States › Ohio

Canal Run

Canal towpath in Ohio · OpenStreetMap relation

Runs through Piqua · Miami County

Conditions now

Loading the weather near Piqua…

Forecast by the National Weather Service for Piqua · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.7 mi 4.3 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Water Street mile 0.1 · restrooms directions to trailhead 1
  2. Parking at Anderson Street mile 1.2 directions to trailhead 2
  3. Parking at Anderson Street mile 1.2 directions to trailhead 3
  4. Parking at SR 66 mile 2.4 directions to trailhead 4
  5. Parking at SR 66 mile 2.5 directions to trailhead 5
Piqua Historical Area, beside the trail (opens in a new tab)
Piqua Historical Area, beside the trail · Photo: Laura McKenzie Waters · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Hydraulic Canal Run, mapped in OpenStreetMap as the Canal Run bicycle route, is an asphalt path of about 2.3 miles in Piqua, Miami County, Ohio. It follows the city's Hydraulic Canal on Piqua's west side between French Park and Roadside Park on Swift Run Lake, and forms part of a loop around the city with the Piqua Linear Park rail-trail and the River's Edge path along the Great Miami River.

The canal was built to supply a city water system, bringing water to residents and businesses and for fighting fires; it drew water from the Miami and Erie Canal at Lockington. City council approved the hydraulic canal and water works in November 1865, and the Piqua Hydraulic Company was chartered that December. The city bought the company's canal and assets in 1872 and held an opening ceremony for the Piqua Water Works on June 16, 1872, with fire companies spraying water over the buildings on Main Street. As a source of hydraulic power it had only limited success, used by four or five firms. Today the canal is open only from High Street north to Swift Run, off State Route 66, and is also paddled by kayak.

From French Park the path heads north through woods, follows a levee along the east bank of Frantz Pond, passes Echo Pond and runs through 35-acre Fountain Park before ending at Roadside Park, where it connects to the Great Miami River Trail. It has three marked street crossings. Parking is at French Park (Steele and Water streets), at Roadside Park off State Route 66 near Hardin Road, and along Fountain Boulevard mid-route.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Piqua Wwtp, 3.8 km from the trail's middle, 17 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F364151647481848378665240
Low °F212332415261646255443425
Precipitation, in32.33.23.94.44.24.23.632.93.23
Old maps

USGS topographic maps of the trail's middle go back to the 1911 Covington sheet (1:62,500); the 1961 Piqua West sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1795498, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Piqua's Hydraulic Canal: It's Creation and Purpose — This Local Life (Judy Deeter) · web · checked Oct 14, 2026
    Supports: canal built as part of a water system for residents, businesses and fire fighting; water from the Miami and Erie Canal at Lockington; council approval November 16, 1865; Piqua Hydraulic Company chartered December 12, 1865; city purchase ordinance 1872; opening ceremony June 16, 1872 with fire companies streaming water over Main Street buildings; limited success as hydraulic power with four or five firms; open only from High Street north to Swift Run off State Route 66; viewable from the town's walking and biking trails
  3. Riding the Mirror: Kayaking Piqua's Hydraulic Canal — This Local Life (Matt Bayman) · web · checked Oct 14, 2026
    Supports: kayaking on the canal; canal next to the River's Edge bike trail
  4. Hydraulic Canal Run — TrailLink · web · checked Oct 14, 2026
    Supports: name, 2.3 miles, asphalt, Miami County, French Park to Roadside Park on Swift Run Lake, connection to Piqua City Linear Park, route through woods, levee on the east bank of Frantz Pond, Echo Pond, 35-acre Fountain Park, connection to the Great Miami River Trail, three marked street crossings, parking at French Park (Steele and Water streets), Roadside Park (off SR 66 near Hardin Road) and along Fountain Boulevard; reviewer description of the loop with the Linear Park and River's Edge paths along the city's west side
  5. Canal Run — OpenStreetMap relation 1795498 · web · checked Oct 14, 2026
    Supports: OpenStreetMap bicycle route named Canal Run

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.