Centennial Trail
Rail-trail in Washington · OpenStreetMap relation
Runs through Snoqualmie · King County
Conditions now
Loading the weather near Snohomish…
Forecast by the National Weather Service for Snohomish · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Southeast King Street mile 0 · restrooms directions to trailhead 1
- Parking at Railroad Avenue Southeast mile 0.2 directions to trailhead 2
(opens in a new tab) About this trail
This record gathers paths that OpenStreetMap names Centennial Trail, tagged for bicycles, in more than one place: ways in Snohomish County, Washington, along the route of the Snohomish County Centennial Trail, and others elsewhere in the state. It is not a separate trail.
The Snohomish County Centennial Trail, which has its own page, is a 30-mile paved trail from Snohomish to the Skagit County line on the former Burlington Northern line, managed by Snohomish County Parks and Recreation. Its development began in 1989 for Washington's centennial, which explains the name.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 57% of this route as an out-of-service rail line.
Former BNSF Railway line, abandoned 2007. From Rail Lines of Washington State (WSDOT).
- Shade
19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Snoqualmie Falls, 0.4 km from the trail's middle, 7 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 46 50 54 59 64 69 76 77 70 60 51 46 Low °F 36 35 37 40 46 51 54 54 49 44 38 36 Precipitation, in 8.6 5.8 6.7 5.3 4 3.1 1.2 1.2 3 6.2 9.5 8.4 Snow, in 1.5 0.2 0.3 0 0 0 0 0 0 0 0.1 1.5 - On the National Register
- Snoqualmie Depot, Snoqualmie · building, listed 1974 · nomination file for Snoqualmie Depot
- Snohomish Historic District, Snohomish · historic district, listed 1974 · nomination file for Snohomish Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1921 Sultan sheet (1:125,000); the 1953 Snoqualmie sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Snohomish County Centennial Trail within 0.2 mi · 30.6 mi, paved
- Snoqualmie Ridge Trail within 0.2 mi · 3.2 mi, paved
- Snoqualmie Valley Trail within 0.2 mi · 28.6 mi, crushed stone
- Riverfront Trail 0.2 mi away · 1.8 mi, paved
- Interurban Trail 0.5 mi away · 23.9 mi, paved
- Preston-Snoqualmie Trail 0.9 mi away · 6.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 6554049, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Centennial Trail — Snohomish County Parks · government source · checked Oct 17, 2026 Supports: 30 miles, Snohomish to Skagit line, Burlington Northern line, manager, development began 1989 in the state's centennial
- OpenStreetMap relation 6554049 · web · checked Oct 17, 2026 Supports: record built from ways named Centennial Trail; geometry read from the local record, not fetched
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.