States › Michigan

Coalwood Trail

Rail-trail in Michigan

Runs through Chatham, Rock River Township and Au Train Township · Alger County

Conditions now

Loading the weather near Munising…

Forecast by the National Weather Service for Munising · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Michigan DNR Parks and Recreation Division.2

Length
11.1 mi 17.9 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Au Train River, beside the trail (opens in a new tab)
Au Train River, beside the trail · Photo: Unknown authorUnknown author or not provided · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Coalwood Trail is a rail-trail on a former railroad grade in Alger County, in Michigan's Upper Peninsula, running east and west through the Hiawatha National Forest southeast of Munising. The Michigan Department of Natural Resources Parks and Recreation Division administers it; the state's rail-trail inventory lists most of the corridor as U.S. Forest Service land, with some segments owned by the DNR. The grade once carried the Munising Railroad, and the trail is named for Coalwood, a settlement that grew up around a train station built in 1901 and had a post office from 1906 to 1910. Finnish immigrant families there cut cordwood for the Cleveland Cliffs Iron Company between 1900 and 1912; nothing of the settlement stands today.

This record covers about 11 miles of the western part of the grade, which runs between Munising and Chatham. In the DNR inventory this section is open to hiking, mountain biking and horseback riding, and its westernmost miles are shared with snowmobile trail 8. East of it, the grade continues east as part of ORV Route C and snowmobile trail 8, a motorized section on which the DNR inventory does not list bicycling.

The DNR lists the surface as natural dirt. In 2020 the Forest Service, working with the Hiawatha National Forest and the DNR, reopened the trail after building a new DOTY Bridge to replace a temporary span in place since 2000, with part of the funding through the Michigan Department of Transportation. In winter the Snowmobile and ORV Association of Alger County grooms the trail for snowmobiling.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

43% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Chatham 1 SE, 4 km from the trail's middle, 20 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F242635476170767467534029
Low °F9716273848525246352516
Precipitation, in2.51.92.12.83.43.53.32.944.43.42.7
Old maps

USGS topographic maps of the trail's middle go back to the 1958 Au Train sheet (1:62,500); the 1958 Marquette sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “managing_org from Michigan DNR Statewide Railtrails”
  3. Statewide Railtrails (DNR Trails Open Data map service, layer 16) — Michigan Department of Natural Resources · government source · checked Oct 15, 2026
    Supports: administered by DNR Parks and Recreation Division; ownership US Forest Service and DNR by segment; Alger County; rail-trail; natural dirt surface; nonmotorized segments with hiking, mountain biking and equestrian use permitted and open; western segments shared with snowmobile trail UP 8; eastern Coalwood grade segments are ORV C Route and UP 8, motorized, biking 'No' (queried 2026-10-14 by RailGradeName 'Coalwood Trail')
  4. October 13, 2016 — Social Sciences Newsblog, Michigan Technological University · organization · checked Oct 15, 2026
    Supports: Coalwood a former logging settlement in the Hiawatha National Forest, occupied by Finnish immigrant families who cut cordwood for the Cleveland Cliffs Iron Company between 1900 and 1912
  5. The Coalwood Grade Trail re-opens following completed construction of DOTY Bridge — WLUC TV6 (December 14, 2020) · web · checked Oct 15, 2026
    Supports: old railroad grade through the Hiawatha National Forest southeast of Munising in Alger County; trail No. 8, an east-west snowmobile connector; new DOTY Bridge replaced a temporary bridge in place since 2000; USDA Forest Service with Hiawatha National Forest and Michigan DNR; MDOT funding share; SORVA grooms the trail in winter
  6. Absolutely Nothing Left in the Ghost Town of Coalwood, Michigan — 99.1 WFMK (February 9, 2023) · web · checked Oct 15, 2026
    Supports: Munising Railroad on the grade; Coalwood created around a train station built in 1901; post office September 1906 to July 1910; no buildings remain; trail runs between Munising and Chatham

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.