Chattahoochee Valley Railroad Trail
Rail-trail in Alabama · OpenStreetMap relation
Runs through Valley · Chambers County
Conditions now
Loading the weather near Valley…
Forecast by the National Weather Service for Valley · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Chattahoochee Valley Railroad Trail, sometimes referred to as the CVRR Trail, is a 7.5-mile long asphalt-covered rail trail in Valley, Alabama. Made from a section of the defunct Chattahoochee Valley Railway, the trail runs through all four historic districts of the town. These districts were formerly separate towns that were serviced by the railroad. These towns later combined to form the town of Valley in 1980.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
Plan your visit
- National Recreation TrailDesignated in 2011 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
About this trail
The Chattahoochee Valley Railroad Trail is a paved rail-trail of about 7.5 miles in the City of Valley, Chambers County, Alabama, maintained by the Valley Parks and Recreation Department. It lies on the bed of the Chattahoochee Valley Railway, which opened in January 1897 as a 10-mile line from West Point, Georgia, to the mill at Riverview, with stops at Shawmut, Langdale and Fairfax, and served the area's four textile mills. The four mill villages joined to form the town of Valley in 1980, and the railroad ceased operations in 1992. City council member Arnold Leak pursued federal ISTEA grants for the conversion; construction began in 1998 and was finished in 2000. Both the northern and southern sections were designated National Recreation Trails in 2011.
The northern terminus is at 22nd Avenue in Shawmut. The trail runs south through forest, with pull-offs that often look out over the Chattahoochee River, to Langdale, where the northern section ends and the southern section begins between 56th Street West and 59th Street; the two are joined by a half-mile link on roads and sidewalk. The southern section passes the Fairfax Depot at Railroad Street and River Road, built in 1917 and now a rest area and train museum, and ends at School Street in Riverview. The Horace King Memorial Covered Bridge, built in 2004 in the style of the architect Horace King, stands along the route. This record maps the two sections at about 6.6 miles.
The surface is mainly asphalt with some concrete, 96 inches (8 feet) wide, with an average grade of about 1 percent and elevations between 548 and 696 feet. A 2009 grant from the Alabama Department of Economic and Community Affairs paid for ten fiberglass historical markers along the trail, which passes about sixteen sites of historical significance.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
41% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: January to February, April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
W Pt, 10.4 km from the trail's middle, 38 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 60 67 75 82 88 90 89 84 75 66 58 Low °F 32 35 41 48 57 65 69 68 63 50 40 35 Precipitation, in 4.9 4.7 5.3 4.6 3.9 3.9 4.7 4 3.7 3.1 4.4 5.4 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0.1 - On the National Register
- Riverview Historic District, Valley · historic district, listed 1999 · nomination file for Riverview Historic District
- Fairfax Historic District, Valley · historic district, listed 1999 · nomination file for Fairfax Historic District
- Langdale Historic District, Valley · historic district, listed 1999 · nomination file for Langdale Historic District
- Shawmut Historic District, Valley · historic district, listed 1999 · nomination file for Shawmut Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1907 Opelika sheet (1:125,000); the 1964 Lanett South sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Alabama
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9721725, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Chattahoochee Valley Railroad Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q98078153, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Chattahoochee Valley Railroad Trail — Wikipedia · organization · checked Oct 16, 2026 Supports: 7.5 miles, Valley Parks and Recreation, railway opened January 1897 as a 10-mile line from West Point to Riverview with stops at Shawmut, Langdale and Fairfax, Valley formed 1980, railroad abandoned 1992, Arnold Leak and ISTEA grants, construction 1998-2000, both sections National Recreation Trails 2011, termini at 22nd Avenue and School Street, section break at 56th Street West and 59th Street with half-mile link, river pull-offs, Fairfax Depot 1917, Horace King Memorial Covered Bridge 2004, asphalt and concrete 96 inches wide, 1 percent grade, elevations, 2009 ADECA historical markers, about sixteen historic sites
- Chattahoochee Valley Railroad (CVRR) Trail - South — National Recreation Trails · organization · checked Oct 16, 2026 Supports: City of Valley, Chambers County; Valley Parks and Recreation Department; paved; on top of the railroad that served the four textile mills; ceased operations 1992; NRT certified May 19, 2011; bicycling and walking
- Chattahoochee Valley Railroad Trail — OpenStreetMap relation 9721725 · web · checked Oct 16, 2026 Supports: mapped length of the two sections
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.