States › Texas

Central Trail

Greenway in Texas · OpenStreetMap relation

Runs through Richardson · Collin and Dallas counties

Conditions now

Loading the weather near Richardson…

Forecast by the National Weather Service for Richardson · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.9 mi 9.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Lingco Drive mile 0.4 · water directions to trailhead 1
  2. Parking at Lingco Drive mile 0.5 directions to trailhead 2
  3. Parking at East Kaufman Street mile 1 directions to trailhead 3
  4. Parking at North Interurban Street mile 2 directions to trailhead 4
  5. Parking at East Arapaho Road mile 2 directions to trailhead 5
  6. Parking at North Greenville Avenue mile 2 directions to trailhead 6
  7. Parking at East Arapaho Road mile 2 directions to trailhead 7
  8. Parking at Hilltop Avenue mile 2 directions to trailhead 8
  9. Parking at Woodall Drive mile 2.2 directions to trailhead 9
  10. Parking at North Greenville Avenue mile 2.7 directions to trailhead 10
  11. Parking at Alma Road mile 2.8 directions to trailhead 11
  12. Parking at North Central Expressway mile 3.1 directions to trailhead 12
  13. Parking at North Central Expressway mile 3.3 directions to trailhead 13
  14. Parking at North Central Expressway mile 3.3 directions to trailhead 14
  15. Parking at Lakeside Boulevard mile 3.4 directions to trailhead 15
  16. Parking at Routh Creek Parkway mile 4.5 directions to trailhead 16
  17. Parking at North Glenville Drive mile 4.5 directions to trailhead 17
  18. Parking at Routh Creek Parkway mile 4.5 directions to trailhead 18
  19. Parking at Routh Creek Parkway mile 4.6 directions to trailhead 19
  20. Parking at Routh Creek Parkway mile 4.6 directions to trailhead 20
  21. Parking at Routh Creek Parkway mile 4.6 directions to trailhead 21
  22. Parking at Routh Creek Parkway mile 4.6 directions to trailhead 22
  23. Parking at Routh Creek Parkway mile 4.6 directions to trailhead 23
Richardson August 2019 42 (Central Trail).jpg (opens in a new tab)
Richardson August 2019 42 (Central Trail).jpg · Photo: Michael Barera · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Central Trail is a paved hike-and-bike trail in Richardson, Texas, built inside the right-of-way of the Dallas Area Rapid Transit (DART) light rail line, which makes it a rail-with-trail beside an active railroad. It takes its name from Central Expressway (US 75), which runs parallel to it. The City of Richardson owns the trail; state accessibility records show the city building the concrete section from Buckingham Road to Arapaho Road between January 2013 and May 2014, at an estimated cost of $3.5 million.

TrailLink gives the trail's length as 4.2 miles, from the Galatyn Woodland Preserve at Glenville Drive south to Buckingham Road. For a long stretch the path runs beneath the elevated track; elsewhere it crosses intersecting streets at grade. At its north end it continues as the Spring Creek Trail across Glenville Drive, and Community Impact describes it running north toward CityLine, where it connects with Plano. The Duck Creek Trail extension, which Richardson expected to finish in November 2020, meets it at Collins Boulevard and US 75. This record maps about 5.9 miles, including the northern section and short connectors.

The south end at Buckingham Road is set to be extended toward Dallas. In February 2024 the Richardson City Council approved up to $475,000 toward a 1.4-mile, $9.7 million project led by Dallas County, with $6.5 million from the Texas Department of Transportation. It would run from Buckingham Road to sidewalks west of the Dallas College Richland Campus and on to Dallas's Cottonwood Creek Trail, adding a crossing of the DART line on Buckingham Road and a 12-foot trail along Greenville Avenue. County documents called for a contractor to be chosen by December 2025; no completion date was given.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Richardson, 3.6 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566069758390949587786657
Low °F364048556471757467564638
Precipitation, in2.83.43.63.55.23.82.22.53.35.333.4
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1959 Garland sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in May 2024 said the trail passes restaurants and bars near CityLine, Campbell Road, Arapaho Road (a brewery is reached by cutting under the tracks), Belt Line Road and Spring Valley. r/Dallas, May 2024
  • Riders in 2025 and 2026 said the south end stops short of Dallas; one suggested Buckingham Road, Sherman Street and TI Boulevard to Cottonwood Creek Trail, another used TI Boulevard to White Rock Creek Trail. r/dfwbike, May 2025 · r/dfwbike, May 2026
  • Riders in 2024 described commuting to Richardson from Northwest Dallas via Northaven Trail, a short side-street stretch and Central Trail (14 miles, just over an hour), or from Plano along trails and DART-side walkways (11 miles). r/Dallas, Apr 2024
4 Reddit threads about this trail, Apr 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Central Trail (opens in a new tab)
  1. 360° view 1 of 4, photo by ndelregno
  2. 360° view 2 of 4, photo by ndelregno
  3. 360° view 3 of 4, photo by ndelregno
  4. 360° view 4 of 4, photo by ndelregno
360° panorama · Photo: ndelregno · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17875269, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Project EABPRJB3804253, Central Trail — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: City of Richardson as owner; concrete hike and bike trail from Buckingham to Arapaho; start January 1, 2013, completion May 31, 2014; estimated cost $3,500,000
  3. Richardson council approves portion of funding for $9.7M Central Trail extension — Community Impact (February 28, 2024) · web · checked Oct 15, 2026
    Supports: existing trail ends at Buckingham Road; 1.4-mile extension, nearly $9.7 million; Dallas County lead agency; TxDOT $6.5 million; Richardson up to $475,000; route to sidewalks west of Dallas College Richland Campus and Cottonwood Creek Trail; DART rail crossing on Buckingham Road; 12-foot trail along Greenville Avenue; contractor to be chosen by December 2025; no timeline
  4. Richardson makes headway on major trail projects — Community Impact (September 16, 2020) · web · checked Oct 15, 2026
    Supports: Central Trail runs north toward CityLine and connects with Plano; Duck Creek Trail extension meets it at Collins Boulevard and US 75, expected November 2020
  5. Central Trail (TX) — TrailLink · web · checked Oct 15, 2026
    Supports: rail-with-trail in the DART light rail right-of-way; named for Central Expressway; 4.2 miles from Galatyn Woodland Preserve (Glenville Drive) to Buckingham Road; runs beneath the elevated track for a long stretch; street crossings; transitions into the Spring Creek Trail across Glenville Drive
  6. Central Trail, relation 17875269 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped extent of about 5.9 miles including connectors

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.