Clarksville Greenway
Rail-trail in Tennessee · OpenStreetMap relation
Runs through Clarksville · Montgomery County
Conditions now
Loading the weather near Clarksville…
Forecast by the National Weather Service for Clarksville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Amanda Drive mile 0 directions to trailhead 1
- Parking at Amanda Drive mile 0 directions to trailhead 2
- Parking at McClardy Road mile 0.1 directions to trailhead 3
- Parking at McClardy Road mile 0.2 directions to trailhead 4
- Parking at McClardy Road mile 0.2 directions to trailhead 5
- Parking at Stonecrossing Drive mile 0.4 directions to trailhead 6
- Parking mile 0.5 · water directions to trailhead 7
- Parking mile 0.5 · water directions to trailhead 8
- Parking at Peachers Mill Road mile 0.8 directions to trailhead 9
- Parking at East Pine Mountain Road mile 1 directions to trailhead 10
- Parking at East Pine Mountain Road mile 1.2 directions to trailhead 11
- Parking at Clarksville Greenway mile 1.3 directions to trailhead 12
(opens in a new tab) About this trail
The Clarksville Greenway is a paved trail in Clarksville, Tennessee, maintained by the City of Clarksville's Parks and Recreation Department. Local reporting describes the whole greenway as a 9-mile paved trail designed in the spirit of the rails-to-trails movement, which turns abandoned railroad rights of way and river corridors into walking and biking trails. This record covers about 5.6 miles of the northern greenway, which runs south from the Peachers Mill Road area toward the Red River.
The greenway has been built in stages. On January 5, 2015, the city opened Section I of the Heritage Park Greenway Connection, 0.3 mile from Mary's Oak Trailhead to Peachers Mill Road, bringing the greenway to 4.55 miles. From north to south the access points are Heritage Park, Mary's Oak Drive Park and the Pollard Road Trailhead; south of the river, the Red River East Trailhead at 820 Kraft Street opened on April 24, 2021, on a trail linking the Clarksville Riverwalk and Austin Peay State University's greenway trail. The Raymond C. Hand Pass carries the trail over a ravine.
The missing link is a pedestrian bridge over the Red River, 290 feet long and 10 feet wide, at the site of a former railroad bridge, to join the southern tip of the northern greenway just east of Quarry Road with the Red River East and Austin Peay trails. The city broke ground on July 1, 2025, on the $5.8 million project, 80 percent funded by TDOT's Transportation Alternatives Program, and closed two greenway sections for construction, with completion anticipated in March 2026. That March, Clarksville Now reported the project stalled over its design and the reuse of the old railroad abutments, which the city was having independently evaluated. Once finished, the city says the connection will create about 11 miles of continuous greenway.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
64% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Clarksville Wwtp, 4 km from the trail's middle, 5 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 47 52 61 72 79 87 90 90 84 72 60 50 Low °F 28 31 38 47 57 65 69 67 60 48 37 31 Precipitation, in 4 4.5 4.8 5 5.6 4.7 4.6 3.7 3.4 4.3 4.1 4.9 Snow, in 0.3 0.1 0.1 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1944 Clarksville sheet (1:50,000); the 1957 Clarksville sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9735977, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Hiking in Clarksville: Bridges and berms on the Clarksville Greenway (October 12, 2022) — ClarksvilleNow.com · web · checked Oct 15, 2026 Supports: 9-mile paved trail; designed as part of the rails-to-trails idea per the city; Raymond C. Hand Pass bridge over a ravine; access points north to south: Heritage Park, Mary's Oak Drive Park, Pollard Road Trailhead, Red River Trailhead on Kraft Street; bridge planned over the Red River
- Clarksville Greenway is growing (January 5, 2015) — ClarksvilleNow.com · web · checked Oct 15, 2026 Supports: City of Clarksville Parks & Recreation Department; Section I of the Heritage Park Greenway Connection opened January 5, 2015; 0.3 mile from Mary's Oak Trailhead to Peachers Mill Road; total length then 4.55 miles; parks staff to maintain
- New Red River East Trailhead opens next week, expanding Clarksville Greenway system (April 15, 2021) — ClarksvilleNow.com · web · checked Oct 15, 2026 Supports: Red River East Trailhead at 820 Kraft Street opening April 24, 2021; new trail connects the Clarksville Riverwalk, Red River and APSU's greenway trail
- Red River Pedestrian Bridge gets more grant funding, bringing estimated total to $4.1 million (August 5, 2024) — ClarksvilleNow.com · web · checked Oct 15, 2026 Supports: bridge 290 feet long and 10 feet wide at the site of a former railroad bridge; final link between the Riverwalk and the Greenway
- 'This is an exciting landmark moment': Clarksville breaks ground on Red River Pedestrian Bridge project (July 1, 2025) — ClarksvilleNow.com · web · checked Oct 15, 2026 Supports: groundbreaking July 1, 2025; connects Red River East and APSU trails to the Pollard Road Trail; about 11 miles of continuous greenway per city release; $5.8 million, TDOT Transportation Alternatives Program covering 80 percent; two greenway sections closed until completion, anticipated March 2026
- Red River Pedestrian Bridge project stalled over questions about design, existing abutments (March 16, 2026) — ClarksvilleNow.com · web · checked Oct 15, 2026 Supports: bridge to connect to the southern tip of the existing greenway just east of Quarry Road; design and abutment problems; abutments formerly supported a railroad bridge; independent evaluation
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.