.