States › Iowa

Carl Voss Trail

Greenway in Iowa · OpenStreetMap relation

Runs through Des Moines · Polk County

Conditions now

Loading the weather near Des Moines…

Forecast by the National Weather Service for Des Moines · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.6 mi 7.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Southeast 22nd Street mile 2.2 directions to trailhead 1
  2. Parking at Southeast 1st Street mile 4.6 directions to trailhead 2
  3. Parking at Southwest Water Street mile 4.6 directions to trailhead 3
Raccoon River, beside the trail (opens in a new tab)
Raccoon River, beside the trail · Photo: Tim Kiser (w:User:Malepheasant) · CC BY-SA 2.5 · Wikimedia Commons

About this trail

The Carl Voss Trail is a multi-use trail on the southeast side of Des Moines, Iowa, linking downtown with Easter Lake along the Des Moines River. It was formerly known as the South Des Moines River Trail. On April 8, 2019, the Des Moines City Council named it the Carl Voss Multi-Use Recreational Trail, honoring Voss for his work to promote biking and the city's multi-use trails. The last section, a stretch of about 2 miles, opened over Labor Day weekend in 2020 after about a year of construction. It cost about $1.8 million, more than half from grants. Voss, a city councilman, cut the ribbon at a dedication in October 2021, when more than 500 people a day used the trail.

The trail runs 4.7 miles from downtown south and east to Easter Lake, along the river and through woodland. At the lake it meets the 6-mile Mark C. Ackelson Trail, which circles the lake. The link connects the downtown trail network with Easter Lake Park, Ewing Park and the Karras-Kaul Connector Trail, and made it possible to ride from the southeast side of the city to Jefferson, Iowa, on trails.

Parts of the trail sit on Des Moines River levees, and the city's levee repair project, expected to finish in 2030, has closed sections. The section from SE 6th to SE 14th streets was closed for most of 2024 and reopened in November 2024; the section from SE 1st to SE 6th was expected to stay closed, with a detour north of the river, through mid-2025. A later phase east of SE 14th Street, scheduled for 2026 and 2027, was expected to close about a mile between SE 14th Street and Hartford Avenue with no official detour. In December 2025 the Iowa Department of Transportation proposed replacing the U.S. 69 river bridge, which would close the trail beneath it, with a detour, during construction.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Des Moines International Airport, 7.3 km from the trail's middle, 46 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313649627282868477634836
Low °F141830415262666455433020
Precipitation, in1.11.32.245.25.33.84.23.22.81.91.6
Snow, in9.410.24.41.20.200000.52.77.9
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Des Moines sheet (1:62,500); the 1956 Des Moines SE sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9379813, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Public comments needed for proposed U.S. 69 project in City of Des Moines park & trail access | Iowa Department of Transportation · government source · checked Oct 15, 2026
    Supports: proposed U.S. 69 bridge replacement over the Des Moines River, trail closure under the bridge during construction, detour
  3. Roll Call 19-0601: Naming of South Des Moines River Trail the Carl Voss Multi-Use Recreational Trail (April 8, 2019) - City of Des Moines · web · checked Oct 15, 2026
    Supports: former name South Des Moines River Trail, April 8, 2019 naming, reason for honoring Voss
  4. Missing piece of metro trail system opens for Labor Day holiday - BikeIowa · web · checked Oct 15, 2026
    Supports: opening over Labor Day weekend 2020 after about a year of construction, two-mile section, $1.8 million cost with more than half from grants (Des Moines Parks and Recreation), Voss as city councilman, riding to Jefferson on trails
  5. On The Carl Voss Trail | WHO 13 (October 29, 2021) · web · checked Oct 15, 2026
    Supports: dedication and ribbon cutting by Voss, more than 500 daily users, link between downtown and Easter Lake
  6. Recreation Areas Perfect For Memorial Day - dsm magazine · web · checked Oct 15, 2026
    Supports: 4.7-mile length, route from downtown south and east to Easter Lake along the river and through woodland, 6-mile Mark C. Ackelson Trail around the lake
  7. Dreaded Detour Over For Carl Voss Trail Users - DSM Bike Notes (January 23, 2025) · web · checked Oct 15, 2026
    Supports: trail on levees, levee repair closures (SE 6th-SE 14th closed most of 2024 and reopened before Thanksgiving; SE 1st-SE 6th closed through first half of 2025 with detour; planned 2026-2027 closure SE 14th to Hartford Avenue without official detour), levee project completion 2030, connections to Easter Lake Park, Ewing Park and Karras-Kaul Connector Trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.