Chase Trail
Rail-trail in Alaska
Runs through Chase · Matanuska-Susitna Borough
Conditions now
Loading the weather near Chase…
Forecast by the National Weather Service for Chase · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
Chase Trail is a gravel multi-use trail that follows the Alaska Railroad north from Talkeetna, Alaska, in the Matanuska-Susitna Borough. Alaska.org describes it as a 5.5-mile, wide, flat path graded with gravel that begins just beyond the parking area on South Railroad Avenue in downtown Talkeetna and runs beside the tracks. Hikers, bicyclists and ATV riders use it in summer, and cross-country skiers in winter. Offshoots lead to private property along the rail belt, and the page asks visitors to respect the owners' privacy. The community of Chase lies 9.2 miles north of Talkeetna. This record covers about 3.4 miles of the trail as mapped in OpenStreetMap, which notes that ATVs are allowed on one section.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Talkeetna Airport, 11.7 km from the trail's middle, 50 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 22 28 35 47 59 67 69 65 56 42 28 23 Low °F 5 9 12 26 37 47 51 48 39 26 13 8 Precipitation, in 1.3 1.2 1.1 1.3 1.6 1.7 2.9 4.7 4.5 2.8 1.8 1.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1950 Talkeetna sheet (1:250,000); the 1958 Talkeetna B-1 sheet (1:63,360) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Chase Trail - Alaska.org · organization · checked Oct 17, 2026 Supports: 5.5 miles, graded gravel, beside the Alaska Railroad, start in Talkeetna, hiking, biking, ATV and ski use, private offshoots
- Chase, Alaska - Wikipedia · organization · checked Oct 17, 2026 Supports: Chase is 9.2 miles north of Talkeetna, Matanuska-Susitna Borough
- OpenStreetMap way 1351147390 (Chase Trail) · web · checked Oct 17, 2026 Supports: ATVs allowed note on a mapped section
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.