States › New York

Cheektowaga Bikepath

Greenway in New York

Runs through Sloan and Cheektowaga · Erie County

Conditions now

Loading the weather near Cheektowaga…

Forecast by the National Weather Service for Cheektowaga · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.6 mi 4.2 km1
On former railbed
1.6 mi 62%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Cheektowaga Bikepath mile 0.7 directions to trailhead 1
  2. Parking at St Felix Avenue mile 1.3 directions to trailhead 2
  3. Parking at Ludwig Avenue mile 1.6 directions to trailhead 3
  4. Parking at Raymond Avenue mile 1.7 directions to trailhead 4
  5. Parking at Union Road mile 2.2 directions to trailhead 5
  6. Lehigh Valley Railroad Park and Ride mile 2.3 directions to Lehigh Valley Railroad Park and Ride

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Cheektowaga Bikepath (opens in a new tab)
Photo: rking · CC BY-SA 4.0 · Mapillary

About this trail

The Cheektowaga Bikepath is a paved path of about 2.6 miles in the town of Cheektowaga, Erie County, New York, a suburb east of Buffalo. The Town of Cheektowaga lists a Rails to Trails path among its parks and facilities, and the Rails-to-Trails Conservancy's TrailLink guide describes the same route as the Cheektowaga Historic Rails to Trails, a 2.3-mile rail-trail. No government, manager or press source reachable for this article gives the trail's opening date or the history of its corridor.

TrailLink describes the route as beginning at a western trailhead on Medina Street and running north and east through a wooded corridor, then for about 1.5 miles beside an active rail line, at a wide berth, past Wrazen and Raymond parks to Union Road. From the Union Road end, a sidewalk route marked with periodic bike route signs leads to Stiglmeier Park.

The surface is asphalt and concrete, and the path is used for bicycling, inline skating and walking. Parking is listed at Raymond Park, 36 Sandy Lane, and at Stiglmeier Park, 810 Losson Road. A TrailLink user review from August 2026 reported tree roots breaking through the pavement in places.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

LV Main Line, Union Road Branch and LV Lehigh & Lake Erie Ind'l Trk (Conrail). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Buffalo, 7 km from the trail's middle, 22 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323342556776807972604837
Low °F192026364858636254443426
Precipitation, in3.42.52.93.43.43.43.23.24.143.53.8
Snow, in26.718.114.12.5000000.97.825.3
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Buffalo sheet (1:62,500); the 1950 Buffalo NE sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rails To Trails — Town of Cheektowaga · organization · checked Oct 14, 2026
    Supports: the town lists Rails to Trails under Parks & Facilities
  3. Cheektowaga Historic Rails to Trails — TrailLink · web · checked Oct 14, 2026
    Supports: name Cheektowaga Historic Rails to Trails, 2.3 miles, Medina Street to Union Road, wooded corridor, about 1.5 miles beside an active rail line, Wrazen and Raymond parks, sidewalk route with bike route signs to Stiglmeier Park, parking addresses, asphalt and concrete surface, activities, August 2026 review reporting roots in the pavement

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.