States › Missouri

Chouteau Trafficway Trail

Greenway in Missouri · OpenStreetMap relation

Runs through Kansas City and North Kansas City · Clay and Jackson counties

Conditions now

Loading the weather near Kansas City…

Forecast by the National Weather Service for Kansas City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.6 mi 7.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Northeast Chouteau Parkway mile 3 directions to trailhead 1
  2. Parking at Northeast Chouteau Parkway mile 3 directions to trailhead 2
  3. Parking at Northeast Chouteau Parkway mile 3.1 directions to trailhead 3
  4. Parking at Northeast Chouteau Parkway mile 3.1 directions to trailhead 4
Chouteau Bridge, beside the trail (opens in a new tab)
Chouteau Bridge, beside the trail · Photo: Krib · Public domain · Wikimedia Commons

About this trail

The Chouteau Trafficway Trail is a concrete bicycle and pedestrian path beside Chouteau Trafficway, Missouri Route 269, north of the Missouri River in Kansas City, Missouri. The name comes from OpenStreetMap, where the path is mapped as a local bicycle route. It was built in the city's Chouteau Parkway project, which began in April 2012 to widen the trafficway between Interstate 35 and Route 210. A city Capital Projects spokesman said the work would bring the road up to the city's parkway standard as part of its Millennium Parkway Network. The $33 million project required the purchase of 31 properties for demolition and included a sidewalk on the east side, a concrete bicycle and pedestrian trail along the full length of the west side, a landscaped median, lighting and rain gardens; completion was expected by spring 2014.

Route 269 runs three miles from Front Street in Kansas City across the Missouri River to an interchange with Route 210 in North Kansas City, then north to Interstate 35. At its south end the path meets the bicycle and pedestrian facilities on the Chouteau Bridge, which the Missouri Department of Transportation opened on November 5, 2010: eight-foot barrier-separated shared paths on both sides of the bridge and sidewalks through the Route 210 interchange, one of them 10 feet wide to meet shared-use path criteria. At the time, the Missouri Bicycle and Pedestrian Federation noted that these would connect to planned paths along Chouteau Trafficway to the north.

Kansas City's parks master plan lists the Chouteau Greenway along Northeast Chouteau Trafficway between Northeast Parvin Road and Interstate 35, with broad pavement in good condition, landscaping, sculpture and the Francois Chouteau and Native American Heritage Monument, and suggests a trail map, wayfinding signs, seating and shade. The route mapped here totals about 4.6 miles, including paths on both sides of the road in places.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kansas City Downtown Airport, 6.7 km from the trail's middle, 35 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404557677686908980685444
Low °F222636465767727061493627
Precipitation, in11.52.13.95.15.34.44.73.83.21.81.3
Snow, in3.43.20.40.1000000.30.13.5
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Kansas City sheet (1:125,000); the 1951 North Kansas City sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10596764, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Missouri Route 269 — Wikipedia · organization · checked Oct 15, 2026
    Supports: Route 269 is Chouteau Trafficway, about three miles from Front Street to I-35, with an interchange with Route 210 in North Kansas City
  3. Second Kansas City Missouri River bike/ped crossing opens today - Chouteau Trafficway — Missouri Bicycle and Pedestrian Federation · organization · checked Oct 15, 2026
    Supports: MoDOT ribbon cutting November 5, 2010 for the Chouteau Bridge paths; eight-foot traffic-separated shared paths on both sides; sidewalks through the Route 210 interchange, one 10 feet wide to meet shared-use path criteria; connection to planned paths along Chouteau Trafficway to the north
  4. Page 170 - KCMO Parks Master Plan 2032 — Kansas City Parks and Recreation · organization · checked Oct 15, 2026
    Supports: Chouteau Greenway along N.E. Chouteau Trafficway between N.E. Parvin Road and I-35; broad pavement in good condition, landscaping, sculpture, Francois Chouteau and Native American Heritage Monument; suggested trail map and wayfinding signage, seating, shade
  5. City begins Chouteau Parkway construction — Northeast News (May 2, 2012) · press · checked Oct 15, 2026
    Supports: construction underway on Chouteau Trafficway from I-35 to Highway 210; parkway standard and Millennium Parkway Network (Sean Demory, Capital Projects Department); 31 properties bought; $33 million; east-side sidewalk and west-side concrete bicycle and pedestrian trail along the full length; median, lighting, rain gardens; completion expected spring 2014
  6. Chouteau and Parvin to close for construction — Northeast News (May 30, 2012) · press · checked Oct 15, 2026
    Supports: improvements began in April 2012; widening from two to four lanes from I-35 to Highway 210 with a concrete bicycle trail
  7. Chouteau Trafficway Trail (relation 10596764) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: route name; concrete surface; mapped length about 4.6 miles including paths on both sides in places

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.