States › Ohio

Chessie Circle Trail

Rail-trail in Ohio

Runs through Toledo · Lucas County

Conditions now

Loading the weather near Toledo…

Forecast by the National Weather Service for Toledo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.4 mi 7.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Jackman Road mile 0 directions to trailhead 1
  2. Parking at Slater Street mile 0 directions to trailhead 2
  3. Parking mile 0.4 directions to trailhead 3
  4. Parking at Pelham Road mile 2.9 directions to trailhead 4
  5. Parking at Douglas Road mile 2.9 directions to trailhead 5
  6. Parking at South Detroit Avenue mile 7.9 · restrooms · water directions to trailhead 6
  7. Parking at River Road mile 8.8 directions to trailhead 7
Maumee River RR Trestle P2190003 (opens in a new tab)
Maumee River RR Trestle P2190003 · Photo: Chris Light · CC BY-SA · Wikimedia Commons

About this trail

The Chessie Circle Trail is a planned 11-mile north-south trail through western Toledo, Ohio, named for the railroad that once used its corridor. It follows part of the former Toledo Terminal Railroad, a belt line around the city that opened in 1903. The Chessie System took complete control of the Toledo Terminal in 1984, and in 2010 its successor, CSX, petitioned to abandon the rest of the line west of the Maumee River. The trail is a partnership among Metroparks Toledo, the University of Toledo, the City of Toledo, the Wood County Port Authority and the Wood County Park District. This record maps about 4.4 miles of built sections, in several pieces.

The northern end is at Bowman Park on Jackman Road and the southern end at River Road near the Maumee River. On the way the trail crosses over Interstate 475 and serves Ottawa Park, Highland Park and the University of Toledo; when finished it is to connect the university's main campus with its Health Science campus. Several stretches still use streets, and the fully off-road sections are Bowman Park to Monroe Street, Ottawa Park to the university, and Medford Drive to River Road. By early 2017 the city had finished the section from Laskey Road to Monroe Street, and plans called for a bridge over the Maumee River into Perrysburg Township.

Metroparks Toledo owns a 1.4-mile section, begun in fall 2016, from Glanzman Road, across from Beverly Elementary School, over Detroit Avenue to River Road, including a bike and pedestrian bridge over the Anthony Wayne Trail. More than 55,000 people used it in 2018. A trailhead with parking, a restroom, a bike rack and a FixIt repair station opened on Copeland Avenue in November 2019. Other parking is at Bowman Park, Ottawa Park and Highland Park. The surface is asphalt with some compacted stone.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 68% of this route as an abandoned rail line.

Shade

15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Toledo Metcalf Field, 15.8 km from the trail's middle, 2 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343646607181858276645038
Low °F202229405161656355453426
Precipitation, in1.81.82.33.33.53.23.23.53.12.42.32.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1900 Toledo sheet (1:62,500); the 1952 Toledo sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Toledo, 1900–1903: Toledo Terminal Railroad's Old Bates Tower
Toledo, 1900–1903: Toledo Terminal Railroad's Old Bates TowerPhoto: Toledo Lucas County Public Library · No Copyright - United States · Digital Public Library of America (opens in a new tab)

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Toledo Terminal Railroad — Wikipedia · organization · checked Oct 14, 2026
    Supports: belt line opened 1903, Chessie took complete control in 1984, CSX 2010 petition to abandon the line west of the Maumee River, rail-trail plans for the right-of-way
  3. Chessie Circle Trail — Metroparks Toledo · web · checked Oct 14, 2026
    Supports: named for the railroad that used the corridor, 11 miles planned, main campus to Health Science campus, Metroparks section from Glanzman Road across from Beverly Elementary over Detroit Avenue to River Road, bridge over the Anthony Wayne Trail
  4. Trailhead Added Along Chessie Circle Trail — Metroparks Toledo (2019-11-19) · web · checked Oct 14, 2026
    Supports: Copeland Avenue trailhead with restroom, bike rack and FixIt station; Metroparks owns 1.4 miles of the 11-mile trail; more than 55,000 users in 2018
  5. Metroparks gets OK to link paths to parks — The Blade (2017-01-26) · web · checked Oct 14, 2026
    Supports: partnership of Metroparks, University of Toledo, City of Toledo, Wood County Port Authority and Wood County Park District; Metroparks construction begun fall 2016 on the 1.4-mile Glanzman Road to River Road section; city section Laskey Road to Monroe Street complete; planned Maumee River bridge to Perrysburg Township
  6. Chessie Circle Trail — TrailLink · web · checked Oct 14, 2026
    Supports: corridor of the former Toledo Terminal Railroad; endpoints Bowman Park at Jackman Road and River Road; crossing over I-475; Ottawa Park, Highland Park, University of Toledo; on-road stretches and off-road sections; parking at Bowman, Ottawa and Highland parks; asphalt and compacted stone
  7. Chessie Circle Trail — OpenStreetMap ways · web · checked Oct 14, 2026
    Supports: record extent: built pieces between Jackman Road and River Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.