Concord & Claremont
Rail-trail in New Hampshire
Runs through Sunapee, Newbury, Bradford, Warner, Contoocook, Hopkinton and Concord · Sullivan and Merrimack counties
Conditions now
Loading the weather near Bradford…
Forecast by the National Weather Service for Bradford · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Concord and Claremont Railroad was an American railroad company during the mid-nineteenth century in New Hampshire spanning from Concord to Claremont.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at State Route 103 restrooms directions to trailhead 1
- Parking at Riverside Lane directions to trailhead 2
(opens in a new tab) About this trail
This record gathers about 10.6 miles of mapped path on scattered, unconnected pieces of the former Concord and Claremont Railroad in New Hampshire, from western Concord through Hopkinton, Warner, Bradford and Newbury to Sunapee. Most of that corridor is the route of the Concord-Lake Sunapee Rail Trail, a gravel multi-use trail planned for about 34 miles from Concord to Newbury at Lake Sunapee, of which some sections are complete. The Friends of the Concord-Lake Sunapee Rail Trail, formed in early 2018, are building it by negotiating easements along the old right-of-way. The railroad opened on September 21, 1848; passenger service ended in 1955, and freight ended at Contoocook in 1961, Bradford in 1964 and Newport in 1977.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Claremont - Concord and Abandoned. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
71% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Newport, 21 km from the trail's middle, 27 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 29 32 41 54 66 75 80 79 71 58 46 35 Low °F 9 10 19 30 42 52 56 54 47 36 27 17 Precipitation, in 2.7 2.4 3 3.3 3.3 4.2 4.2 3.8 3.5 4.9 3.2 3.5 Snow, in 15.2 16.7 12.7 3.3 0 0 0 0 0 0.5 2.8 14.9 - On the National Register
- Hopkinton Railroad Covered Bridge, Hopkinton · structure, listed 1980 · nomination file for Hopkinton Railroad Covered Bridge
- Contoocook Railroad Depot, Hopkinton · building, listed 2006 · nomination file for Contoocook Railroad Depot
- Old maps
USGS topographic maps of the trail's middle go back to the 1928 Mount Kearsarge sheet (1:62,500); the 1956 Mt. Kearsarge sheet (1:62,500) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 4
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Concord-Lake Sunapee Rail Trail
- FacebookConcord-Lake Sunapee Rail Trail (Facebook)
- RedditSearch Reddit: r/newhampshire
Nearby trails
- Stevens Rail Trail 0.6 mi away · 1.4 mi, gravel
- Concord-Lake Sunapee Trail 1.5 mi away · 2.4 mi, crushed stone
- Sugar River Trail 2.9 mi away · 9.1 mi, dirt
- Northern Rail Trail 3.9 mi away · 58.0 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Concord and Claremont Railroad”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q1124074, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Concord-Lake Sunapee Rail Trail — Wikipedia · organization · checked Oct 13, 2026 Supports: 34-mile gravel multi-use trail from Concord to Newbury at Lake Sunapee through Hopkinton, Warner, Sutton and Bradford, under construction with some sections complete, Friends group formed early 2018 negotiating easements, railroad opened September 21, 1848, passenger service ended 1955, freight ended at Contoocook 1961, Bradford 1964 and Newport 1977
- Trail Highlights — Friends of the Concord-Lake Sunapee Rail Trail · press · checked Oct 13, 2026 Supports: the old Concord and Claremont line through Concord, Hopkinton, Warner, Sutton, Bradford and Newbury; the Friends' work with landowners, towns and agencies
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.



