Contra Costa Canal Trail
Canal towpath in California · OpenStreetMap relation
Runs through Pacheco, Martinez, Concord, Pleasant Hill, Walnut Creek and Contra Costa Centre · Contra Costa County
Conditions now
Loading the weather near Pleasant Hill…
Forecast by the National Weather Service for Pleasant Hill · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by East Bay Regional Park District.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Paso Nogal Road mile 1.5 directions to trailhead 1
- Overflow Parking Lot mile 1.6 directions to Overflow Parking Lot
- Lot 7 mile 1.7 directions to Lot 7
- Lot 6 mile 1.8 directions to Lot 6
- Parking at Morello Avenue mile 2.5 directions to trailhead 5
- Parking at Morello Avenue mile 2.7 directions to trailhead 6
- Parking at Taylor Boulevard mile 2.7 directions to trailhead 7
- Parking at Taylor Boulevard mile 2.7 directions to trailhead 8
- Parking at Morello Avenue mile 2.7 directions to trailhead 9
- Parking at Gregory Lane mile 4 directions to trailhead 10
- Parking at Purslone mile 4.1 directions to trailhead 11
- Parking at Gregory Lane mile 4.1 directions to trailhead 12
- Parking at Oak Road mile 6.7 · restrooms directions to trailhead 13
- Parking at Bancroft Road mile 7.8 directions to trailhead 14
- Parking at Amberwood Lane mile 7.9 directions to trailhead 15
- Parking at Graymont Circle mile 8.9 directions to trailhead 16
- Parking at Via Montanas mile 11.1 directions to trailhead 17
- Parking at B Street mile 11.8 directions to trailhead 18
- Parking at Trailside Circle mile 11.9 directions to trailhead 19
- Parking at Trailside Circle mile 11.9 directions to trailhead 20
- Parking at Trailside Circle mile 11.9 directions to trailhead 21
- Parking at Trailside Circle mile 11.9 directions to trailhead 22
- Parking at Trailside Circle mile 11.9 directions to trailhead 23
- Parking at Wren Avenue mile 13.3 directions to trailhead 24
(opens in a new tab) About this trail
The Contra Costa Canal Trail, which the East Bay Regional Park District calls the Contra Costa Canal Regional Trail, is a paved multi-use path along the Contra Costa Canal in central Contra Costa County, California. The park district describes it as one of the most popular trails in its system, created through a cooperative effort of the Contra Costa Water District, the U.S. Bureau of Reclamation and the park district. The Bureau of Reclamation began building the canal in the 1930s to supply irrigation water; construction started in 1937 and, delayed by World War II, was completed in 1948. The 47-mile canal carries water pumped from the Sacramento-San Joaquin Delta near Rock Slough to Martinez, where it is treated for city water supplies, so swimming and fishing in it are not permitted. The Contra Costa Water District maintains the canal.
The trail follows a horseshoe-shaped route through Martinez, Pleasant Hill, Walnut Creek and Concord, passing Las Juntas Park in Pleasant Hill, Larkey Park and Heather Farm Park in Walnut Creek, and Lime Ridge in Concord. It connects with the California Riding and Hiking Trail, the Briones to Mt. Diablo Trail and the Iron Horse Regional Trail, and the district expects it to connect with the Delta de Anza Trail once that work reaches Martinez. The route reaches schools, commercial areas, BART and County Connection buses. The record's map line covers about 13.5 miles.
The trail is open from 5 a.m. to 10 p.m. unless otherwise posted. Bicycles, e-bikes, dogs and horses are allowed, and the district lists the trail as wheelchair accessible. The Contra Costa Water District is conducting annual maintenance along the trail throughout 2026, and brief closures may be required.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Concord Wwtp, 2.8 km from the trail's middle, 16 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 58 63 68 72 78 85 88 88 86 78 67 59 Low °F 42 44 47 49 53 57 58 59 58 53 46 41 Precipitation, in 3.5 3.6 2.6 1.2 0.6 0.1 0 0 0.1 0.7 1.9 3.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1897 Concord sheet (1:62,500); the 1959 Walnut Creek sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2024 and 2025 used the canal and Iron Horse trails to reach Pleasant Hill BART, and several preferred it over Walnut Creek BART as a Mount Diablo start or finish. r/BAbike, Mar 2024 · r/BAbike, Apr 2025 · r/BAbike, May 2025
- Riders in April 2026 split on the canal trail versus Treat Boulevard: one preferred Treat for fewer slowdowns, another liked the trail for having only two big signaled crossings. r/BAbike, Apr 2026
- One rider in 2024 named Black Bear Diner at Bancroft and Treat, beside the trail; another in 2025 said the Walnut Creek Sports Basement near the trail rents bikes. r/BAbike, Jun 2024 · r/bayarea, Apr 2025
8 Reddit threads about this trail, Mar 2024 to Apr 2026
- Morgan Territory is a beautiful ride r/BAbike · Apr 2026 · 16 comments
- Route suggestions for peninsula cyclist that wants to do Mt Diablo tomorrow? r/BAbike · May 2025 · 20 comments
- Oakland to Diablo one way r/BAbike · Mar 2024 · 21 comments
- Mt Diablo: how to get back to North Gate from the South Gate r/BAbike · Apr 2025 · 16 comments
- Bike rental on or really near trails? r/bayarea · Apr 2025 · 3 comments
- Any good coffee shop/ pit stops in Walnut Creek? r/BAbike · Jun 2024 · 7 comments
- Best bike route from Concord to San Ramon r/BAbike · Jul 2025 · 9 comments
- Nearby town with 20+ miles of multi-use trails r/BAbike · May 2024 · 30 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesAlerts & Closures — East Bay Regional Park District
- RedditSearch Reddit: r/California
Nearby trails
- Ygnacio Canal Trail within 0.2 mi · 5.8 mi, paved
- Iron Horse Regional Trail within 0.2 mi · 32.0 mi, paved
- Monument Corridor 1.2 mi away · 1.3 mi, paved
- Delta de Anza Regional Trail 1.3 mi away · 19.5 mi, paved
- Lafayette-Moraga Trail 2.9 mi away · 7.5 mi, paved
- San Francisco Bay Trail 3.1 mi away · 174 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1710782, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Contra Costa Canal Regional Trail — East Bay Regional Park District · organization · checked Oct 15, 2026 Supports: name, paved multi-use, popularity, cooperative creation, canal history (1930s, Bureau of Reclamation, delayed by WWII), Rock Slough to Martinez, no swimming or fishing, CCWD maintenance, horseshoe route, cities and parks, trail connections, Delta de Anza plan, BART and County Connection, hours, bikes/e-bikes/dogs/horses, wheelchair access, 2026 maintenance closures notice
- Contra Costa Canal — Wikipedia · organization · checked Oct 15, 2026 Supports: 47-mile length, construction 1937 to 1948, trail managed by East Bay Regional Park District
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.