States › Maryland

Chesapeake Beach Railroad Trail

Rail-trail in Maryland

Runs through Brown Station and Marlboro Village · Prince George's County

Conditions now

Loading the weather near Marlboro Village…

Forecast by the National Weather Service for Marlboro Village · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.1 km1
On former railbed
0.3 mi 24%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Penzance Place mile 0 directions to trailhead 1
Chesapeake Beach Railroad Trail drawn on the 1944 USGS topographic map of Upper Marlboro, Maryland
Then: the 1944 USGS Upper Marlboro sheet (1:31,680) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Chesapeake Beach Railroad Trail is a paved path in central Prince George's County, Maryland, on part of the old Chesapeake Beach Railway corridor. The Maryland-National Capital Park and Planning Commission (M-NCPPC) lists it among its Prince George's parks and trails with an Upper Marlboro address, 31.54 acres of parkland and dawn-to-dusk hours. It is one of the short built pieces of the Chesapeake Beach Rail Trail, a planned corridor that M-NCPPC has acquired in portions through the subdivision process and will own and maintain; plans call for about 11 miles in Prince George's County and 28 miles of greenway through Calvert and Anne Arundel counties.

The railway ran 27.6 miles from Washington, D.C., through Upper Marlboro and Maryland farm country to a resort at Chesapeake Beach on the bay. Its construction was overseen by the Colorado railroad builder Otto Mears. It operated from 1898 until it closed amid the Great Depression and the rise of the automobile; the last train left on April 15, 1935.

As mapped, the trail runs about 1.3 miles southeast from the Largo area toward Marlboro Village, with trailhead parking off Penzance Place. Elsewhere in the county, the town of Upper Marlboro obtained planning-assistance funding in June 2023 for a feasibility and design study of another segment of the rail trail, between MD 725 (Marlboro Pike) and the county's equestrian center. At the bay end, a separate Chesapeake Beach Railway Trail in Calvert County was dedicated on September 30, 2011.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Former Chesapeake Beach RR (STB docket FD-10739). From MDOT SHA Railroad Centerline Routes.

Shade

63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Upper Marlboro 3 NNW, 2.5 km from the trail's middle, 12 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444755667584888680695848
Low °F252633445463676558463629
Precipitation, in32.73.93.44.14.24.24.14.54.13.23.5
Snow, in5.76.31.7000000002.2
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Patuxent sheet (1:125,000); the 1957 Upper Marlboro sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Chesapeake Beach Rail Trail Segment Feasibility and Design Study — Prince George's County Planning Department · organization · checked Oct 14, 2026
    Supports: Upper Marlboro segment study, PAMC funding approved June 22, 2023
  3. Chesapeake Beach Rail Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: planned rail trail, M-NCPPC acquisition through subdivision and future ownership, 11 miles in Prince George's and 28 miles in Calvert and Anne Arundel, study segment between MD 725 and the equestrian center, Calvert section dedicated September 30, 2011
  4. Chesapeake Beach Railway — Wikipedia · organization · checked Oct 14, 2026
    Supports: 27.6-mile route from Washington through Upper Marlboro to Chesapeake Beach, Otto Mears, operation from 1898, closure and last train April 15, 1935
  5. Chesapeake Beach Railroad Trail — Prince George's County Parks and Recreation (M-NCPPC) · web · checked Oct 14, 2026
    Supports: trail name, M-NCPPC listing, Upper Marlboro address, 31.54 acres, dawn-to-dusk hours
  6. Chesapeake Beach Railroad Trail (way 640385259) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: mapped route between the Largo area and Marlboro Village, paved cycleway on the abandoned railbed, Penzance Place parking

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.