States › Massachusetts

Connecticut Riverwalk & Bikeway, North

Greenway in Massachusetts · OpenStreetMap relation

Runs through Chicopee · Hampden County

Conditions now

Loading the weather near Chicopee…

Forecast by the National Weather Service for Chicopee · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.6 mi 4.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Medina Street mile 0 directions to trailhead 1
  2. Trailhead at Paderewski Street mile 0.1 directions to trailhead 2
  3. Trailhead at Jones Ferry Road mile 1.3 directions to trailhead 3
  4. Trailhead at Ferry Street mile 2.5 directions to trailhead 4
  5. Parking at Ferry Street mile 2.5 directions to trailhead 5
  6. Parking at Ferry Street mile 2.5 directions to trailhead 6

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Connecticut River Walk and Bikeway, Chicopee MA (opens in a new tab)
Connecticut River Walk and Bikeway, Chicopee MA · Photo: John Phelan · CC BY 4.0 · Wikimedia Commons

About this trail

The Connecticut Riverwalk & Bikeway, North is a multi-use path of about 2.6 miles along the Connecticut River in the Willimansett neighborhood of Chicopee, Massachusetts, between the Medina Street boat ramp and Nash Field, on riverside land beside the city's flood control levee. It is the Chicopee section of the Connecticut River Walk and Bikeway, a planned 20-mile riverside corridor linking Agawam, Chicopee, Springfield and West Springfield. It is not a rail trail.

A City of Springfield brochure listed the Chicopee section as under design: 4.9 miles in all, with the Interstate 391 corridor bringing the route north from Plainfield Street to downtown Chicopee and, beyond the Chicopee River, the riverside land west of the flood control dike between the Medina Street boat ramp and Nash Field. The City of Chicopee used Community Development Block Grant funds to hire the engineering firm BETA to design a path along a 2.8-mile corridor. In February 2022 the path, 2.4 miles from the city's water treatment plant to Nash Field, was being built on the levee, with plans to extend it east to downtown and then south to the Springfield Riverwalk, about 2.5 miles away. No source found gives an opening date.

The design connects to a state boat ramp at the south end and Nash Field at the north, with ADA-compliant connections across the dike to neighborhood streets. A prefabricated bridge was proposed to carry the path over a 65-foot span at the outfall channel of a stormwater pumping station, and the design included overlooks, one near a bald eagle's nest, and signs on the flood control system and the river's history. In 2020 the city said that, as a city park, the path would be open from sunrise to sunset and would not be lit.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

39% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Westfield Barnes Municipal Airport, 7.5 km from the trail's middle, 66 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353847607280858375635140
Low °F161726354655615951393022
Precipitation, in2.82.63.44.13.74.44.23.74.64.73.53.6
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Springfield sheet (1:62,500); the 1958 Mount Tom sheet (1:24,000) shows the area at mid-century. Browse all 23 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18754874, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Connecticut River Walk and Bikeway brochure — City of Springfield Parks · government source · checked Oct 13, 2026
    Supports: planned 20-mile corridor and towns, Chicopee section under design at 4.9 miles, I-391 corridor from Plainfield Street to downtown, riverside land west of the dike between the Medina Street boat ramp and Nash Field
  3. New Trails We Can Look Forward to in Central and Western Mass. This Year — Streetsblog Massachusetts (February 8, 2022) · press · checked Oct 13, 2026
    Supports: 2.4 miles from the water treatment plant to Nash Field around Willimansett, under construction on the flood control levee, plans to extend east to downtown and south to the Springfield Riverwalk about 2.5 miles away
  4. Connecticut Riverwalk North — BETA Group · web · checked Oct 13, 2026
    Supports: City of Chicopee and CDBG-funded design, 2.8-mile corridor, state boat ramp and Nash Field connections, dike connections, ADA, proposed prefabricated bridge over a 65-foot outfall span, overlooks including one near a bald eagle nest, interpretive signs
  5. Residents express concerns about Connecticut Riverwalk — The Reminder (February 26, 2020) · web · checked Oct 13, 2026
    Supports: Medina Street boat ramp to Nash Field, path open sunrise to sunset as a city park, no lighting planned

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.