States › Wisconsin

Cannonball Path

Rail-trail in Wisconsin

Runs through Fitchburg and Madison · Dane County

Conditions now

Loading the weather near Madison…

Forecast by the National Weather Service for Madison · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Cannonball Path is a 4-mile long shared-use trail in Madison, Wisconsin. It runs on a former Chicago and North Western railway line. The trail begins at a junction with the Military Ridge State Trail, Southwest Bike Path, Badger State Trail, and Capital City State Trail. It ends at Fish Hatchery Road and will eventually connect to the existing Wingra Creek Bike Trail.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
3.5 mi 5.6 km1
On former railbed
2.9 mi 83%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Martin Street mile 0 · restrooms · water directions to trailhead 1
  2. Parking at Emil Street mile 0.5 directions to trailhead 2
  3. Parking at West Beltline Frontage Road mile 0.6 directions to trailhead 3
  4. Parking at Post Road mile 1.4 directions to trailhead 4
  5. Parking at Leopold Way mile 1.5 directions to trailhead 5
  6. Parking at Leopold Way mile 1.6 directions to trailhead 6
  7. Parking at Crescent Road mile 3.2 directions to trailhead 7
  8. Parking at Crescent Road mile 3.2 directions to trailhead 8
  9. Parking at Crescent Road mile 3.3 directions to trailhead 9
  10. Parking at Crescent Road mile 3.3 directions to trailhead 10
Cannonball Path (opens in a new tab)
Photo: chris.rycroft · CC BY · Flickr

About this trail

The Cannonball Path is a paved shared-use path of about 4 miles in Dane County, Wisconsin, linking Fitchburg with Madison. It runs on a former Chicago and North Western railway line, a corridor TrailLink describes as a railbanked Union Pacific line. The path is a joint project of the cities of Madison and Fitchburg, with land acquisition partly funded by the Wisconsin Department of Natural Resources; Madison leads the work from the west line of the Arbor Hills neighborhood to the northern end. The first phase was completed in 2011.

The southwestern end is at a trail junction near Arrowhead Park in Fitchburg, where the path meets the Military Ridge State Trail, the Southwest Commuter Path, the Badger State Trail and the Capital City State Trail. The section within Fitchburg, crossing McKee Road on a trail bridge, is also known as the Military Ridge Path and may carry that name on Fitchburg's bike map. Heading northeast, the path curves through Arbor Hills along the edge of the University of Wisconsin Arboretum and crosses the Beltline (US 12/18) and its frontage road on a bridge. It ends at Fish Hatchery Road in Madison.

The surface is asphalt. The last piece, Phase 6, will carry the path north to the Wingra Creek Path. A first plan, following the railroad and then north through Bowman Park, failed when the Office of the Commissioner of Railroads denied a new at-grade crossing of the Madison Newspapers rail spur in July 2024. The approved route runs as a side path on the west side of Fish Hatchery Road to Carver Street, crosses at a new signal with a diagonal bike crossing, continues on the east side to Wingra Creek, and crosses the creek on a new bridge. Construction began the week of August 17, 2026, with most work due by fall 2026 and all of it by May 2027.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Uw Arboretum - Madison, 1.7 km from the trail's middle, 17 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283244576978828174614633
Low °F111425364757615951392818
Precipitation, in1.71.72.34.24.55.74.74.13.932.31.9
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Madison sheet (1:62,500); the 1959 Madison West sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in November 2026 disagreed on how to make a left turn at the planted traffic circle where the Cannonball meets the Capital City trail: some cut straight across when it was clear, others circled it. r/madisonwi, Nov 2026
  • Commenters in November 2026 said a Wisconsin DNR state trail pass is expected on the neighboring Capital City State Trail, rarely checked, though volunteers sometimes stop riders on busy days to sell a daily pass. r/madisonwi, Nov 2026
1 Reddit thread about this trail, Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Cannonball Path”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q127782186, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Cannonball Path Phase 6 — Engineering, City of Madison · government source · checked Oct 15, 2026
    Supports: four-mile path linking Fitchburg and Arbor Hills with downtown Madison; joint Madison–Fitchburg effort; DNR land acquisition funding; Madison lead from the west line of Arbor Hills; connections to Capital City, Southwest, Military Ridge and Badger State trails; Phase 6 to the Wingra Creek Path; Bowman Park alternative; OCR denial of Madison Newspapers spur crossing (July 31, 2024 update); Fish Hatchery Road side path, Carver Street signal and diagonal crossing, Wingra Creek bridge; construction from week of August 17, 2026, majority by fall 2026, completion May 2027
  5. Cannonball Path — Wikipedia · organization · checked Oct 15, 2026
    Supports: 4 miles; former Chicago and North Western line; trailheads at Fish Hatchery Road and Arrowhead Park; junction with Military Ridge, Southwest, Badger State and Capital City trails; first phase completed 2011; Beltline bridge
  6. Cannonball Path — TrailLink · web · checked Oct 15, 2026
    Supports: railbanked Union Pacific corridor; asphalt; Beltline and frontage road bridge; Arbor Hills; edge of the UW Arboretum; McKee Road trail bridge; Fitchburg section also called the Military Ridge Path; junction near Arrowhead Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.